首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
A Constraint-Based Method for Project Scheduling with Time Windows   总被引:5,自引:0,他引:5  
This paper presents a heuristic algorithm for solving RCPSP/max, the resource constrained project scheduling problem with generalized precedence relations. The algorithm relies, at its core, on a constraint satisfaction problem solving (CSP) search procedure, which generates a consistent set of activity start times by incrementally removing resource conflicts from an otherwise temporally feasible solution. Key to the effectiveness of the CSP search procedure is its heuristic strategy for conflict selection. A conflict sampling method biased toward selection of minimal conflict sets that involve activities with higher-capacity requests is introduced, and coupled with a non-deterministic choice heuristic to guide the base conflict resolution process. This CSP search is then embedded within a larger iterative-sampling search framework to broaden search space coverage and promote solution optimization. The efficacy of the overall heuristic algorithm is demonstrated empirically on a large set of previously studied RCPSP/max benchmark problems.  相似文献   

2.
We describe a time-oriented branch-and-bound algorithm for the resource-constrained project scheduling problem which explores the set of active schedules by enumerating possible activity start times. The algorithm uses constraint-propagation techniques that exploit the temporal and resource constraints of the problem in order to reduce the search space. Computational experiments with large, systematically generated benchmark test sets, ranging in size from thirty to one hundred and twenty activities per problem instance, show that the algorithm scales well and is competitive with other exact solution approaches. The computational results show that the most difficult problems occur when scarce resource supply and the structure of the resource demand cause a problem to be highly disjunctive.  相似文献   

3.
We consider a non-preemptive, zero time lag multi-project scheduling problem with multiple modes and limited renewable and nonrenewable resources. A two-stage decomposition approach is adopted to formulate the problem as a hierarchy of 0-1 mathematical programming models. In stage one; each project is reduced to a macro-activity with macro-modes. The macro-activities are combined into a single macro-activity network over which the macro-activity scheduling problem (MP) is defined, where the objective is the maximization of the net present value with positive cash flows and the renewable resource requirements are time-dependent. An exact solution procedure and a genetic algorithm (GA) approach are proposed for solving the MP. A GA is also employed to generate an initial solution for the exact solution procedure. The first stage terminates with a post-processing procedure to distribute the remaining resource capacities. Using the start times and the resource profiles obtained in stage one, each project is scheduled in stage two for minimum makespan. Three new test problem sets are generated with 81, 84 and 27 problems each, and three different configurations of solution procedures are tested.  相似文献   

4.
We study scheduling problems with multiple modes and dedicated resources arising in production and project management, which constitute a special class of the general multimode resource-constrained project scheduling problem. A task may require simultaneously a set of discrete, renewable resources to be processed and the processing can be performed in different modes, that is with different resource sets, processing times, or costs. Precedence constraints can exist among tasks. The total budget that can be allocated to the project can be limited. The problem consists of identifying a mode for each task and a starting time for its processing respecting precedence, resource, and budget constraints. A graph model and an iterative solution scheme are presented. Specific heuristic algorithms for the cases with and without budget constraints are given and computational results are discussed.  相似文献   

5.
研究工件加工时间具有恶化效应和凸资源关系的单机排序问题,其中工件的实际加工时间是其正常的加工时间,工件开工时间(具有恶化效应)及消耗资源量的函数。目标为在最大完工时间(总完工时间、总等待时间、完工时间总绝对差与等待时间总绝对差)小于或等于给定常数的条件下找到工件的最优排序和最优的资源分配使工件的总资源消耗量最少。在单机状态下,证明了此问题是多项式时间可解的,并给出了求解该问题的算法和数值实例。  相似文献   

6.
针对基于多代理系统求解分布式多项目调度问题的不足, 开发了一种适应性的遗传算法ccm_GA。ccm_GA的独特性体现为两点:第一, 修正的串行调度过程分两个阶段分别消除全局资源和本地资源冲突; 第二, 在满足两类资源约束的调度方案中, 识别出关键链并改变关键活动在活动序列编码中的位置以增加解的多样性从而提高搜索效率。设计并实施大规模数值实验测试算法性能, 与现有文献中的六种算法作对比, 结果表明:ccm_GA在50%的算例集上获得的测试指标都好于六种算法, 且对于资源约束越紧的算例集, ccm_GA的求解效果越好。  相似文献   

7.
This paper describes a problem faced by CS Energy's Swanbank Power Station in the Australian state of Queensland. It involved the personnel scheduling (rostering) of staff with multiple skill levels at the power station. Such a problem can be classified using the six stage construction process proposed by Ernst et al. We assume that the three processes of ‘demand modelling,’ ‘shift starting times’ and ‘task scheduling’ are specified. We are concerned with the essential processes of ‘day off scheduling,’ ‘line of work construction’ and ‘shift assignment to staff’ with requirements to maintain multiple skills. Several other authors have reported results for staff with hierarchical skills while the methods proposed in this paper are for non-hierarchical skill sets. The paper describes a set covering approach to the multi-skilled rostering problem. We propose a number of solution strategies for the set covering approach and give a comparison of the results.  相似文献   

8.
王君 《运筹与管理》2017,26(8):187-192
考虑多机器生产环境下,研究在加工空档期允许关闭机器的可持续调度问题。同时对工件的指派、工件的开始加工时刻和机器在空档期是否开关机进行决策,以最小化碳排放为目标建立数学规划模型。设计了禁忌搜索混合算法求解模型,首先通过一个企业案例验证了模型和算法的有效性,然后通过仿真算例分析了算法的效率。计算结果表明,可持续调度方式在机器调度层面为企业减少了大量的碳排放。  相似文献   

9.
Scheduling project networks with resource constraints and time windows   总被引:10,自引:0,他引:10  
Project networks with time windows are generalizations of the well-known CPM and MPM networks that allow for the introduction of arbitrary minimal and maximal time lags between the starting and completion times of any pair of activities.We consider the problem to schedule such networks subject to arbitrary (even time dependent) resource constraints in order to minimize an arbitrary regular performance measure (i.e. a non-decreasing function of the vector of completion times). This problem arises in many standard industrial construction or production processes and is therefore particularly suited as a background model in general purpose decision support systems.The treatment is done by a structural approach that involves a generalization of both the disjunctive graph method in job shop scheduling [1] and the order theoretic methods for precedence constrained scheduling [18,23,24]. Besides theoretical insights into the problem structure, this approach also leads to rather powerful branch-and-bound algorithms. Computational experience with this algorithm is reported.  相似文献   

10.
This paper presents a priority rule-based heuristic for the multi-mode resource-constrained project scheduling problem with the splitting of activities around unavailable resources allowed. All resources considered are renewable and each resource unit may not be available at all times due to resource vacations, which are known in advance. A new concept called moving resource strength is developed to help identify project situations where activity splitting is likely to be beneficial during scheduling. The moving resource strength concept is implemented in priority rule-based heuristics to control activity splitting when scheduling. Multiple comparisons of the performance of combination of activity–mode priority rules used in the heuristics are provided. Computational experiments demonstrate the effectiveness of the heuristic in reducing project makespan, and minimizing activity splitting.  相似文献   

11.
The resource-constrained project scheduling problem involves the determination of a schedule of the project activities, satisfying the precedence and resource constraints while minimizing the project duration. In practice, activity durations may be subject to variability. We propose a stochastic methodology for the determination of a project execution policy and a vector of predictive activity starting times with the objective of minimizing a cost function that consists of the weighted expected activity starting time deviations and the penalties or bonuses associated with late or early project completion. In a computational experiment, we show that our procedure greatly outperforms existing algorithms described in the literature.  相似文献   

12.
针对具有工艺路径柔性的车间调度问题,提出基于OR子图和子路径的工艺路径柔性描述方法,该描述方法形式简单且允许OR子图多层嵌套。以此为基础,设计了基于遗传算法的工艺路径柔性调度算法,并采用以工艺路径编码、机器编码和工件调度编码为基础的三维染色体编码策略,其中,工艺路径编码和机器编码分别通过最大子路径数量和最大机器数量随机产生,其优势在于任意染色体均表示可行解,并可以使用简单的交叉算子和变异算子实现遗传操作且其后代亦为可行解。最后通过实验证明了算法的优化能力。  相似文献   

13.
考虑带有退化效应和序列相关运输时间的单机排序问题. 工件的加工时间是其开工时间的简单线性增加函数. 当机器单个加工工件时, 极小化最大完工时间、(加权)总完工时间和总延迟问题被证明是多项式可解的, EDD序对于极小化最大延迟问题不是最优排序, 另外, 就交货期和退化率一致情形给出了一最优算法. 当机器可分批加工工件时, 分别就极小化最大完工时间和加权总完工时间问题提出了多项式时间最优算法.  相似文献   

14.
We consider the problem of scheduling multiple projects subject to joint resource constraints. Most approaches proposed in the literature so far are based on the unrealistic assumption that resources can be transferred from one project to the other without any expense in time or cost. In order to contribute to closing this gap to reality, we generalise the multi-project scheduling problem by additionally including sequence- and resource-dependent transfer times, which represent setup activities necessary when a resource is removed from one project and reassigned to another (or from one job to another within the same project). In this paper, we define the modified resource constrained multi-project scheduling problem with transfer times (called RCMPSPTT), which aims at minimising the multi-project duration for the single-project approach or the mean project duration for the multi-project approach. We formulate both perspectives as an integer linear program, propose priority rule based solution procedures and present results of comprehensive computational experiments. Provided that the combination of scheduling scheme and priority rules is chosen appropriately, the procedures obtain good results. In particular, resource oriented priority rules are identified to be successful.  相似文献   

15.
In this paper we propose a heuristic for solving the problem of resource constrained preemptive scheduling in the two-stage flowshop with one machine at the first stage and parallel unrelated machines at the second stage, where renewable resources are shared among the stages, so some quantities of the same resource can be used at different stages at the same time. Availability of every resource at any moment is limited and resource requirements of jobs are arbitrary. The objective is minimization of makespan. The problem is NP-hard. The heuristic first sequences jobs on the machine at stage 1 and then solves the preemptive scheduling problem at stage 2. Priority rules which depend on processing times and resource requirements of jobs are proposed for sequencing jobs at stage 1. A column generation algorithm which involves linear programming, a tabu search algorithm and a greedy procedure is proposed to minimize the makespan at stage 2. A lower bound on the optimal makespan in which sharing of the resources between the stages is taken into account is also derived. The performance of the heuristic evaluated experimentally by comparing the solutions to the lower bound is satisfactory.  相似文献   

16.
Ship maintenance scheduling is a process to decide start times of maintenance activities that satisfy all precedence and resource constraints and optimize the ship availability. In this paper, ship maintenance scheduling is modelled as a constraint satisfaction problem (CSP). The variables of CSP are the start times and its domain values are the start and horizon of the schedule. To solve the ship maintenance scheduling problem in the Royal Malaysian Navy, we have adopted a constraint-based reasoning (CBR) which requires start times of the first activities of maintenance cycles to solve the problem by the CBR. Thus, we adopt a genetic algorithm (GA) to find the start times of the first activities. The simulation results showed the effectiveness of the present hybrid algorithm.  相似文献   

17.
In this paper, we investigate the production order scheduling problem derived from the production of steel sheets in Shanghai Baoshan Iron and Steel Complex (Baosteel). A deterministic mixed integer programming (MIP) model for scheduling production orders on some critical and bottleneck operations in Baosteel is presented in which practical technological constraints have been considered. The objective is to determine the starting and ending times of production orders on corresponding operations under capacity constraints for minimizing the sum of weighted completion times of all orders. Due to large numbers of variables and constraints in the model, a decomposition solution methodology based on a synergistic combination of Lagrangian relaxation, linear programming and heuristics is developed. Unlike the commonly used method of relaxing capacity constraints, this methodology alternatively relaxes constraints coupling integer variables with continuous variables which are introduced to the objective function by Lagrangian multipliers. The Lagrangian relaxed problem can be decomposed into two sub-problems by separating continuous variables from integer ones. The sub-problem that relates to continuous variables is a linear programming problem which can be solved using standard software package OSL, while the other sub-problem is an integer programming problem which can be solved optimally by further decomposition. The subgradient optimization method is used to update Lagrangian multipliers. A production order scheduling simulation system for Baosteel is developed by embedding the above Lagrangian heuristics. Computational results for problems with up to 100 orders show that the proposed Lagrangian relaxation method is stable and can find good solutions within a reasonable time.  相似文献   

18.
姜昆 《运筹与管理》2020,29(7):105-109
研究带凸资源和恶化效应的单机窗口指派排序问题,其中窗口指的是松弛窗口,凸资源和恶化效应指的是工件的实际加工时间是其开始加工时间的线性函数,是其资源消耗量的凸函数。目标是确定工件的加工顺序,资源分配量以及窗口的开始加工时间和长度使其在总资源消耗费用(与窗口有关的排序费用)有上界限制的条件下,极小化与窗口有关的排序费用(总资源消耗费用)。获得了求解上述问题的最优算法,证明了该问题是多项式时间可解的。  相似文献   

19.
合理的资源配置是提高项目调度鲁棒性一种有效的方法。本文针对项目鲁棒调度问题,提出了Max-PRUA资源分配启发式算法,以期通过生成鲁棒性高的资源分配方案来提高调度计划的鲁棒性。本算法设计了最大化利用优先关系和不可避免弧传递资源的资源分配两项策略来传递最大资源量,以减少由额外约束传递的资源量,降低对项目调度鲁棒性的影响。为寻优最优资源分配方案,配合局部搜索算法,本算法构建了动态活动组GRA,通过对组内活动顺序重排以生成多种资源分配方案,以利于从解空间中寻优出最佳的鲁棒性方案。最后通过大量的仿真实验验证和与其它算法进行比较,结果表明本算法对于不同规模和不同因素影响的项目均有较好的适应性,生成的资源分配方案对调度计划鲁棒性影响较小,是一种有效的算法。  相似文献   

20.
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号