首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
研究一类带有运输且加工具有灵活性的两阶段无等待流水作业排序问题, 其中每阶段只有一台机器, 每个工件有两道工序需要依次在两台机器上加工, 工件在两台机器上的加工及两道工序之间不允许等待. 给出两种近似算法, 并分别分析其最坏情况界. 第一种算法是排列排序, 证明了最坏情况界不超过5/2; 第二种算法将工件按照两道工序加工时间之和的递增顺序排序, 证明其最坏情况界不超过2. 最后, 通过数值模拟比较算法的性能. 对问题中各参数取不同值的情况, 分别生成若干个实例, 用算法得到的解与最优解的下界作比值, 通过分析这些比值的最大值、最小值和平均值来比较上述两个算法的性能.  相似文献   

2.
In this paper we propose a heuristic for solving the problem of resource constrained preemptive scheduling in the two-stage flowshop with one machine at the first stage and parallel unrelated machines at the second stage, where renewable resources are shared among the stages, so some quantities of the same resource can be used at different stages at the same time. Availability of every resource at any moment is limited and resource requirements of jobs are arbitrary. The objective is minimization of makespan. The problem is NP-hard. The heuristic first sequences jobs on the machine at stage 1 and then solves the preemptive scheduling problem at stage 2. Priority rules which depend on processing times and resource requirements of jobs are proposed for sequencing jobs at stage 1. A column generation algorithm which involves linear programming, a tabu search algorithm and a greedy procedure is proposed to minimize the makespan at stage 2. A lower bound on the optimal makespan in which sharing of the resources between the stages is taken into account is also derived. The performance of the heuristic evaluated experimentally by comparing the solutions to the lower bound is satisfactory.  相似文献   

3.
In scheduling problems with two competing agents, each one of the agents has his own set of jobs and his own objective function, but both share the same processor. The goal is to minimize the value of the objective function of one agent, subject to an upper bound on the value of the objective function of the second agent. In this paper we study two-agent scheduling problems on a proportionate flowshop. Three objective functions of the first agent are considered: minimum maximum cost of all the jobs, minimum total completion time, and minimum number of tardy jobs. For the second agent, an upper bound on the maximum allowable cost is assumed. We introduce efficient polynomial time solution algorithms for all cases.  相似文献   

4.
Two-machine flowshop scheduling to minimize makespan is one of the most well-known classical scheduling problems. Johnson’s rule for solving this problem has been widely cited in the literature. We introduce in this paper the concept of composite job, which is an artificially constructed job with processing times such that it will incur the same amount of idle time on the second machine as that incurred by a chain of jobs in a given processing sequence. This concept due to Kurisu first appeared in 1976 to deal with the two-machine flowshop scheduling problem involving precedence constraints among the jobs. We show that this concept can be applied to reduce the computational time to solve some related scheduling problems. We also establish a link between solving the two-machine flowshop makespan minimization problem using Johnson’s rule and the relocation problem introduced by Kaplan. We present an intuitive interpretation of Johnson’s rule in the context of the relocation problem.  相似文献   

5.
This study considers a hybrid assembly-differentiation flowshop scheduling problem (HADFSP), in which there are three production stages, including components manufacturing, assembly, and differentiation. All the components of a job are processed on different machines at the first stage. Subsequently, they are assembled together on a common single machine at the second stage. At the third stage, each job of a particular type is processed on a dedicated machine. The objective is to find a job schedule to minimize total flow time (TFT). At first, a mixed integer programming (MIP) model is formulated and then some properties of the optimal solution are presented. Since the NP-hardness of the problem, two fast heuristics (SPT-based heuristic and NEH-based heuristic) and three hybrid meta-heuristics (HGA-VNS, HDDE-VNS and HEDA-VNS) are developed for solving medium- and large-size problems. In order to evaluate the performances of the proposed algorithms, a lower bound for the HADFSP with TFT criteria (HADFSP-TFT) is established. The MIP model and the proposed algorithms are compared on randomly generated problems. Computational results show the effectiveness of the MIP model and the proposed algorithms. The computational analysis indicates that, in average, the HDDE-VNS performs better and more robustly than the other two meta-heuristics, whereas the NEH heuristic consume little time and could reach reasonable solutions.  相似文献   

6.
This paper considers two scheduling problems for a two-machine flowshop where a single machine is followed by a batching machine. The first problem is that there is a transporter to carry the jobs between machines. The second problem is that there are deteriorating jobs to be processed on the single machine. For the first problem with minimizing the makespan, we formulate it as a mixed integer programming model and then prove that it is strongly NP-hard. A heuristic algorithm is proposed for solving this problem and its worst case performance is analyzed. The computational experiments are carried out and the numerical results show that the heuristic algorithm is effective. For the second problem, we derive the optimal algorithms with polynomial time for minimizing the makespan, the total completion time and the maximum lateness, respectively.  相似文献   

7.
This paper focuses on a two-machine re-entrant flowshop scheduling problem with the objective of minimizing makespan. In the re-entrant flowshop considered here, all jobs must be processed twice on each machine, that is, each job should be processed on machine 1, machine 2 and then machine 1 and machine 2. We develop dominance properties, lower bounds and heuristic algorithms for the problem, and use these to develop a branch and bound algorithm. For evaluation of the performance of the algorithms, computational experiments are performed on randomly generated test problems. Results of the experiments show that the suggested branch and bound algorithm can solve problems with up to 200 jobs in a reasonable amount of CPU time.  相似文献   

8.
We treat a problem of scheduling n jobs on a three stages hybrid flowshop of particular structure (one machine in the first and third stages and two dedicated machines in stage two). The objective is to minimize the makespan. This problem is NP-complete. We propose two heuristic procedures to cope with realistic problems. Extensive experimentation with various problem sizes are conducted and the computational results show excellent performance of the proposed heuristics.  相似文献   

9.
In this paper, we consider a permutation flowshop scheduling problem with deteriorating jobs. The objective is to minimize the total tardiness of all jobs. A branch-and-bound algorithm incorporating with a dominance property and a lower bound is developed. Furthermore, two metaheuristic algorithms, the simulated annealing algorithm, and the particle swarm optimization method, are proposed. Finally, computational studies are given.  相似文献   

10.
In a flowshop scheduling problem, a set of jobs is processed by a set of machines. The jobs follow the same sequence in all machines. We study the flowshop scheduling problem under a new case of machine dominance that is often found in the manufacturing of computers and electronic devices. We provide a formula for makespan value for a given sequence, show that the makespan value depends only on certain jobs in the sequence, and present an algorithm that finds a sequence with minimum makespan. Numerical examples of the solution approaches are provided.  相似文献   

11.
This paper analyses the total tardiness minimization in a flowshop with multiple processors at each stage. While there is considerable research to minimize the makespan, very little work is reported on minimizing the total tardiness for this problem. This research focuses on heuristic methods that consider this environment as a series of parallel machine problems. New dispatching rules are introduced. One of the proposed rules is able to deal with jobs that will come afterwards and not only the available jobs at the decision time. Dispatching rules are also associated with classical (forward and backward) and new list scheduling algorithms. A special scheduling algorithm able to deal with idle times is proposed. Computational experiments in a set of 4,320 literature instances show that the developed heuristics are competitive and outperforms their classical counterparts.  相似文献   

12.
This paper considers a two-stage flexible flowshop scheduling problem with no waiting time between two sequential operations of a job and no idle time between two consecutive processed jobs on machines of the second stage. We show its complexity and present a heuristic algorithm with asymptotically tight error bounds.  相似文献   

13.
The distributed permutation flowshop problem has been recently proposed as a generalization of the regular flowshop setting where more than one factory is available to process jobs. Distributed manufacturing is a common situation for large enterprises that compete in a globalized market. The problem has two dimensions: assigning jobs to factories and scheduling the jobs assigned to each factory. Despite being recently introduced, this interesting scheduling problem has attracted attention and several heuristic and metaheuristic methods have been proposed in the literature. In this paper we present a scatter search (SS) method for this problem to optimize makespan. SS has seldom been explored for flowshop settings. In the proposed algorithm we employ some advanced techniques like a reference set made up of complete and partial solutions along with other features like restarts and local search. A comprehensive computational campaign including 10 existing algorithms, together with statistical analyses, shows that the proposed scatter search algorithm produces better results than existing algorithms by a significant margin. Moreover all 720 known best solutions for this problem are improved.  相似文献   

14.
We consider a scheduling problem in a factory producing printed circuit boards (PCBs). The PCB assembly process in this factory can be regarded as a flowshop which has two special characteristics: jobs have sequence dependent setup times and each job consists of a lot (batch) of identical PCBs. Because of the latter characteristic, it is possible to start a job on a following machine before the job is entirely completed on a previous machine, that is, there is time-lag between machines. In this paper, we propose several heuristics, including taboo search (TS) and simulated annealing (SA) methods, for this generalized flowshop scheduling problem with the objective of minimizing mean tardiness. We compare suggested heuristics after series of tests to find appropriate values for parameters needed for the two search algorithms, TS and SA. Results of computational tests on randomly generated test problems are reported.  相似文献   

15.
The flowshop scheduling problems with n jobs processed on two or three machines, and with two jobs processed on k machines are addressed where jobs have random and bounded processing times. The probability distributions of random processing times are unknown, and only the lower and upper bounds of processing times are given before scheduling. In such cases, there may not exist a unique schedule that remains optimal for all feasible realizations of the processing times, and therefore, a set of schedules has to be considered which dominates all other schedules for the given criterion. We obtain sufficient conditions when transposition of two jobs minimizes total completion time for the cases of two and three machines. The geometrical approach is utilized for flowshop problem with two jobs and k machines.  相似文献   

16.
This paper considers a scheduling problem in a two-machine flowshop of two batch processing machines. On each batch processing machine, jobs are processed in a batch, and each batch is allowed to contain jobs up to the maximum capacity of the associated machine. The scheduling problem is analyzed with respect to three due date related objectives including maximum tardiness, number of tardy jobs and total tardiness. In the analysis, several solution properties are characterized and based upon these properties, three efficient polynomial time algorithms are developed for minimizing the due date related measures.  相似文献   

17.
We present a branch and bound algorithm for a two-machine re-entrant flowshop scheduling problem with the objective of minimizing total tardiness. In the re-entrant flowshop considered here, all jobs must be processed twice on each machine, that is, each job should be processed on machine 1, machine 2 and then machine 1 and machine 2. By regarding a job as a pair of sub-jobs, each of which represents a pass through the two machines, we develop dominance properties, a lower bound and heuristic algorithms for the problem, and use these to develop a branch and bound algorithm. For evaluation of the performance of the algorithms, computational experiments are performed on randomly generated test problems and results are reported. Results of the experiments show that the suggested branch and bound algorithm can solve problems with up to 20 sub-jobs in a reasonable amount of CPU time, and the average percentage gap of the heuristic solutions is about 13%.  相似文献   

18.
Scheduling with deteriorating jobs and learning effects has been widely studied. However, multi-agent scheduling with simultaneous considerations of deteriorating jobs and learning effects has hardly been considered until now. In view of this, we consider a two-agent single-machine scheduling problem involving deteriorating jobs and learning effects simultaneously. In the proposed model, given a schedule, we assume that the actual processing time of a job of the first agent is a function of position-based learning while the actual processing time of a job of the second agent is a function of position-based deterioration. The objective is to minimize the total weighted completion time of the jobs of the first agent with the restriction that no tardy job is allowed for the second agent. We develop a branch-and-bound and several simulated annealing algorithms to solve the problem. Computational results show that the proposed algorithms are efficient in producing near-optimal solutions.  相似文献   

19.

We are given a set of parallel jobs that have to be executed on a set of speed-scalable processors varying their speeds dynamically. Running a job at a slower speed is more energy-efficient, however, it takes a longer time and affects the performance. Every job is characterized by the processing volume and the number or the set of the required processors. Our objective is to minimize the maximum completion time so that the energy consumption is not greater than a given energy budget. For various particular cases, we propose polynomial-time approximation algorithms, consisting of two stages. At the first stage, we give an auxiliary convex program. By solving this problem, we get processing times of jobs and a lower bound on the makespan. Then, at the second stage, we transform our problem into the corresponding scheduling problem with the constant speed of processors and construct a feasible schedule. We also obtain an “almost exact” solution for the preemptive settings based on a configuration linear program.

  相似文献   

20.
Scheduling with learning effects has received continuing attention in the recent days. However, it can be found that the actual processing time of a given job drops to zero precipitously as the job has a big processing time or the number of jobs increases. Moreover, most researchers paid more attention to single-machine settings, and the flowshop settings then are relatively unexplored. Motivated by these observations, we consider a two-machine total completion time flowshop problem in which the actual job processing time is a function depending on the jobs that have already been processed and a control parameter. In this paper, we develop a branch-and-bound and a genetic heuristic-based algorithm for the problem. In addition, the experimental results of all proposed algorithms are also provided.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号