首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 644 毫秒
1.
This paper presents an optimal scheduling algorithm for minimizing set-up costs in the parallel processing shop while meeting workload balancing restrictions.There are M independent batch type jobs which have sequence dependent set-up costs and N parallel processing machines. Each of the M jobs must be processed on exactly one of the N available machines. It is desirable to minimize total changeover costs with the restriction that each machine workload assignment T n be within P units of the average machine assignment. The paper describes a static problem in which all jobs are available at time zero. The sequence dependent change over costs are identical for each machine. An extension of the algorithm handles nonidentical processor problems.A combinatorial programming approach to the problem is used. For the special case of identical processors, the problem can be treated as a multi-salesman travelling salesman problem. A general branch and bound algorithm and numerical results are given.  相似文献   

2.
We consider the problem of scheduling n jobs on m parallel machines with inclusive processing set restrictions. Each job has a given release date, and all jobs have equal processing times. The objective is to minimize the makespan of the schedule. Li and Li (2015) have developed an O(n2+mn log?n) time algorithm for this problem. In this note, we present a modified algorithm with an improved time complexity of O(min{m, log?n} ? n log?n).  相似文献   

3.
We consider a due-window assignment problem on identical parallel machines, where the jobs have equal processing times and job-dependent earliness-tardiness costs. We would like to determine a ‘due window’ during which the jobs can be completed at no cost and to obtain a job schedule in which the jobs are penalized if they finish before or after the due window. The objective is to minimize the total earliness and tardiness job penalty, plus the cost associated with the size of the due window. We present an algorithm that can solve this problem in O(n3) time, which is an improvement of the O(n4) solution procedure developed by Mosheiov and Sarig.  相似文献   

4.
A three-dimensional, time-minimizing (bottleneck) assignment problem consists of assigning n jobs to n workers to be performed on n machines under different forms of feasibility conditions so that the different functions of the individual times taken by a worker to finish a job on a given machine are minimized. The usual assumption made in such a problem is that all the jobs can be commenced simultaneously. In this paper, two specially structured precedence constraints on jobs are considered, which necessitate modifications in this assumption. Further, the main purpose here is to develop branch-and-bound-type algorithms for solving the corresponding problems and to illustrate them by a numerical example.  相似文献   

5.
The flowshop scheduling problems with n jobs processed on two or three machines, and with two jobs processed on k machines are addressed where jobs have random and bounded processing times. The probability distributions of random processing times are unknown, and only the lower and upper bounds of processing times are given before scheduling. In such cases, there may not exist a unique schedule that remains optimal for all feasible realizations of the processing times, and therefore, a set of schedules has to be considered which dominates all other schedules for the given criterion. We obtain sufficient conditions when transposition of two jobs minimizes total completion time for the cases of two and three machines. The geometrical approach is utilized for flowshop problem with two jobs and k machines.  相似文献   

6.
We study a problem of scheduling n jobs on a single machine in batches. A batch is a set of jobs processed contiguously and completed together when the processing of all jobs in the batch is finished. Processing of a batch requires a machine setup time dependent on the position of this batch in the batch sequence. Setup times and job processing times are continuously controllable, that is, they are real-valued variables within their lower and upper bounds. A deviation of a setup time or job processing time from its upper bound is called a compression. The problem is to find a job sequence, its partition into batches, and the values for setup times and job processing times such that (a) total job completion time is minimized, subject to an upper bound on total weighted setup time and job processing time compression, or (b) a linear combination of total job completion time, total setup time compression, and total job processing time compression is minimized. Properties of optimal solutions are established. If the lower and upper bounds on job processing times can be similarly ordered or the job sequence is fixed, then O(n3 log n) and O(n5) time algorithms are developed to solve cases (a) and (b), respectively. If all job processing times are fixed or all setup times are fixed, then more efficient algorithms can be devised to solve the problems.  相似文献   

7.
A proportionate flowshop is a special case of the classical flowshop, where the job processing times are machine-independent. We study the problem of minimizing the number of early jobs in this machine setting. This objective function has hardly been investigated on a single machine, and never on a flowshop. We introduce an efficient iterative solution algorithm. In each iteration, a single job is moved to the first position (and is added to the set of early jobs), and the remaining jobs are rescheduled such that the maximum earliness is minimized. The algorithm guarantees an optimal solution in O(n3) time, where n is the number of jobs.  相似文献   

8.
We consider the problem of scheduling a given set of n jobs with equal processing times on m parallel machines so as to minimize the makespan. Each job has a given release date and is compatible to only a subset of the machines. The machines are ordered and indexed in such a way that a higher-indexed machine can process all the jobs that a lower-indexed machine can process. We present a solution procedure to solve this problem in O(n2+mnlogn) time. We also extend our results to the tree-hierarchical processing sets case and the uniform machine case.  相似文献   

9.
This paper investigates the scheduling problem in a two-stage flexible flow shop, which consists of m stage-1 parallel dedicated machines and a stage-2 bottleneck machine, subject to the condition that n l jobs per type l∈{1, …, m} are processed in a fixed sequence. Four regular performance metrics, including the total completion time, the maximum lateness, the total tardiness, and the number of tardy jobs, are considered. For each considered objective function, we aim to determine an optimal interleaving processing sequence of all jobs coupled with their starting times on the stage-2 bottleneck machine. The problem under study is proved to be strongly NP-hard. An O(m2Πl=1 m n l 2) dynamic programming algorithm coupled with numerical experiments is presented.  相似文献   

10.
We consider the problem of scheduling n jobs on an unbounded batching machine that can process any number of jobs belonging to the same family simultaneously in the same batch. All jobs in the same batch complete at the same time. Jobs belonging to different families cannot be processed in the same batch, and setup times are required to switch between batches that process jobs from different families. For a fixed number of families m, we present a generic forward dynamic programming algorithm that solves the problem of minimizing an arbitrary regular cost function in pseudopolynomial time. We also present a polynomial-time backward dynamic programming algorithm with time complexity O (mn(n/m+1) m ) for minimizing any additive regular minsum objective function and any incremental regular minmax objective function. The effectiveness of our dynamic programming algorithm is shown by computational experiments based on the scheduling of the heat-treating process in a steel manufacturing plant.  相似文献   

11.
The classical NP-hard (in the ordinary sense) problem of scheduling jobs in order to minimize the total tardiness for a single machine 1‖ΣT j is considered. An NP-hard instance of the problem is completely analyzed. A procedure for partitioning the initial set of jobs into subsets is proposed. Algorithms are constructed for finding an optimal schedule depending on the number of subsets. The complexity of the algorithms is O(n 2Σp j ), where n is the number of jobs and p j is the processing time of the jth job (j = 1, 2, …, n).  相似文献   

12.
We extend a classical single-machine due-window assignment problem to the case of position-dependent processing times. In addition to the standard job scheduling decisions, one has to assign a time interval (due-window), such that jobs completed within this interval are assumed to be on time and not penalized. The cost components are: total earliness, total tardiness and due-window location and size. We introduce an O(n3) solution algorithm, where n is the number of jobs. We also investigate several special cases, and examine numerically the sensitivity of the solution (schedule and due-window) to the different cost parameters.  相似文献   

13.
We consider a single machine static and deterministic scheduling problem in which jobs have a common due window. Jobs completed within the window incur no penalties, other jobs incur either earliness or tardiness penalties. The objective is to find the optimal size and location of the window as well as an optimal sequence to minimise a cost function based on earliness, tardiness, window size, and window location. We propose an O(n log n) algorithm to solve the problem.  相似文献   

14.
We consider a problem of scheduling n independent jobs on m unrelated parallel machines with the objective of minimizing total tardiness. Processing times of a job on different machines may be different on unrelated parallel-machine scheduling problems. We develop several dominance properties and lower bounds for the problem, and suggest a branch and bound algorithm using them. Results of computational experiments show that the suggested algorithm gives optimal solutions for problems with up to five machines and 20 jobs in a reasonable amount of CPU time.  相似文献   

15.
This paper considers the problem of sequencing n jobs in a three-machine shop with the objective of minimising the maximum completion time. The shop consists of three machines, M1,M2 and M_{3}. A job is first processed on M1 and then is assigned either the route (M2,M_{3}) or the route (M_{3},M2). Thus, for our model the processing route is given by a partial order of machines, as opposed to the linear order of machines for a job shop, or to an arbitrary sequence of machines for an open shop. The main result is on O(nlog n) time heuristic, which generates a schedule with the makespan that is at most 5/3 times the optimum value.  相似文献   

16.
We study the optimality of the very practical policy of equal allocation of jobs to batches in batch scheduling problems on an m-machine open shop. The objective is minimum makespan. We assume unit processing time jobs, machine-dependent setup times and batch availability. We show that equal allocation is optimal for a two-machine and a three-machine open shop. Although, this policy is not necessarily optimal for larger size open shops, it is shown numerically to produce very close-to-optimal schedules.  相似文献   

17.
We consider a scheduling problem where a set of n jobs has to be processed on a set of m machines and arbitrary precedence constraints between operations are given. Moreover, for any two operations i and j values a ij >0 and a ji >0 may be given where a ij is the minimal difference between the starting times of operations i and j when operation i is processed first. Often, the objective is to minimize the makespan but we consider also arbitrary regular criteria. Even the special cases of the classical job shop problem J//Cmax belong to the set of NP-hard problems. Therefore, approximation or heuristic algorithms are necessary to handle large-dimension problems. Based on the mixed graph model we give a heuristic decomposition algorithm for such a problem, i.e. the initial problem is partitioned into subproblems that can be solved exactly or approximately with a small error bound. These subproblems are obtained by a relaxation of a subset of the set of undirected edges of the mixed graph. The subproblems are successively solved and a proportion of the results obtained for one subproblem is kept for further subproblem definitions. Numerical results of the algorithm presented here are given.  相似文献   

18.
By exploiting the relationship between scheduling and sorting, this paper describes a functional heuristic algorithm for seeking a quick and approximate solution to the n-job, M-machine flowshop scheduling problem under the assumption that all jobs are processed on all machines in the same order and no passing of jobs is permitted. The proposed functional heuristic algorithm can be executed by hand for reasonably large size problems and yields solutions which are closer to optimal solutions than those obtained by Palmer's slope index algorithm.  相似文献   

19.
The subject matter of this paper is an integral with exponential oscillation of phase f(x) weighted by g(x) on a finite interval [α β]: When the phase f(x) has a single stationary point in (α β), an nth-order asymptotic expansion of this integral is proved for n ≥ 2: This asymptotic expansion sharpens the classical result for n = 1 by M. N. Huxley. A similar asymptotic expansion was proved by V. Blomer, R. Khan and M. Young under the assumptions that f(x) and g(x) are smooth and g(x) is compactly supported on R: In the present paper, however, these functions are only assumed to be continuously differentiable on [α β] 2n + 3 and 2n + 1 times, respectively. Because there are no requirements on the vanishing of g(x) and its derivatives at the endpoints α and β, the present asymptotic expansion contains explicit boundary terms in the main and error terms. The asymptotic expansion in this paper is thus applicable to a wider class of problems in analysis, analytic number theory, and other fields.  相似文献   

20.
This paper discusses a two-stage assembly-type flowshop scheduling problem with batching considerations subject to a fixed job sequence. The two-stage assembly flowshop consists of m stage-1 parallel dedicated machines and a stage-2 assembly machine which processes the jobs in batches. Four regular performance metrics, namely, the total completion time, maximum lateness, total tardiness, and number of tardy jobs, are considered. The goal is to obtain an optimal batching decision for the predetermined job sequence at stage 2. This study presents a two-phase algorithm, which is developed by coupling a problem-transformation procedure with a dynamic program. The running time of the proposed algorithm is O(mn+n5), where n is the number of jobs.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号