首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 62 毫秒
1.
Despite the success of network techniques for planning maintenance and construction projects there has been little application in R & D. Extensions to network planning techniques to allow their use in R & D are described and potential areas of cost and benefit stemming from their use identified. Some applications of planning methods in R & D are considered and conclusions are drawn concerning the difficulties to be faced, and the strategies to be adopted, in their implementation.  相似文献   

2.
The business environment is full of uncertainty. Allocating the wealth among various asset classes may lower the risk of overall portfolio and increase the potential for more benefit over the long term. In this paper, we propose a mixed single-stage R&D projects and multi-stage securities portfolio selection model. Specifically, we present a bi-objective mixed-integer stochastic programming model. Moreover, we use semi-absolute deviation risk functions to measure the risk of mixed asset portfolio. Based on the idea of moments approximation method via linear programming, we propose a scenario generation approach for the mixed single-stage R&D projects and multi-stage securities portfolio selection problem. The bi-objective mixed-integer stochastic programming problem can be solved by transforming it into a single objective mixed-integer stochastic programming problem. A numerical example is given to illustrate the behavior of the proposed mixed single stage R&D projects and multi-stage securities portfolio selection model.  相似文献   

3.
This study develops a new use of data envelopment analysis for estimating a stochastic frontier cost function that is assumed to have two different error components: a one-sided disturbance (representing technical and allocative inefficiencies) and a two-sided disturbance (representing an observational error). The two error components are handled by data envelopment analysis in combination with goal programming/constrained regression. The approach proposed in this study can avoid several statistical assumptions used in conventional methods for estimating a stochastic frontier function. As an important application, this study uses the estimation technique to obtain an AT&T stochastic frontier cost function. As a result, this study measures technical and allocative efficiencies of AT&T production process and review its natural monopoly issue. The estimated stochastic frontier cost function is also compared with the other cost function models used for previous studies concerning the divestiture of the telephone industry.  相似文献   

4.
Maintaining a rich research and development (R&D) pipeline is the key to remaining competitive in many industrial sectors. Due to its nature, R&D activities are subject to multiple sources of uncertainty, the modeling of which is compounded by the ability of the decision maker to alter the underlying process. In this paper, we present a multi-stage stochastic programming framework for R&D pipeline management, which demonstrates how essential considerations can be modeled in an efficient manner including: (i) the selection and scheduling of R&D tasks with general precedence constraints under pass/fail uncertainty, and (ii) resource planning decisions (expansion/contraction and outsourcing) for multiple resource types. Furthermore, we study interdependencies between tasks in terms of probability of success, resource usage and market impact. Finally, we explore risk management approaches, including novel formulations for value at risk and conditional value at risk.  相似文献   

5.
A major advance in the development of project selection tools came with the application of options reasoning in the field of Research and Development (R&D). The options approach to project evaluation seeks to correct the deficiencies of traditional methods of valuation through the recognition that managerial flexibility can bring significant value to projects. Our main concern is how to deal with non-statistical imprecision we encounter when judging or estimating future cash flows. In this paper, we develop a methodology for valuing options on R&D projects, when future cash flows are estimated by trapezoidal fuzzy numbers. In particular, we present a fuzzy mixed integer programming model for the R&D optimal portfolio selection problem, and discuss how our methodology can be used to build decision support tools for optimal R&D project selection in a corporate environment.  相似文献   

6.
This paper contributes to the literature on the problem of allocation of resources to a set of risky investments. Our objective is to develop the ideas in the context of a research and development laboratory. A mathematical programming approach to the resource allocation problem is taken, and various forms for an objective function under risk are discussed. A probabilistic objective function appropriate to R & D is isolated and tested on a small hypothetical example. Parametric linear programming is used to yield a near-optimum allocation.  相似文献   

7.
In the project selection problem a decision maker is required to allocate limited resources among an available set of competing projects. These projects could arise, although not exclusively, in an R&D, information technology or capital budgeting context. We propose an evolutionary method for project selection problems with partially funded projects, multiple (stochastic) objectives, project interdependencies (in the objectives), and a linear structure for resource constraints. The method is based on posterior articulation of preferences and is able to approximate the efficient frontier composed of stochastically nondominated solutions. We compared the method with the stochastic parameter space investigation method (PSI) and illustrate it by means of an R&D portfolio problem under uncertainty based on Monte Carlo simulation.  相似文献   

8.
Park and Ride facilities (P&R) are car parks at which users can transfer to public transportation to reach their final destination. We propose a mixed linear programming formulation to determine the location of a fixed number of P&R facilities so that their usage is maximized. The facilities are modeled as hubs. Commuters can use one of the P&R facilities or choose to travel by car to their destinations, and their behavior follows a logit model. We apply a p-hub approach considering that users incur in a known generalized cost of using each P&R facility as input for the logit model. For small instances of the problem, we propose a novel linearization of the logit model, which allows transforming the binary nonlinear programming problem into a mixed linear programming formulation. A modification of the Heuristic Concentration Integer (HCI) procedure is applied to solve larger instances of the problem. Numerical experiments are performed, including a case in Queens, NY. Further research is proposed.  相似文献   

9.
Existing tools for making R&D investment decisions cannot properly capture the option value in R&D. Since many new products are identified as failures during the R&D stages, the possibility of refraining from market introduction may add a significant value to the NPV of the R&D project. This paper presents new theoretical insight by developing a stochastic jump amplitude model in a real setting. The option value of the proposed model depends on the expected number of jumps and the expected size of the jumps in a particular business. The model is verified with empirical knowledge of current research in the field of multimedia at Philips Corporate Research. This way, the gap between real option theory and the practice of decision making with respect to investments in R&D is diminished.  相似文献   

10.
In this paper we consider a stochastic R&D decision model for a single firm operating in a competitive environment. The study focuses on the firm's optimal policy which maximizes the expected discounted net return from the project. The firm's policy is composed of two ingredients: a stopping time which determines when the developed technology should be introduced and protected by a patent, and an investment strategy which specifies the expenditure rate throughout the R&D program. The main findings of the study are:
  • (a) 
    Under a constant expenditure rate strategy, the optimal stopping time of the project is a control limit policy of the following form: stop whenever the project's state exceeds a fixed critical value, or when a similar technology is introduced and protected by one of the firm's rivals, whichever occurs first.
  • (b) 
    For a R&D race model in which the winner-takes-all competition and the loser's return is zero, we show that the firm's optimal expenditure rate throughout the R&D program increases monotonically as a function of the project's state.
In order to gain a better insight regarding optimal R&D programs in competitive markets we examine the effect of key economic parameters on the firm's optimal policy.  相似文献   

11.
Although stochastic programming is a powerful tool for modeling decision-making under uncertainty, various impediments have historically prevented its wide-spread use. One factor involves the ability of non-specialists to easily express stochastic programming problems as extensions of their deterministic counterparts, which are typically formulated first. A second factor relates to the difficulty of solving stochastic programming models, particularly in the mixed-integer, non-linear, and/or multi-stage cases. Intricate, configurable, and parallel decomposition strategies are frequently required to achieve tractable run-times on large-scale problems. We simultaneously address both of these factors in our PySP software package, which is part of the Coopr open-source Python repository for optimization; the latter is distributed as part of IBM’s COIN-OR repository. To formulate a stochastic program in PySP, the user specifies both the deterministic base model (supporting linear, non-linear, and mixed-integer components) and the scenario tree model (defining the problem stages and the nature of uncertain parameters) in the Pyomo open-source algebraic modeling language. Given these two models, PySP provides two paths for solution of the corresponding stochastic program. The first alternative involves passing an extensive form to a standard deterministic solver. For more complex stochastic programs, we provide an implementation of Rockafellar and Wets’ Progressive Hedging algorithm. Our particular focus is on the use of Progressive Hedging as an effective heuristic for obtaining approximate solutions to multi-stage stochastic programs. By leveraging the combination of a high-level programming language (Python) and the embedding of the base deterministic model in that language (Pyomo), we are able to provide completely generic and highly configurable solver implementations. PySP has been used by a number of research groups, including our own, to rapidly prototype and solve difficult stochastic programming problems.  相似文献   

12.
The subject of this paper is to study a realistic planning environment in wafer fabrication for the control or dummy (C/D) wafers problem with uncertain demand. The demand of each product is assumed with a geometric Brownian motion and approximated by a finite discrete set of scenarios. A two‐stage stochastic programming model is developed based on scenarios and solved by a deterministic equivalent large linear programming model. The model explicitly considers the objective to minimize the total cost of C/D wafers. A real‐world example is given to illustrate the practicality of a stochastic approach. The results are better in comparison with deterministic linear programming by using expectation instead of stochastic demands. The model improved the performance of control and dummy wafers management and the flexibility of determining the downgrading policy. Copyright © 2008 John Wiley & Sons, Ltd.  相似文献   

13.
Existing methods for information system (IS) project selection neglect an important aspect of information technology, namely the interdependencies that exist among various IS applications (projects). Recognizing and modeling these project interdependencies provides valuable cost savings and greater benefits to organizations. In this paper, an IS project selection model is developed that identifies and models benefit, resource and technical interdependencies among candidate projects. The proposed model is formulated as a nonlinear 0–1 programming problem and represents a significant addition to existing IS, capital budgeting and R&D project selection models. The model is converted, using linearization techniques, and tested (validated) by applying it to real-world IS project selection data. By comparing the performance of this model with existing project selection models, the contribution of this model is highlighted.  相似文献   

14.
This paper reports a study made during 1966 within the Bristol Works of the British Aircraft Corporation, Guided Weapons Division into the evaluation and selection of company-funded R & D projects. After identifying the objectives and selection criteria used by the decision-makers involved in the selection process an attempt was made to establish the relative importance of and interactions between the various factors, with a view to deriving a model based on a project scoring system using a weighted sum of factor scores. However, analysis of the results obtained showed that each decision-maker had a different perception of the relevance and importance of the various factors to the objectives, so that insufficient data were obtained to achieve a fully representative model. It was shown that for such a model to usefully represent the real situation the interdependence of the selection criteria and objectives must be explicitly established.  相似文献   

15.
When exploring the potential payoffs from energy R & D, it is necessary to perform benefit-cost calculations over a wide range of future scenarios. Repeated runs of large-scale mathematical programming models are often required. This paper describes how simple statistical models might be used to eliminate at least some of the costly computer runs. The approach is illustrated in the context of a recent study on the effect of breeder timing on electricity generating costs.  相似文献   

16.
Numerous multiobjective linear programming (MOLP) methods have been proposed in the last two decades, but almost all for contexts where the parameters of problems are deterministic. However, in many real situations, parameters of a stochastic nature arise. In this paper, we suppose that the decision-maker is confronted with a situation of partial uncertainty where he possesses incomplete information about the stochastic parameters of the problem, this information allowing him to specify only the limits of variation of these parameters and eventually their central values. For such situations, we propose a multiobjective stochastic linear programming methodology; it implies the transformation of the stochastic objective functions and constraints in order to obtain an equivalent deterministic MOLP problem and the solving of this last problem by an interactive approach derived from the STEM method. Our methodology is illustrated by a didactical example.  相似文献   

17.
In this paper, we apply newly developed methods called GAM & CQP and CMARS for country defaults. These are techniques refined by us using Conic Quadratic Programming. Moreover, we compare these new methods with common and regularly used classification tools, applied on 33 emerging markets’ data in the period of 1980-2005. We conclude that GAM & CQP and CMARS provide an efficient alternative in predictions. The aim of this study is to develop a model for predicting the countries’ default possibilities with the help of modern techniques of continuous optimization, especially conic quadratic programming. We want to show that the continuous optimization techniques used in data mining are also very successful in financial theory and application. By this paper we contribute to further benefits from model-based methods of applied mathematics in the financial sector. Herewith, we aim to help build up our nations.  相似文献   

18.
This paper investigates the R&D project selection problem within government departments. The Department of National Defence is taken as a case in point. The multidimensional character of the problem is detailed, and existing methods for priority allocation are briefly surveyed. Two basic models for selecting projects are described. One of these, the ordinal intersection method, was found to be the most appropriate for the actual problem settings investigated. An illustrative example is given, and concluding remarks are made.  相似文献   

19.
For many decades linear programming has been used to find minimum cost diets, notably in the chicken and pig meat industries. More recently, animal growth models together with nonlinear optimisation methods have been used to find feeding schedules which simultaneously minimise feed costs and maximise market return, so maximising gross margin. Genetic algorithms can handle these problems, albeit slowly. In this paper we study the particular nature of the objective function (for pig meat production) and develop a global optimisation algorithm tailored to its discontinuous structure. We also demonstrate the use of stochastic programming to cope with changing feed costs and changing price at slaughter.  相似文献   

20.
Stochastic programming is the subfield of mathematical programming that considers optimization in the presence of uncertainty. During the last four decades a vast quantity of literature on the subject has appeared. Developments in the theory of computational complexity allow us to establish the theoretical complexity of a variety of stochastic programming problems studied in this literature. Under the assumption that the stochastic parameters are independently distributed, we show that two-stage stochastic programming problems are ♯P-hard. Under the same assumption we show that certain multi-stage stochastic programming problems are PSPACE-hard. The problems we consider are non-standard in that distributions of stochastic parameters in later stages depend on decisions made in earlier stages. Supported by the EPSRC grant ``Phase Transitions in the Complexity of Randomised Algorithms', by the EC IST project RAND-APX, and by the MRT Network ADONET of the European Community (MRTN-CT-2003-504438).  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号