首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
井彩霞  张磊  刘烨 《运筹与管理》2014,23(4):133-138
考虑需要安装时间的平行多功能机排序问题。在该模型中,每个工件对应机器集合的一个子集,其只能在这个子集中的任一台机器上加工,称这个子集为该工件的加工集合;工件分组,同组工件具有相同的加工时间和加工集合,不同组中的工件在同一台机器上连续加工需要安装时间,目标函数为极小化最大完工时间。对该问题NP-难的一般情况设计启发式算法:首先按照特定的规则将所有工件组都整组地安排到各台机器上,然后通过在各机器间转移工件不断改进当前最大完工时间。通过与下界的比较检验算法的性能,大量的计算实验表明,算法是实用而有效的。  相似文献   

2.
We consider the single machine scheduling problem with resource dependent release times and processing times, in which both the release times and processing times are strictly linear decreasing functions of the amount of resources consumed. The objective is to minimize the makespan plus the total resource consumption costs. We propose a heuristic algorithm for the general problem by utilizing some derived optimal properties and analyze its performance bound. For some special cases, we propose another heuristic algorithm that achieves a tighter performance bound.  相似文献   

3.
研究一类新型的平行机排序问题, 即在机器和工人都是必需的加工资源并且都有加工资质约束的情况下, 如何在一组平行机上进行工件排序(或称调度)以最小化时间表长C_max. 将研究工件加工时间均为单位时间的情况, 通过建立网络流模型以及采用二分搜索技术, 可以在多项式时间内精确地求解上述问题, 算法复杂度为O(n^{3}logn). 同时提供了一种基于双重动态柔性选择\,(DDFS)\,策略的启发式算法,可以获得较好的排序效果, 算法复杂度为O(n^{2}).  相似文献   

4.
We consider some problems of scheduling jobs on identical parallel machines where job-processing times are controllable through the allocation of a nonrenewable common limited resource. The objective is to assign the jobs to the machines, to sequence the jobs on each machine and to allocate the resource so that the makespan or the sum of completion times is minimized. The optimization is done for both preemptive and nonpreemptive jobs. For the makespan problem with nonpreemptive jobs we apply the equivalent load method in order to allocate the resources, and thereby reduce the problem to a combinatorial one. The reduced problem is shown to be NP-hard. If preemptive jobs are allowed, the makespan problem is shown to be solvable in O(n2) time. Some special cases of this problem with precedence constraints are presented and the problem of minimizing the sum of completion times is shown to be solvable in O(n log n) time.  相似文献   

5.
This paper considers two uniform parallel machine scheduling problems with fixed machine cost under the background of cloud manufacturing. The goal is to minimize the makespan with a given budget of total cost, \(\hat{U}\). All the jobs are homogeneous, i.e., the processing times of the jobs are identical. Non-preemptive and preemptive problems are studied. For the non-preemptive problem, we give a \(2[1+1{/}(h-1)]\)-approximation algorithm, where h is the number of the machine which can not be selected the first time. For the preemptive problem, we give an algorithm whose worst-case bound equals to \(1+1{/}(h-1)\). Preliminary experimental results indicate that the proposed algorithms are reasonably accurate compared with the lower bounds.  相似文献   

6.
This paper focuses on a two-machine re-entrant flowshop scheduling problem with the objective of minimizing makespan. In the re-entrant flowshop considered here, all jobs must be processed twice on each machine, that is, each job should be processed on machine 1, machine 2 and then machine 1 and machine 2. We develop dominance properties, lower bounds and heuristic algorithms for the problem, and use these to develop a branch and bound algorithm. For evaluation of the performance of the algorithms, computational experiments are performed on randomly generated test problems. Results of the experiments show that the suggested branch and bound algorithm can solve problems with up to 200 jobs in a reasonable amount of CPU time.  相似文献   

7.
We treat a problem of scheduling n jobs on a three stages hybrid flowshop of particular structure (one machine in the first and third stages and two dedicated machines in stage two). The objective is to minimize the makespan. This problem is NP-complete. We propose two heuristic procedures to cope with realistic problems. Extensive experimentation with various problem sizes are conducted and the computational results show excellent performance of the proposed heuristics.  相似文献   

8.
This paper develops a branch and bound algorithm for the two-stage assembly scheduling problem. In this problem, there are m machines at the first stage, each of which produces a component of a job. When all m components are available, a single assembly machine at the second stage completes the job. The objective is to schedule the jobs on the machines so that the maximum completion time, or makespan, is minimized. A lower bound based on solving an artificial two-machine flow shop problem is derived. Also, several dominance theorems are established and incorporated into the branch and bound algorithm. Computational experience with the algorithm is reported for problems with up to 8000 jobs and 10 first-stage machines.  相似文献   

9.
This paper describes the two-stage flowshop problem when there are identical multiple machines at each stage, and shows that the problem is NP-complete. An efficient heuristic algorithm is developed for finding an approximate solution of a special case when there is only one machine at stage 2. The effectiveness of the proposed heuristic algorithm in finding a minimum makespan schedule is empirically evaluated and found to increase with the increase in the number of jobs.  相似文献   

10.
It is known that for the open shop scheduling problem to minimize the makespan there exists no polynomial-time heuristic algorithm that guarantees a worst-case performance ratio better than 5/4, unless P≠NP. However, this result holds only if the instance of the problem contains jobs consisting of at least three operations. This paper considers the open shop scheduling problem, provided that each job consists of at most two operations, one of which is to be processed on one of the m⩾2 machines, while the other operation must be performed on the bottleneck machine, the same for all jobs. For this NP-hard problem we present a heuristic algorithm and show that its worst-case performance ratio is 5/4.  相似文献   

11.
在单机排序和工件运输的最小化最大完工时间问题中,工件首先在一台机器上加工,然后被一辆有容量限制的汽车运送到一个顾客.当工件的加工时间和尺寸无关时, Chang和Lee已经证明该问题是强NP困难的.他们也给出了一个启发式算法,它的最差执行比为5/3,并且这个界是紧的.本文考虑工件的加工时间和尺寸成正比的情形,证明了Chang和Lee的算法有更好的最差执行比53/35,并提供了一个新的启发式算法,它的最差执行比是3/2,并且这个界是最好的.  相似文献   

12.
Two-Machine Flowshop Batching and Scheduling   总被引:2,自引:0,他引:2  
We consider in this paper a two-machine flowshop scheduling problem in which the first machine processes jobs individually while the second machine processes jobs in batches. The forming of each batch on the second machine incurs a constant setup time. The objective is to minimize the makespan. This problem was previously shown to be NP-hard in the ordinary sense. In this paper, we first present a strong NP-hardness result of the problem. We also identify a polynomially solvable case with either anticipatory or non-anticipatory setups. We then establish a property that an optimal solution for the special case is a lower bound for the general problem. To obtain near-optimal solutions for the general problem, we devise some heuristics. The lower bound is used to evaluate the quality of the heuristic solutions. Results of computational experiments reveal that the heuristics produce solutions with small error ratios. They also suggest that the lower bound is close to the optimal solution.  相似文献   

13.
Machine scheduling with resource dependent processing times   总被引:1,自引:0,他引:1  
We consider machine scheduling on unrelated parallel machines with the objective to minimize the schedule makespan. We assume that, in addition to its machine dependence, the processing time of any job is dependent on the usage of a discrete renewable resource, e.g. workers. A given amount of that resource can be distributed over the jobs in process at any time, and the more of that resource is allocated to a job, the smaller is its processing time. This model generalizes the classical unrelated parallel machine scheduling problem by adding a time-resource tradeoff. It is also a natural variant of a generalized assignment problem studied previously by Shmoys and Tardos. On the basis of an integer linear programming formulation for a relaxation of the problem, we use LP rounding techniques to allocate resources to jobs, and to assign jobs to machines. Combined with Graham’s list scheduling, we show how to derive a 4-approximation algorithm. We also show how to tune our approach to yield a 3.75-approximation algorithm. This is achieved by applying the same rounding technique to a slightly modified linear programming relaxation, and by using a more sophisticated scheduling algorithm that is inspired by the harmonic algorithm for bin packing. We finally derive inapproximability results for two special cases, and discuss tightness of the integer linear programming relaxations.  相似文献   

14.
Scheduling research has increasingly taken the concept of deterioration into consideration. In this paper, we study a single machine group scheduling problem with deterioration effect, where the jobs are already put into groups, before any optimization. We assume that the actual processing times of jobs are increasing functions of their starting times, i.e., the job processing times are described by a function which is proportional to a linear function of time. The setup times of groups are assumed to be fixed and known. For some special cases of minimizing the makespan with ready times of the jobs, we show that the problem can be solved in polynomial time for the proposed model. For the general case, a heuristic algorithm is proposed, and the computational experiments show that the performance of the heuristic is fairly accurately in obtaining near-optimal solutions. The results imply that the average percentage error of the proposed heuristic algorithm from optimal solutions is less than 3%.  相似文献   

15.
This research focuses on the problem of scheduling jobs on two identical parallel machines that are not continuously available with the objective of minimizing total tardiness. After processing a given number of jobs, each machine requires a preventive maintenance task, during which the machine cannot process jobs. We present dominance properties and lower bounds, and develop a branch and bound algorithm using these properties and lower bounds as well as an upper bound obtained from a heuristic algorithm. Performance of the algorithm is evaluated through a series of computational experiments on randomly generated instances and results are reported.  相似文献   

16.
In this paper, we present a branch-and-bound approach for solving a two-machine flow shop scheduling problem, in which the objective is to minimize a weighted combination of job flowtime and schedule makespan. Experimental results show that the algorithm works very well for certain special cases and moderately well for others. In fact, it is able to produce optimal schedules for 500-job problems in which the second machine dominates the first machine. It is also shown that the algorithm developed to provide an upper bound for the branch-and-bound is optimal when processing times for jobs are the same on both machines. The primary reason for developing the branch-and-bound approach is that its results can be used to guide other heuristic techniques, such as simulated annealing, tabu search and genetic algorithms, in their search for optimal solutions for larger problems.  相似文献   

17.
研究了具有线性退化及学习效应作用下的单台机器调度问题,对于工件的到达时间是其资源消耗量的正的严格单调递减函数时,考虑了总资源消耗量限定情形下求最大完工时间最小化问题给出了最优算法.  相似文献   

18.
并行多机调度问题的一种遗传算法   总被引:1,自引:0,他引:1  
运用遗传算法对最小化完工时间的并行多机调度问题进行了研究,给出了最小完工时间的一个下界,由此提出了初始种群的一种构造方法,并用计算实例表明该方法适用于大规模并行多机调度问题  相似文献   

19.

We are given a set of parallel jobs that have to be executed on a set of speed-scalable processors varying their speeds dynamically. Running a job at a slower speed is more energy-efficient, however, it takes a longer time and affects the performance. Every job is characterized by the processing volume and the number or the set of the required processors. Our objective is to minimize the maximum completion time so that the energy consumption is not greater than a given energy budget. For various particular cases, we propose polynomial-time approximation algorithms, consisting of two stages. At the first stage, we give an auxiliary convex program. By solving this problem, we get processing times of jobs and a lower bound on the makespan. Then, at the second stage, we transform our problem into the corresponding scheduling problem with the constant speed of processors and construct a feasible schedule. We also obtain an “almost exact” solution for the preemptive settings based on a configuration linear program.

  相似文献   

20.
This paper considers a single machine scheduling problem with preventive maintenance. In many cases, a machine must be maintained after it continuously works for a period of time. But most papers in the literature ignore non-availability of the machine. For this reason, this paper studies the problem of scheduling processing of jobs and maintenance of machine simultaneously. The objective is to minimise total completion time of jobs. The problem is proved to be NP-hard in the strong sense. Three heuristic algorithms and a branch and bound algorithm are proposed. Computational experiments are done to evaluate the effectiveness of the algorithms.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号