首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
This paper develops a branch and bound algorithm for the two-stage assembly scheduling problem. In this problem, there are m machines at the first stage, each of which produces a component of a job. When all m components are available, a single assembly machine at the second stage completes the job. The objective is to schedule the jobs on the machines so that the maximum completion time, or makespan, is minimized. A lower bound based on solving an artificial two-machine flow shop problem is derived. Also, several dominance theorems are established and incorporated into the branch and bound algorithm. Computational experience with the algorithm is reported for problems with up to 8000 jobs and 10 first-stage machines.  相似文献   

2.
The simple assembly line balancing problem (SALBP) is a well-studied NP-complete problem for which a new problem database of generated instances was published in 2013. This paper describes the application of a branch, bound, and remember (BB&R) algorithm using the cyclic best-first search strategy to this new database to produce provably exact solutions for 86% of the unsolved problems in this database. A new backtracking rule to save memory is employed to allow the BB&R algorithm to solve many of the largest problems in the database.  相似文献   

3.
A branch and bound algorithm for the acyclic subgraph problem (feedback are set problem) is described. The branching scheme lexicographically enumerates all permutations, skipping initial segments known by some easy tests not to have any optimal completion. A lower bound for the number of feedback arcs is given by the size of any collection of disjoint cycles. We propose a heuristic algorithm to find a large collection. The size of the problems our branch and bound algorithm can solve varies from 25 to 34 nodes, depending on the nature of the problem.  相似文献   

4.
We present a branch and bound algorithm for the maximum clique problem in arbitrary graphs. The main part of the algorithm consists in the determination of upper bounds by graph colorings. Using a modification of a known graph coloring method called DSATUR we simultaneously derive lower and upper bounds for the clique number.
Zusammenfassung Wir stellen einen Branch and Bound Algorithmus für das Maximum Clique Problem in einem beliebigen Graphen vor. Das Hauptaugenmerk richtet sich dabei auf die Bestimmung oberer Schranken mit Hilfe von Färbungen von Graphen. Es wird eine Modifikation einer bekannten Färbungsmethode, genannt DSATUR, verwendet, mit der sich gleichzeitig obere und untere Schranken für die Cliquezahl erstellen lassen.
  相似文献   

5.
This article begins with a review of previously proposed integer formulations for the maximum diversity problem (MDP). This problem consists of selecting a subset of elements from a larger set in such a way that the sum of the distances between the chosen elements is maximized. We propose a branch and bound algorithm and develop several upper bounds on the objective function values of partial solutions to the MDP. Empirical results with a collection of previously reported instances indicate that the proposed algorithm is able to solve all the medium-sized instances (with 50 elements) as well as some large-sized instances (with 100 elements). We compare our method with the best previous linear integer formulation solved with the well-known software Cplex. The comparison favors the proposed procedure.  相似文献   

6.
A branch and bound algorithm for the generalized assignment problem   总被引:5,自引:0,他引:5  
This paper describes what is termed the generalized assignment problem. It is a generalization of the ordinary assignment problem of linear programming in which multiple assignments of tasks to agents are limited by some resource available to the agents. A branch and bound algorithm is developed that solves the generalized assignment problem by solving a series of binary knapsack problems to determine the bounds. Computational results are cited for problems with up to 4 000 0–1 variables, and comparisons are made with other algorithms.This research was partly supported by ONR Contracts N00014-67-A-0126-0008 and N00014-67-A-0126-0009 with the Center for Cybernetic Studies, The University of Texas.  相似文献   

7.
The multiple-choice knapsack problem is a binary knapsack problem with the addition of disjoint multiple-choice constraints. We describe a branch and bound algorithm based on embedding Glover and Klingman's method for the associated linear program within a depth-first search procedure. A heuristic is used to find a starting dual feasible solution to the associated linear program and a ‘pegging’ test is employed to reduce the size of the problem for the enumeration phase. Computational experience and comparisons with the code of Nauss and an algorithm of Armstrong et al. for the same problem are reported.  相似文献   

8.
Cell formation (CF) is the first and the most important problem in designing cellular manufacturing systems. Due to its non-polynomial nature, various heuristic and metaheuristic algorithms have been proposed to solve CF problem. Despite the popularity of heuristic algorithms, few studies have attempted to develop exact algorithms, such as branch and bound (B&B) algorithms, for this problem. We develop three types of branch and bound algorithms to deal with the cell formation problem. The first algorithm uses a binary branching scheme based on the definitions provided for the decision variables. Unlike the first algorithm, which relies on the mathematical model, the second one is designed based on the structure of the cell formation problem. The last algorithm has a similar structure to the second one, except that it has the ability to eliminate duplicated nodes in branching trees. The proposed branch and bound algorithms and a hybrid genetic algorithm are compared through some numerical examples. The results demonstrate the effectiveness of the modified problem-oriented branch and bound algorithm in solving relatively large size cell formation problems.  相似文献   

9.
A hybrid flow shop scheduling problem (HFSP) with assembly operations is studied in this paper. In the considered problem, a number of products of the same kind are produced. Each product is assembled using a set of several parts. At first, the parts are produced in a hybrid flow shop and then they are assembled in an assembly stage to produce products. The considered objective is to minimize the completion time of all products (makespan). This problem has been proved strongly NP-hard, so in order to solve it, a hierarchical branch and bound algorithm is presented. Also, some lower and upper bounds are developed to increase the efficiency of the proposed algorithm. The numerical experiments are used to evaluate the performance of the proposed algorithm.  相似文献   

10.
In this article, we present and validate a simplicial branch and bound duality-bounds algorithm for globally solving the linear sum-of-ratios fractional program. The algorithm computes the lower bounds called for during the branch and bound search by solving ordinary linear programming problems. These problems are derived by using Lagrangian duality theory. The algorithm applies to a wide class of linear sum-of-ratios fractional programs. Two sample problems are solved, and the potential practical and computational advantages of the algorithm are indicated.  相似文献   

11.
This paper considers a production planning problem in disassembly systems, which is the problem of determining the quantity and timing of disassembling end-of-use/life products in order to satisfy the demand of their parts or components over a planning horizon. The case of single product type without parts commonality is considered for the objective of minimizing the sum of setup and inventory holding costs. To show the complexity of the problem, we prove that the problem is NP-hard. Then, after deriving the properties of optimal solutions, a branch and bound algorithm is suggested that incorporates the Lagrangean relaxation-based upper and lower bounds. Computational experiments are performed on a number of randomly generated problems and the test results indicate that the branch and bound algorithm can give optimal solutions up to moderate-sized problems in a reasonable computation time. A Lagrangean heuristic for a viable alternative for large-sized problems is also suggested and compared with the existing heuristics to show its effectiveness.  相似文献   

12.
A new way of computing the upper bound for the zero-one knapsack problem is presented, substantially improving on Dantzig's approach. A branch and bound algorithm is proposed, based on the above mentioned upper bound and on original backtracking and forward schemes. Extensive computational experiences indicate this new algorithm to be superior to the fastest algorithms known at present.  相似文献   

13.
The robust spanning tree problem is a variation, motivated by telecommunications applications, of the classic minimum spanning tree problem. In the robust spanning tree problem edge costs lie in an interval instead of having a fixed value.Interval numbers model uncertainty about the exact cost values. A robust spanning tree is a spanning tree whose total cost minimizes the maximum deviation from the optimal spanning tree over all realizations of the edge costs. This robustness concept is formalized in mathematical terms and is used to drive optimization.In this paper a branch and bound algorithm for the robust spanning tree problem is proposed. The method embeds the extension of some results previously presented in the literature and some new elements, such as a new lower bound and some new reduction rules, all based on the exploitation of some peculiarities of the branching strategy adopted.Computational results obtained by the algorithm are presented. The technique we propose is up to 210 faster than methods recently appeared in the literature.  相似文献   

14.
Many real problems can be modelled as robust shortest path problems on interval digraphs, where intervals represent uncertainty about real costs and a robust path is not too far from the shortest path for each possible configuration of the arc costs.A branch and bound algorithm for this problem is presented.  相似文献   

15.
In 1970 Held and Karp introduced the Lagrangean approach to the symmetric traveling salesman problem. We use this 1-tree relaxation in a new branch and bound algorithm. It differs from other algorithms not only in the branching scheme, but also in the ascent method to calculate the 1-tree bounds. urthermore we determine heuristic solutions throughout the computations to provide upperbounds. We present computational results for both a depth-first and a breadth-first version of our algorithm. On the average our results on a number of Euclidean problems from the literature are obtained in about 60% less 1-trees than the best known algorithm based on the 1-tree relaxation. For random table problems (up to 100 cities) the average results are also satisfactory.  相似文献   

16.
We present an implicit-enumeration algorithm for the simple assembly line balancing problem, with the objective of minimizing the number of stations along the line for a fixed cycle time. The algorithm traverses two branch-and-bound trees, one assigning tasks that appear earlier in the precedence network at lower levels of the tree, the other assigning later tasks at lower levels. The two processes alternately expand nodes of their respective trees, and share information about each other's progress in the form of global bounds. Computational results are reported on several well-known problems from the literature.  相似文献   

17.
《Optimization》2012,61(5):711-721
Known duality statements are used to find tight bounds for the branch and bound process in solving Boolean quadratic optimization problems. To solve the corresponding continuous partial problem, a NEWTON-like procedure is indicated. Superlinear convergence, however, is only obtained in partial cases.  相似文献   

18.
We consider the one-machine scheduling problem with minimum and maximum time lags while minimizing the makespan. This problem typically arises in a manufacturing environment where the next job has to be carried out within a specific time range after the completion of the immediately preceding job. We describe a branch and bound algorithm, based on the input and output of a clique and the relevant propositions, for finding the optimal waiting times. The computational experiments give promising results, showing whether a given instance is feasible or infeasible. With the proposed branch and bound algorithm we can either find an optimal schedule or establish the infeasibility within an acceptable run time.  相似文献   

19.
A BRANCH BOUND METHOD FOR SUBSET SUM PROBLEM   总被引:1,自引:0,他引:1  
ABRANCHBOUNDMETHODFORSUBSETSUMPROBLEMWUSHIQUAN(吴士泉)(InstituteofAppliedMathematics,theChineseAcademyofSciences,Beijing100080,C...  相似文献   

20.
In this article, we first review previous exact approaches as well as theoretical contributions for the problem of reducing the bandwidth of a matrix. This problem consists of finding a permutation of the rows and columns of a given matrix which keeps the non-zero elements in a band that is as close as possible to the main diagonal. This NP-complete problem can also be formulated as a labeling of vertices on a graph, where edges are the non-zero elements of the corresponding symmetrical matrix. We propose a new branch and bound algorithm and new expressions for known lower bounds for this problem. Empirical results with a collection of previously reported instances indicate that the proposed algorithm compares favourably to previous methods.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号