首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
Motivated by the logistics operations in an express delivery company, we develop and study a new scheduling model. The problem seems similar to scheduling with sequence-dependent setup times and scheduling with release times, however, the ability to combine or separate the job operations makes our problem unique.  相似文献   

2.
Almost all of the research on the economic lot scheduling problem (ELSP) has assumed that setup times are sequence-independent even though sequence-dependent problems are common in practice. Furthermore, most of the solution approaches that have been developed solve for a single optimal schedule when in practice it is more important to provide managers with a range of schedules of different length and complexity. In this paper, we develop a heuristic procedure to solve the ELSP problem with sequence-dependent setups. The heuristic provides a range of solutions from which a manager can choose, which should prove useful in an actual stochastic production environment. We show that our heuristic can outperform Dobson's heuristic when the utilization is high and the sequence-dependent setup times and costs are significant.  相似文献   

3.
This paper deals with the problem of scheduling jobs in uniform parallel machines with sequence-dependent setup times in order to minimize the total tardiness relative to job due dates. We propose GRASP versions that incorporate adaptive memory principles for solving this problem. Long-term memory is used in the construction of an initial solution and in a post-optimization procedure which connects high quality local optima by means of path relinking. Computational tests are carried out on a set of benchmark instances and the proposed GRASP versions are compared with heuristic methods from the literature.  相似文献   

4.
A lot sizing and scheduling problem from a foundry is considered in which key materials are produced and then transformed into many products on a single machine. A mixed integer programming (MIP) model is developed, taking into account sequence-dependent setup costs and times, and then adapted for rolling horizon use. A relax-and-fix (RF) solution heuristic is proposed and computationally tested against a high-performance MIP solver. Three variants of local search are also developed to improve the RF method and tested. Finally the solutions are compared with those currently practiced at the foundry.  相似文献   

5.
In this paper we present a mixed integer programming model that integrates production lot sizing and scheduling decisions of beverage plants with sequence-dependent setup costs and times. The model considers that the industrial process produces soft drink bottles in different flavours and sizes, and it is carried out in two production stages: liquid preparation (stage I) and bottling (stage II). The model also takes into account that the production bottleneck may alternate between stages I and II, and a synchronisation of the production between these stages is required. A relaxation approach and several strategies of the relax-and-fix heuristic are proposed to solve the model. Computational tests with instances generated based on real data from a Brazilian soft drink plant are also presented. The results show that the solution approaches are capable of producing better solutions than those used by the company.  相似文献   

6.
Industries are incorporating robots into assembly lines due to their greater flexibility and reduced costs. Most of the reported studies did not consider scheduling of tasks or the sequence-dependent setup times in an assembly line, which cannot be neglected in a real-world scenario. This paper presents a study on robotic assembly line balancing, with the aim of minimizing cycle time by considering sequence-dependent setup times. A mathematical model for the problem is formulated and CPLEX solver is utilized to solve small-sized problems. A recently developed metaheuristic Migrating Birds Optimization (MBO) algorithm and set of metaheuristics have been implemented to solve the problem. Three different scenarios are tested (with no setup time, and low and high setup times). The comparative experimental study demonstrates that the performance of the MBO algorithm is superior for the tested datasets. The outcomes of this study can help production managers improve their production system in order to perform the assembly tasks with high levels of efficiency and quality.  相似文献   

7.
In this paper we present a new Discrete Particle Swarm Optimization (DPSO) approach to face the NP-hard single machine total weighted tardiness scheduling problem in presence of sequence-dependent setup times. Differently from previous approaches the proposed DPSO uses a discrete model both for particle position and velocity and a coherent sequence metric. We tested the proposed DPSO mainly over a benchmark originally proposed by Cicirello in 2003 and available online. The results obtained show the competitiveness of our DPSO, which is able to outperform the best known results for the benchmark. In addition, we also tested the DPSO on a set of benchmark instances from ORLIB for the single machine total weighted tardiness problem, and we analysed the role of the DPSO swarm intelligence mechanisms as well as the local search intensification phase included in the algorithm.  相似文献   

8.
We study a single machine scheduling problem with availability constraints and sequence-dependent setup costs, with the aim of minimizing the makespan. To the authors’ knowledge, this problem has not been treated as such in the operations research literature. We derive in this paper a mixed integer programming model to deal with such scheduling problem. Computational tests showed that commercial solvers are capable of solving only small instances of the problem. Therefore, we propose two ways for reducing the execution time, namely a valid inequality that strengthen the linear relaxation and an efficient heuristic procedure that provides a starting feasible solution to the solver. A substantial gain is achieved both in terms of the linear programming relaxation bound and in terms of the time to obtain an integer optimum when we use the enhanced model in conjunction with providing to the solver the solution obtained by the proposed heuristic.  相似文献   

9.
In this paper, we develop a three-step heuristic to address a production scheduling problem at a high volume assemble-to-order electronics manufacturer. The heuristic provides a solution for scheduling multiple product families on parallel, identical production lines so as to minimize setup costs. The heuristic involves assignment, sequencing, and time scheduling steps, with an optimization approach developed for each step. For the most complex step, the sequencing step, we develop a greedy randomized adaptive search procedure (GRASP). We compare the setup costs resulting from the use of our scheduling heuristic against a heuristic previously developed and implemented at the electronics manufacturer that assumes approximately equal, sequence-independent, setup costs. By explicitly considering the sequence-dependent setup costs and applying GRASP, our empirical results show a reduction in setups costs for an entire factory of 14–21% with a range of single production line reductions from 0% to 49%.  相似文献   

10.
In this paper, we consider a modified shifting bottleneck heuristic for complex job shops. The considered job shop environment contains parallel batching machines, machines with sequence-dependent setup times and reentrant process flows. Semiconductor wafer fabrication facilities (Wafer Fabs) are typical examples for manufacturing systems with these characteristics. Our primary performance measure is total weighted tardiness (TWT). The shifting bottleneck heuristic uses a disjunctive graph to decompose the overall scheduling into scheduling problems for single tool groups. The scheduling algorithms for these scheduling problems are called subproblem solution procedures (SSPs). In previous research, only subproblem solution procedures based on dispatching rules have been considered. In this paper, we are interested in how much we can gain in terms of TWT if we apply more sophisticated subproblem solution procedures like genetic algorithms for parallel machine scheduling. We conduct simulation experiments in a dynamic job shop environment in order to assess the performance of the suggested subproblem solution procedures. It turns out that using near to optimal subproblem solution procedures leads in many situations to improved results compared to dispatching-based subproblem solution procedures.  相似文献   

11.
Scheduling problems in real systems often require sequence-dependent setup times. The topic of sequence-dependent setup times has not been addressed adequately, and improved competitiveness is thus not achieved. This study proposes a hybrid approach that takes advantage of simulated annealing (SA) and tabu search (TS) to solve single-machine tardiness problems with sequence-dependent setup times. To verify the proposed approach, experiments were conducted on benchmark problem sets that included both the weighted and un-weighted tardiness problems. The results show that the performance of the hybrid approach is superior to that of the SA, genetic algorithm, TS and ant colony optimization approaches, and is comparable with the Tabu-VNS approach. And the proposed approach found new upper bound values for many benchmark problems with an acceptable computational time.  相似文献   

12.
The classical Simple Assembly Line Balancing Problem (SALBP) has been widely enriched over the past few years with many realistic approaches and much effort has been made to reduce the distance between the academic theory and the industrial reality. Despite this effort, the scheduling of the execution of tasks assigned to every workstation following the balancing of the assembly line has been scarcely reported in the scientific literature. This is supposed to be an operational concern that the worker should solve himself, but in several real environments, setups between tasks exist and optimal or near-optimal tasks schedules should be provided inside each workstation. The problem presented in this paper adds sequence-dependent setup time considerations to the classical SALBP in the following way: whenever a task is assigned next to another at the same workstation, a setup time must be added to compute the global workstation time. After formulating a mathematical model for this innovative problem and showing the high combinatorial nature of the problem, eight different heuristic rules and a GRASP algorithm are designed and tested for solving the problem in reasonable computational time.  相似文献   

13.

The order acceptance and scheduling (OAS) problem is an important topic for make-to-order production systems with limited production capacity and tight delivery requirements. This paper proposes a new algorithm based on Artificial Bee Colony (ABC) for solving the single machine OAS problem with release dates and sequence-dependent setup times. The performance of the proposed ABC-based algorithm was validated by a benchmark problem set of test instances with up to 100 orders. Experimental results showed that the proposed ABC-based algorithm outperformed three state-of-art metaheuristic-based algorithms from the literature. It is believed that this study successfully demonstrates a high-performance algorithm that can serve as a new benchmark approach for future research on the OAS problem addressed in this study.

  相似文献   

14.
In this paper, a new memetic algorithm (MA) for the total tardiness single machine scheduling (SMS) problem with due dates and sequence-dependent setup times is proposed. The main contributions with respect to the implementation of the hybrid population approach are a hierarchically structured population conceived as a ternary tree and the evaluation of three recombination operators. Concerning the local improvement procedure, several neighborhood reduction schemes are developed and proved to be effective when compared to the complete neighborhood. Results of computational experiments are reported for a set of randomly generated test problems. The memetic approach and a pure genetic algorithm (GA) version are compared with a multiple start algorithm that employs the all-pairs neighborhood as well as two constructive heuristics.  相似文献   

15.
This paper deals with the job-shop scheduling problem with sequence-dependent setup times. We propose a new method to solve the makespan minimization problem to optimality. The method is based on iterative solving via branch and bound decisional versions of the problem. At each node of the branch and bound tree, constraint propagation algorithms adapted to setup times are performed for domain filtering and feasibility check. Relaxations based on the traveling salesman problem with time windows are also solved to perform additional pruning. The traveling salesman problem is formulated as an elementary shortest path problem with resource constraints and solved through dynamic programming. This method allows to close previously unsolved benchmark instances of the literature and also provides new lower and upper bounds.  相似文献   

16.
This paper addresses a production scheduling problem in a single-machine environment, where a job can be either early, on time, late, or rejected. In order acceptance and scheduling contexts, it is assumed that the production capacity of a company is overloaded. The problem is therefore to decide which orders to accept and how to sequence their production. In contrast with the existing literature, the considered problem jointly takes into account the following features: earliness and tardiness penalties (which can be linear or quadratic), sequence-dependent setup times and costs, rejection penalties, and the possibility of having idle times. The practical relevance of this new NP-hard problem is discussed and various solution methods are proposed, ranging from a basic greedy algorithm to refined metaheuristics (e.g., tabu search, the adaptive memory algorithm, population-based approaches loosely inspired on ant algorithms). The methods are compared for instances with various structures containing up to 200 jobs. For small linear instances, the metaheuristics are favorably compared with an exact formulation using CPLEX 12.2. Managerial insights and recommendations are finally given.  相似文献   

17.
18.
The two-stage assembly flowshop scheduling problem has been addressed with respect to different criteria in the literature where setup times are ignored. For some applications, setup times are essential to be explicitly considered since they may take considerable amount of time. We address the two-stage assembly flowshop scheduling problem with respect to maximum lateness criterion where setup times are treated as separate from processing times. We formulate the problem and obtain a dominance relation. Moreover, we propose a self-adaptive differential evolution heuristic. To the best of our knowledge, this is the first attempt to use a self-adaptive differential evolution heuristic to a scheduling problem. We conduct extensive computational experiments to compare the performance of the proposed heuristic with those of particle swarm optimization (PSO), tabu search, and EDD heuristics. The computational analysis indicates that PSO performs much better than tabu and EDD. Moreover, the analysis indicates that the proposed self-adaptive differential evolution heuristic performs as good as PSO in terms of the average error while only taking one-third of CPU time of PSO.  相似文献   

19.
We consider the problem of scheduling n independent jobs on m unrelated parallel machines with sequence-dependent setup times and availability dates for the machines and release dates for the jobs to minimize a regular additive cost function. In this work, we develop a new branch-and-price optimization algorithm for the solution of this general class of parallel machines scheduling problems. A new column generation accelerating method, termed “primal box”, and a specific branching variable selection rule that significantly reduces the number of explored nodes are proposed. The computational results show that the approach solves problems of large size to optimality within reasonable computational time.  相似文献   

20.
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号