首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
陈光亭  陈蕾  张安  陈永 《运筹学学报》2016,20(4):109-114
研究可转包的两台流水作业机排序问题, 目标是极小化最大完工时间和总外包费用之和. 首先给出最坏情况界为2的近似算法, 接着对工件满足有序化约束的情形给出最坏情况界为\frac{3}{2}的改进算法, 以上算法界均为紧界.  相似文献   

2.
This paper deals with the two machine permutation flow shop problem with uncertain data, whose deterministic counterpart is known to be polynomially solvable. In this paper, it is assumed that job processing times are uncertain and they are specified as a discrete scenario set. For this uncertainty representation, the min-max and min-max regret criteria are adopted. The min-max regret version of the problem is known to be weakly NP-hard even for two processing time scenarios. In this paper, it is shown that the min-max and min-max regret versions of the problem are strongly NP-hard even for two scenarios. Furthermore, the min-max version admits a polynomial time approximation scheme if the number of scenarios is constant and it is approximable with performance ratio of 2 and not (4/3 − ?)-approximable for any ? > 0 unless P = NP if the number of scenarios is a part of the input. On the other hand, the min-max regret version is not at all approximable even for two scenarios.  相似文献   

3.
We consider a generalization of the classical open shop and flow shop scheduling problems where the jobs are located at the vertices of an undirected graph and the machines, initially located at the same vertex, have to travel along the graph to process the jobs. The objective is to minimize the makespan. In the tour-version the makespan means the time by which each machine has processed all jobs and returned to the initial location. While in the path-version the makespan represents the maximum completion time of the jobs. We present improved approximation algorithms for various cases of the open shop problem on a general graph, and the tour-version of the two-machine flow shop problem on a tree. Also, we prove that both versions of the latter problem are NP-hard, which answers an open question posed in the literature.  相似文献   

4.
5.
In this paper we consider coupled-task single-machine and two-machine flow shop scheduling problems with exact delays, unit processing times, and the makespan as an objective function. The main results of the paper are fast 7/4- and 3/2-approximation algorithms for solving the single- and two-machine problems, respectively.  相似文献   

6.
In this paper, we consider the problem of scheduling jobs in a flowshop with two batch processing machines such that the makespan is minimized. Batch processing machines are frequently encountered in many industrial environments such as heat treatment operations in a steel foundry and chemical processes performed in tanks or kilns. Improved Mixed Integer Linear Programming (MILP) models are presented for the flowshop problem with unlimited or zero intermediate storage. An MILP-based heuristic is also developed for the problem. Computational experiments show that the new MILP models can significantly improve the original ones. Also, the heuristic can obtain the optimal solutions for all the test problem instances.  相似文献   

7.
The paper deals with the m-machine permutation flow shop scheduling problem in which job processing times, along with a processing order, are decision variables. It is assumed that the cost of processing a job on each machine is a linear function of its processing time and the overall schedule cost to be minimized is the total processing cost plus maximum completion time cost. A algorithm for the problem with m = 2 is provided; the best approximation algorithm until now has a worst-case performance ratio equal to . An extension to the m-machine (m ≥2) permutation flow shop problem yields an approximation algorithm with a worst-case bound equal to

, where is the worst-case performance ratio of a procedure used, in the proposed algorithm, for solving the (pure) sequencing problem. Moreover, examples which achieve this bound for = 1 are also presented.  相似文献   

8.
This paper considers a two-machine ordered flow shop problem, where each job is processed through the in-house system or outsourced to a subcontractor. For in-house jobs, a schedule is constructed and its performance is measured by the makespan. Jobs processed by subcontractors require paying an outsourcing cost. The objective is to minimize the sum of the makespan and the total outsourcing cost. Since this problem is NP-hard, we present an approximation algorithm. Furthermore, we consider three special cases in which job j has a processing time requirement pj, and machine i a characteristic qi. The first case assumes the time job j occupies machine i is equal to the processing requirement divided by a characteristic value of machine i, that is, pj/qi. The second (third) case assumes that the time job j occupies machine i is equal to the maximum (minimum) of its processing requirement and a characteristic value of the machine, that is, max{pjqi} (min{pjqi}). We show that the first and the second cases are NP-hard and the third case is polynomially solvable.  相似文献   

9.
Batch processing machines are commonly used in wafer fabrication, kilns, and chambers used for environmental stress screening (ESS). This paper proposes two models to schedule batches of jobs on two machines in a flow shop. A set of jobs with known processing times and sizes has to be grouped, to form batches, in order to be processed on the batch processing machines. The jobs are nonidentical in size. The processing time of a batch is the longest processing time of all the jobs in that batch. Mixed integer formulations are proposed for the flow shop problem when the buffer capacity is unlimited or zero. Numerical examples are presented to demonstrate the application of our model.  相似文献   

10.
We consider the processing of M jobs in a flow shop with N stations in which only a single server is in charge of all stations. We demonstrate that for the objective of minimizing the total setup and holding cost, a class of easily implementable schedules is asymptotically optimal.  相似文献   

11.
The two-machine flowshop environment with sequence-independent setup times has been intensely investigated both from theoretical and practical perspectives in the scheduling literature. Nevertheless, very scant attention has been devoted to deriving effective lower bounding strategies. In this paper, we propose new lower bounds for the total completion time minimization criterion. These bounds are based on three relaxation schemes, namely the waiting time-based relaxation scheme, the single machine-based relaxation scheme, and the Lagrangian relaxation scheme. Extensive computational study carried on instances with up to 500 jobs reveals that embedding the waiting time-based bounding strategy within the Lagrangian relaxation framework yields the best performance while requiring negligible CPU time.  相似文献   

12.
The makespan minimization problem in flow shops with no-idle constraints on machines is considered. The latter means that each machine, once started, must process all its operations without intermediate idle time until all those operations are completed. The problem is known to be strongly NP-hard already for three machines. While being based on a geometrical approach, we propose several polynomial time heuristics (for the general case and for special cases of 3 and 4 machines) which provide asymptotically optimal solutions for the increasing number of jobs. A comprehensive review of relevant results is also presented.  相似文献   

13.
In this paper, we address a two-machine flow shop scheduling problem under simple linear deterioration. By a simple linear deterioration function, we mean that the processing time of a job is a simple linear function of its execution start time. The objective is to find a sequence that minimizes total weighted completion time. Optimal schedules are obtained for some special cases. For the general case, several dominance properties and two lower bounds are derived to speed up the elimination process of a branch-and-bound algorithm. A heuristic algorithm is also proposed to overcome the inefficiency of the branch-and-bound algorithm. Computational analysis on randomly generated problems is conducted to evaluate the branch-and-bound algorithm and heuristic algorithm.  相似文献   

14.
In this paper we provide a fairly complete complexity classification of various versions of the two-machine permutation flow shop scheduling problem to minimize the makespan in which some of the jobs have to be processed with no-wait in process. For some version, we offer a fully polynomial-time approximation scheme and a -approximation algorithm.  相似文献   

15.
The classical Simple Assembly Line Balancing Problem (SALBP) has been widely enriched over the past few years with many realistic approaches and much effort has been made to reduce the distance between the academic theory and the industrial reality. Despite this effort, the scheduling of the execution of tasks assigned to every workstation following the balancing of the assembly line has been scarcely reported in the scientific literature. This is supposed to be an operational concern that the worker should solve himself, but in several real environments, setups between tasks exist and optimal or near-optimal tasks schedules should be provided inside each workstation. The problem presented in this paper adds sequence-dependent setup time considerations to the classical SALBP in the following way: whenever a task is assigned next to another at the same workstation, a setup time must be added to compute the global workstation time. After formulating a mathematical model for this innovative problem and showing the high combinatorial nature of the problem, eight different heuristic rules and a GRASP algorithm are designed and tested for solving the problem in reasonable computational time.  相似文献   

16.
This paper addresses scheduling a set of jobs on a single machine for delivery in batches to one customer or to another machine for further processing. The problem is a natural extension of that of minimising the sum of weighted flow times, considering the possibility of delivering jobs in batches and introducing batch delivery costs. The scheduling objective adopted is that of minimising the sum of weighted flow times and delivery costs. The extended problem arises in the context of coordination between machine scheduling and a distribution system in a supply chain network. Structural properties of the problem are investigated and used to devise a branch-and-bound solution method. For the special case, when the maximum number of batches is fixed, the branch-and-bound scheme provided shows significant improvements over an existing dynamic-programming algorithm.  相似文献   

17.
Approximability of flow shop scheduling   总被引:3,自引:0,他引:3  
Shop scheduling problems are notorious for their intractability, both in theory and practice. In this paper, we construct a polynomial approximation scheme for the flow shop scheduling problem with an arbitrary fixed number of machines. For the three common shop models (open, flow, and job), this result is the only known approximation scheme. Since none of the three models can be approximated arbitrarily closely in the general case (unless P = NP), the result demonstrates the approximability gap between the models in which the number of machines is fixed, and those in which it is part of the input of the instance. The result can be extended to flow shops with job release dates and delivery times and to flow shops with a fixed number of stages, where the number of machines at any stage is fixed. © 1998 The Mathematical Programming Society, Inc. Published by Elsevier Science B.V.A preliminary version of this paper appeared in theProceedings of the 36th Annual IEEE Symposium on the Foundations of Computer Science, 1995.Research supported by NSF grant DMI-9496153.  相似文献   

18.
In this paper, we present new approximation results for the offline problem of single machine scheduling with sequence-independent set-ups and item availability, where the jobs to be scheduled are independent (i.e., have no precedence constraints) and have a common release time.We present polynomial-time approximation algorithms for two versions of this problem. In the first version, the input includes a weight for each job, and the goal is to minimize the total weighted completion time. On any input, our algorithm produces a schedule whose total weighted completion time is within a factor 2 of optimal for that input.In the second version, the input includes a due date for each job, and the goal is to minimize the maximum lateness of any job. On any input, our algorithm produces a schedule with the following performance guarantee: the maximum lateness of a job is at most the maximum lateness of the optimal schedule on a machine that runs at half the speed of our machine.  相似文献   

19.
This paper presents an enhanced migrating bird optimization (MBO) algorithm and a new heuristic for solving a scheduling problem. The proposed approaches are applied to a permutation flowshop with sequence dependent setup times and the objective of minimizing the makespan. In order to augment the MBOs intensification capacity, an original problem specific heuristic is introduced. An adapted neighborhood, a tabu list, a restart mechanism and an original process for selecting a new leader also improved the MBO’s behavior. Using benchmarks from the literature, the resulting enhanced MBO (EMBO) gives state-of-the-art results when compared with other algorithms reference. A statistical analysis of the numerical experiments confirms the relative efficiency and effectiveness of both EMBO and the new heuristic.  相似文献   

20.
This paper studies a two-machine scheduling problem with deteriorating jobs which their processing times depend on their waiting time. We develop a branch and bound algorithm to minimize the total tardiness criteria. A lower bound, several dominance properties and an initial upper bound derived from a heuristic algorithm are used to increase the speed of branch and bound algorithm and decrease its required memory space. Computational results are presented to evaluate effectiveness and efficiency of the algorithms.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号