首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
The optimization problem addressed in this paper is an advanced form of the flexible job shop scheduling problem (FJSP) which also covers process plan flexibility and separable/non-separable sequence dependent setup times in addition to routing flexibility. Upon transforming the problem into an equivalent network problem, two mixed integer goal programming models are formulated. In the first model (Model A) the sequence dependent setup times are non-separable. In the second one (Model B) they are separable. Model B is obtained from Model A with a minor modification. The formulation of the models is described on a small sized numerical example and the solutions are interpreted. Finally, computational results are obtained on test problems.  相似文献   

2.
针对具有工艺路径柔性的车间调度问题,提出基于OR子图和子路径的工艺路径柔性描述方法,该描述方法形式简单且允许OR子图多层嵌套。以此为基础,设计了基于遗传算法的工艺路径柔性调度算法,并采用以工艺路径编码、机器编码和工件调度编码为基础的三维染色体编码策略,其中,工艺路径编码和机器编码分别通过最大子路径数量和最大机器数量随机产生,其优势在于任意染色体均表示可行解,并可以使用简单的交叉算子和变异算子实现遗传操作且其后代亦为可行解。最后通过实验证明了算法的优化能力。  相似文献   

3.
Routing and scheduling problems have received considerable attention in the literature in terms of model building and algorithm development. On these fronts, progress has been substantial. However, one often neglected (yet critical) aspect concerning the use of these models and algorithms is their data requirements. In particular, the distance matrix yielding the shortest distance between each pair of sites (nodes) represents a major portion of the data required by all such problems. Yet, such data are seldom available with the degree of accuracy desired and often are not available at all.This paper describes an efficient method for obtaining this distance matrix that is based on the underlying road structure for the geographic region in question. Thus, the distances obtained reflect ‘actual’ distances. Finally, the paper presents some brief computational experience and discusses an implementation concerning the routing of environmental inspectors in the state of Pennsylvania.  相似文献   

4.
This research seeks to propose innovative routing and scheduling strategies to help city couriers reduce operating costs and enhance service level. The strategies are realized by constructing a new type of routing and scheduling problem. The problem directly takes into account the inherent physical and operating constraints associated with riding in city distribution networks, which makes the problem involve multiple objectives and visiting specified nodes and arcs. Through network transformations, this study first formulates the city-courier routing and scheduling problem as a multi-objective multiple traveling salesman problem with strict time windows (MOMTSPSTW) that is NP-hard and new to the literature, and then proposes a multi-objective Scatter Search framework that seeks to find the set of Pareto-optimal solutions to the problem. Various new and improved sub-procedures are embedded in the solution framework. This is followed by an empirical study that shows and analyzes the results of applying the proposed method to a real-life city-courier routing and scheduling problem.  相似文献   

5.
This paper is concerned with the problem of assigning employees to gas stations owned by the Kuwait National Petroleum Corporation (KNPC), which hires a firm to prepare schedules for assigning employees to about 86 stations distributed all over Kuwait. Although similar employee scheduling problems have been addressed in the literature, certain peculiarities of the problem require novel mathematical models and algorithms to deal with the specific nature and size of this problem. The problem is modeled as a mixed-integer program, and a problem size analysis based on real data reveals that the formulation is too complex to solve directly. Hence, a two-stage approach is proposed, where the first stage assigns employees to stations, and the second stage specifies shifts and off-days for each employee. Computational results related to solving the two-stage models directly via CPLEX and by specialized heuristics are reported. The two-stage approach provides daily schedules for employees for a given time horizon in a timely fashion, taking into consideration the employees’ expressed preferences. This proposed modeling approach can be incorporated within a decision support system to replace the current manual scheduling practice that is often chaotic and has led to feelings of bias and job dissatisfaction among employees.  相似文献   

6.
With the rapid development in computer technologies, mathematical programming-based technique to solve scheduling problems is significantly receiving attention from researchers. Although, it is not efficient solution method due to the NP-hard structure of these problems, mathematical programming formulation is the first step to develop an effective heuristic. Numerous comparative studies for variety scheduling problems have appeared over the years. But in our search in literature there is not an entirely review for mathematical formulations of flexible job shop scheduling problems (FJSP). In this paper, four the most widely used formulations of the FJSP are compiled from literature and a time-indexed model for FJSP is proposed. These formulations are evaluated under three categories that are distinguished by the type of binary variable that they rely on for using of sequencing operations on machines. All five formulations compared and results are presented.  相似文献   

7.
Several production environments require simultaneous planing of sizing and scheduling of sequences of production lots. Integration of sequencing decisions in lotsizing and scheduling problems has received an increased attention from the research community due to its inherent applicability to real world problems. A two-dimensional classification framework is proposed to survey and classify the main modeling approaches to integrate sequencing decisions in discrete time lotsizing and scheduling models. The Asymmetric Traveling Salesman Problem can be an important source of ideas to develop more efficient models and methods to this problem. Following this research line, we also present a new formulation for the problem using commodity flow based subtour elimination constraints. Computational experiments are conducted to assess the performance of the various models, in terms of running times and upper bounds, when solving real-word size instances.  相似文献   

8.
This paper deals with the job-shop scheduling problem with sequence-dependent setup times. We propose a new method to solve the makespan minimization problem to optimality. The method is based on iterative solving via branch and bound decisional versions of the problem. At each node of the branch and bound tree, constraint propagation algorithms adapted to setup times are performed for domain filtering and feasibility check. Relaxations based on the traveling salesman problem with time windows are also solved to perform additional pruning. The traveling salesman problem is formulated as an elementary shortest path problem with resource constraints and solved through dynamic programming. This method allows to close previously unsolved benchmark instances of the literature and also provides new lower and upper bounds.  相似文献   

9.
Multi-criteria routing and scheduling in a multimodal fixed scheduled network with time-dependent travel times involves the determination of the non-dominated itineraries (i.e., paths enhanced with scheduled departures) under the following constraints: (i) visiting a given set of intermediate stops in a specified sequence, and (ii) strict time windows on the origin, the destination and the intermediate stops. The objective of this paper is to present the formulation and algorithmic solution for the multi-criteria itinerary planning problem that takes into account the aforementioned features. The algorithmic approach proposed is based on the decomposition of the problem to a sequence of elementary itinerary sub-problems, solved by a dynamic programming algorithm. The computational performance of the algorithms on a set of large scale test problems indicates non-prohibitive time requirements and encourages its integration into travel planning decision support systems.  相似文献   

10.
A general problem in health-care consists in allocating some scarce medical resource, such as operating rooms or medical staff, to medical specialties in order to keep the queue of patients as short as possible. A major difficulty stems from the fact that such an allocation must be established several months in advance, and the exact number of patients for each specialty is an uncertain parameter. Another problem arises for cyclic schedules, where the allocation is defined over a short period, e.g. a week, and then repeated during the time horizon. However, the demand typically varies from week to week: even if we know in advance the exact demand for each week, the weekly schedule cannot be adapted accordingly. We model both the uncertain and the cyclic allocation problem as adjustable robust scheduling problems. We develop a row and column generation algorithm to solve this problem and show that it corresponds to the implementor/adversary algorithm for robust optimization recently introduced by Bienstock for portfolio selection. We apply our general model to compute master surgery schedules for a real-life instance from a large hospital in Oslo.  相似文献   

11.
In this paper, we explore a new branching strategy for branch-and-bound approaches based on column generation for the vehicle routing problems with time windows. This strategy involves branching on resource variables (time or capacity) rather than on network flow variables. We also examine criteria for selecting network nodes for branching. To test the effectiveness of the branching strategy, we conduct computational experiments on time window constrained vehicle routing problems where backhauling is permitted only after all the shipments to clients have been made. The branching method proved very effective. In cases where time was the more binding constraint, time-based branching succeeded in decreasing the number of nodes explored by two thirds and the total computation time by more than half when compared to flow-based branching. The computational results also show that the overall algorithm was successful in optimally solving problems with up to 100 customers. It produced an average cost decrease of almost 7% when backhauling was permitted as compared to the cost involved when the client and the distributor routes were distinct.  相似文献   

12.
The well known problems of set covering, set partitioning and set packing are defined and their interrelationship is considered. A natural generalisation called the extended set partitioning model is presented and the three standard models are shown to be special cases of this generalisation. In addition, the extended model includes another type of set problem which can be of greater use in certain applications. The model forms the basis of a computer assisted bus crew scheduling system developed by the authors. The system is in regular use by Dublin City Services in the Republic of Ireland. Finally, the equivalence between a special case of the set partitioning problem and the shortest route problem is considered and it is shown that this equivalence also applies to the extended model.  相似文献   

13.
Given a weighted graph G, in the minimum-cost-edge-selection problem (MCES), a minimum weighted set of edges is chosen subject to an upper bound on the diameter of graph G. Similarly, in the minimum-diameter-edge-selection problem (MDES), a set of edges is chosen to minimize the diameter subject to an upper bound on their total weight. These problems are shown to be equivalent and proven to be NP-complete. MCES is then formulated as a 0–1 integer programming problem. The problems MCES and MDES provide models for determining smallest-world networks and for measuring the “small-worldness” of graphs.  相似文献   

14.
We consider the problem of finding the optimal routing of a single vehicle that starts its route from a depot and picks up from and delivers K different products to N customers that are served according to a predefined customer sequence. The vehicle is allowed during its route to return to the depot to unload returned products and restock with new products. The items of all products are of the same size. For each customer the demands for the products that are delivered by the vehicle and the quantity of the products that is returned to the vehicle are discrete random variables with known joint distribution. Under a suitable cost structure, it is shown that the optimal policy that serves all customers has a specific threshold-type structure. We also study a corresponding infinite-time horizon problem in which the service of the customers is not completed when the last customer has been serviced but it continues indefinitely with the same customer order. For each customer, the joint distribution of the quantities that are delivered and the quantity that is picked up is the same at each cycle. The discounted-cost optimal policy and the average-cost optimal policy have the same structure as the optimal policy in the finite-horizon problem. Numerical results are given that illustrate the structural results.  相似文献   

15.
This article introduces a new exact algorithm for the capacitated vehicle routing problem with stochastic demands (CVRPSD). The CVRPSD can be formulated as a set partitioning problem and it is shown that the associated column generation subproblem can be solved using a dynamic programming scheme. Computational experiments show promising results.  相似文献   

16.
An MILP for scheduling problems in an FMS with one vehicle   总被引:1,自引:0,他引:1  
This paper concerns the mathematical formulation and optimal solutions for the Flexible Manufacturing Systems Scheduling Problem (FMSSP) with one vehicle. This linear formulation differs from the previously published ones as it takes into account the maximum number of jobs allowed in the system, limited input/output buffer capacities, empty vehicle trips and no-move-ahead trips simultaneously. Our objective is to propose optimal solutions for small and medium-sized instances and to examine a number of commonly used assumptions and heuristics. Computational experiments are carried out on instances adapted from Bilge and Ulusoy [Bilge, Ü., Ulusoy, G., 1995. A time window approach to simultaneous scheduling of machines and material handling system in an FMS. Operations Research 43, 1058–1070] and the following heuristics are evaluated: FIFO (First In First Out) rules for input/output buffer management; and FIFO, SPT (Shortest Processing Time), STT (Shortest Travel Time) and MOQS (Maximum Outgoing Queue Size) rules concerning the vehicle. The consequences of classical assumptions are also studied: ignoring empty trips, ignoring no-move-ahead constraints, and ignoring vehicle-disjunction constraints. The numerical experiments provide a set of optimal solutions and allow to evaluate the performances of heuristic search schemes.  相似文献   

17.
This paper considers the problem of determining operation and maintenance schedules for a containership equipped with various subsystems during its sailing according to a pre-determined navigation schedule. The operation schedule, which specifies working time of each subsystem, determines the due-date of each maintenance activity and the maintenance schedule specifies the actual start time of each maintenance activity. The main constraints are subsystem requirements, workforce availability, working time limitation, and inter-maintenance time. To represent the problem mathematically, a mixed integer programming model is developed. Then, due to the complexity of the problem, we suggest a heuristic algorithm that minimizes the sum of earliness and tardiness between the due-date and the actual start time for each maintenance activity. Computational experiments were done on various test instances and the results are reported. In particular, a case study was done on a real instance and a significant amount of improvement is reported over the experience based conventional method.  相似文献   

18.
We investigate a combined routing and scheduling problem for the maintenance of electricity networks. In electricity networks power lines must be regularly maintained to ensure a high quality of service. For safety reasons a power line must be physically disconnected from the network before maintenance work can be performed. After completing maintenance work the power line must be reconnected. Each maintenance job therefore consists of multiple tasks which must be performed at different locations in the network. The goal is to assign each task to a worker and to determine a schedule such that the downtimes of power lines and the travel effort of workers are minimized. For solving this problem, we combine a Large Neighborhood Search meta-heuristic with mathematical programming techniques. The method is evaluated on a large set of test instances which are derived from network data of a German electricity provider.  相似文献   

19.
Stochastic scheduling problems are considered by using discounted dynamic programming. Both, maximizing pure rewards and minimizing linear holding costs are treated in one common Markov decision problem. A sufficient condition for the optimality of the myopic policy for finite and infinite horizon is given. For the infinite horizon case we show the optimality of an index policy and give a sufficient condition for the index policy to be myopic. Moreover, the relation between the two sufficient conditions is discussed.  相似文献   

20.
Many practical optimal control problems include discrete decisions. These may be either time-independent parameters or time-dependent control functions as gears or valves that can only take discrete values at any given time. While great progress has been achieved in the solution of optimization problems involving integer variables, in particular mixed-integer linear programs, as well as in continuous optimal control problems, the combination of the two is yet an open field of research. We consider the question of lower bounds that can be obtained by a relaxation of the integer requirements. For general nonlinear mixed-integer programs such lower bounds typically suffer from a huge integer gap. We convexify (with respect to binary controls) and relax the original problem and prove that the optimal solution of this continuous control problem yields the best lower bound for the nonlinear integer problem. Building on this theoretical result we present a novel algorithm to solve mixed-integer optimal control problems, with a focus on discrete-valued control functions. Our algorithm is based on the direct multiple shooting method, an adaptive refinement of the underlying control discretization grid and tailored heuristic integer methods. Its applicability is shown by a challenging application, the energy optimal control of a subway train with discrete gears and velocity limits.   相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号