首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
A great deal of research has been done on production planning and sourcing problems, most of which concern deterministic or stochastic demand and cost situations and single period systems. In this paper, we consider a new class of multi-period production planning and sourcing problem with credibility service levels, in which a manufacturer has a number of plants and subcontractors and has to meet the product demand according to the credibility service levels set by its customers. In the proposed problem, demands and costs are uncertain and assumed to be fuzzy variables with known possibility distributions. The objective of the problem is to minimize the total expected cost, including the expected value of the sum of the inventory holding and production cost in the planning horizon. Because the proposed problem is too complex to apply conventional optimization algorithms, we suggest an approximation approach (AA) to evaluate the objective function. After that, two algorithms are designed to solve the proposed production planning problem. The first is a PSO algorithm combining the AA, and the second is a hybrid PSO algorithm integrating the AA, neural network (NN) and PSO. Finally, one numerical example is provided to compare the effectiveness of the proposed two algorithms.  相似文献   

2.
This study addresses an interactive multiple fuzzy goal programming (FGP) approach to the multi-period multi-product (MPMP) production planning problem in an imprecise environment. The proposed model attempts to simultaneously minimize total production costs, rates of changes in labor levels, and maximizing machine utilization, while considering individual production routes of parts, inventory levels, labor levels, machine capacity, warehouse space, and the time value of money. Piecewise linear membership functions are utilized to represent decision maker’s (DM’s) overall satisfaction levels. A numerical example demonstrates the feasibility of applying the proposed model to the MPMP problem. Furthermore, the proposed interactive approach facilitates the DM with a systematic framework of decision making process which enables DM to modify the search direction to reach the most satisfactory results during solving process.  相似文献   

3.
This work develops a novel two-stage fuzzy optimization method for solving the multi-product multi-period (MPMP) production planning problem, in which the market demands and some of the inventory costs are assumed to be uncertainty and characterized by fuzzy variables with known possibility distributions. Some basic properties about the MPMP production planning problem are discussed. Since the fuzzy market demands and inventory costs usually have infinite supports, the proposed two-stage fuzzy MPMP production planning problem is an infinite-dimensional optimization problem that cannot be solved directly by conventional numerical solution methods. To overcome this difficulty, this paper adopts an approximation method (AM) to turn the original two-stage fuzzy MPMP production planning problem into a finite-dimensional optimization problem. The convergence about the AM is discussed to ensure the solution quality. After that, we design a heuristic algorithm, which combines the AM and simulated annealing (SA) algorithm, to solve the proposed two-stage fuzzy MPMP production planning problem. Finally, one real case study about a furniture manufacturing company is presented to illustrate the effectiveness and feasibility of the proposed modeling idea and designed algorithm.  相似文献   

4.
Portfolio selection theory with fuzzy returns has been well developed and widely applied. Within the framework of credibility theory, several fuzzy portfolio selection models have been proposed such as mean–variance model, entropy optimization model, chance constrained programming model and so on. In order to solve these nonlinear optimization models, a hybrid intelligent algorithm is designed by integrating simulated annealing algorithm, neural network and fuzzy simulation techniques, where the neural network is used to approximate the expected value and variance for fuzzy returns and the fuzzy simulation is used to generate the training data for neural network. Since these models are used to be solved by genetic algorithm, some comparisons between the hybrid intelligent algorithm and genetic algorithm are given in terms of numerical examples, which imply that the hybrid intelligent algorithm is robust and more effective. In particular, it reduces the running time significantly for large size problems.  相似文献   

5.
In this paper we present a new Discrete Particle Swarm Optimization (DPSO) approach to face the NP-hard single machine total weighted tardiness scheduling problem in presence of sequence-dependent setup times. Differently from previous approaches the proposed DPSO uses a discrete model both for particle position and velocity and a coherent sequence metric. We tested the proposed DPSO mainly over a benchmark originally proposed by Cicirello in 2003 and available online. The results obtained show the competitiveness of our DPSO, which is able to outperform the best known results for the benchmark. In addition, we also tested the DPSO on a set of benchmark instances from ORLIB for the single machine total weighted tardiness problem, and we analysed the role of the DPSO swarm intelligence mechanisms as well as the local search intensification phase included in the algorithm.  相似文献   

6.
Supplier selection problem, considered as a multi-criteria decision-making (MCDM) problem, is one of the most important issues for firms. Lots of literatures about it have been emitted since 1960s. However, research on supplier selection under operational risks is limited. What’s more, the criteria used by most of them are independent, which usually does not correspond with the real world. Although the analytic network process (ANP) has been proposed to deal with the problems above, several problems make the method impractical. This study first integrates the fuzzy cognitive map (FCM) and fuzzy soft set model for solving the supplier selection problem. This method not only considers the dependent and feedback effect among criteria, but also considers the uncertainties on decision making process. Finally, a case study of supplier selection considering risk factors is given to demonstrate the proposed method’s effectiveness.  相似文献   

7.
Multi-level production planning problems in which multiple items compete for the same resources frequently occur in practice, yet remain daunting in their difficulty to solve. In this paper, we propose a heuristic framework that can generate high quality feasible solutions quickly for various kinds of lot-sizing problems. In addition, unlike many other heuristics, it generates high quality lower bounds using strong formulations, and its simple scheme allows it to be easily implemented in the Xpress-Mosel modeling language. Extensive computational results from widely used test sets that include a variety of problems demonstrate the efficiency of the heuristic, particularly for challenging problems.  相似文献   

8.
We are given a set of items that must be produced in lots on a capacitated production system throughout a specified finite planning horizon. We assume that the production system is subject to random failures, and that any maintenance action carried out on the system, in a period, reduces the system’s available production capacity during that period. The objective is to find an integrated lot-sizing and preventive maintenance strategy of the system that satisfies the demand for all items over the entire horizon without backlogging, and which minimizes the expected sum of production and maintenance costs. We show how this problem can be formulated and solved as a multi-item capacitated lot-sizing problem on a system that is periodically renewed and minimally repaired at failure. We also provide an illustrative example that shows the steps to obtain an optimal integrated production and maintenance strategy.  相似文献   

9.
Production planning (PP) is one of the most important issues carried out in manufacturing environments which seeks efficient planning, scheduling and coordination of all production activities that optimizes the company’s objectives. In this paper, we studied a two-stage real world capacitated production system with lead time and setup decisions in which some parameters such as production costs and customer demand are uncertain. A robust optimization model is developed to formulate the problem in which minimization of the total costs including the setup costs, production costs, labor costs, inventory costs, and workforce changing costs is considered as performance measure. The robust approach is used to reduce the effects of fluctuations of the uncertain parameters with regards to all the possible future scenarios. A mixed-integer programming (MIP) model is developed to formulate the related robust production planning problem. In fact the robust proposed model is presented to generate an initial robust schedule. The performance of this schedule could be improved against of any possible occurrences of uncertain parameters. A case from an Iran refrigerator factory is studied and the characteristics of factory and its products are discussed. The computational results display the robustness and effectiveness of the model and highlight the importance of using robust optimization approach in generating more robust production plans in the uncertain environments. The tradeoff between solution robustness and model robustness is also analyzed.  相似文献   

10.
Production planning in manufacturing industries is concerned with the determination of the production quantities (lot sizes) of some items over a time horizon, in order to satisfy the demand with minimum cost, subject to some production constraints. In general, production planning problems become harder when different types of constraints are present, such as capacity constraints, minimum lot sizes, changeover times, among others. Models incorporating some of these constraints yield, in general, NP-hard problems. We consider a single-machine, multi-item lot-sizing problem, with those difficult characteristics. There is a natural mixed integer programming formulation for this problem. However, the bounds given by linear relaxation are in general weak, so solving this problem by LP based branch and bound is inefficient. In order to improve the LP bounds, we strengthen the formulation by adding cutting planes. Several families of valid inequalities for the set of feasible solutions are derived, and the corresponding separation problems are addressed. The result is a branch and cut algorithm, which is able to solve some real life instances with 5 items and up to 36 periods. This revised version was published online in June 2006 with corrections to the Cover Date.  相似文献   

11.
The particle swarm optimization (PSO) technique is a powerful stochastic evolutionary algorithm that can be used to find the global optimum solution in a complex search space. This paper presents a variation on the standard PSO algorithm called the rank based particle swarm optimizer, or PSOrank, employing cooperative behavior of the particles to significantly improve the performance of the original algorithm. In this method, in order to efficiently control the local search and convergence to global optimum solution, the γ best particles are taken to contribute to the updating of the position of a candidate particle. The contribution of each particle is proportional to its strength. The strength is a function of three parameters: strivness, immediacy and number of contributed particles. All particles are sorted according to their fitness values, and only the γ best particles will be selected. The value of γ decreases linearly as the iteration increases. A time-varying inertia weight decreasing non-linearly is introduced to improve the performance. PSOrank is tested on a commonly used set of optimization problems and is compared to other variants of the PSO algorithm presented in the literature. As a real application, PSOrank is used for neural network training. The PSOrank strategy outperformed all the methods considered in this investigation for most of the functions. Experimental results show the suitability of the proposed algorithm in terms of effectiveness and robustness.  相似文献   

12.
This paper defines a set of material compatibility constraints for use in order promising mixed integer programs. The constraints always represent a necessary condition for compatibility and, in certain cases, are both necessary and sufficient. The underlying analysis represents incompatibilities using bipartite graphs and applies results from the perfectly matchable subgraph polytope.  相似文献   

13.
This paper addresses the multi-site production planning problem for a multinational lingerie company in Hong Kong subject to production import/export quotas imposed by regulatory requirements of different nations, the use of manufacturing factories/locations with regard to customers’ preferences, as well as production capacity, workforce level, storage space and resource conditions at the factories. In this paper, a robust optimization model is developed to solve multi-site production planning problem with uncertainty data, in which the total costs consisting of production cost, labor cost, inventory cost, and workforce changing cost are minimized. By adjusting penalty parameters, production management can determine an optimal medium-term production strategy including the production loading plan and workforce level while considering different economic growth scenarios. The robustness and effectiveness of the developed model are demonstrated by numerical results. The trade-off between solution robustness and model robustness is also analyzed.  相似文献   

14.
15.
This work presents an optimization model to support decisions in the aggregate production planning of sugar and ethanol milling companies. The mixed integer programming formulation proposed is based on industrial process selection and production lot-sizing models. The aim is to help the decision makers in selecting the industrial processes used to produce sugar, ethanol and molasses, as well as in determining the quantities of sugarcane crushed, the selection of sugarcane suppliers and sugarcane transport suppliers, and the final product inventory strategy. The planning horizon is the whole sugarcane harvesting season and decisions are taken on a discrete fraction of time. A case study was developed in a Brazilian mill and the results highlight the applicability of the proposed approach.  相似文献   

16.
Planning horizon is a key issue in production planning. Different from previous approaches based on Markov Decision Processes, we study the planning horizon of capacity planning problems within the framework of stochastic programming. We first consider an infinite horizon stochastic capacity planning model involving a single resource, linear cost structure, and discrete distributions for general stochastic cost and demand data (non-Markovian and non-stationary). We give sufficient conditions for the existence of an optimal solution. Furthermore, we study the monotonicity property of the finite horizon approximation of the original problem. We show that, the optimal objective value and solution of the finite horizon approximation problem will converge to the optimal objective value and solution of the infinite horizon problem, when the time horizon goes to infinity. These convergence results, together with the integrality of decision variables, imply the existence of a planning horizon. We also develop a useful formula to calculate an upper bound on the planning horizon. Then by decomposition, we show the existence of a planning horizon for a class of very general stochastic capacity planning problems, which have complicated decision structure.  相似文献   

17.
The periodic vehicle routing problem (PVRP) consists in establishing a planning of visits to clients over a given time horizon so as to satisfy some service level while optimizing the routes used in each time period. The tactical planning model considered here restricts its attention to scheduling visits and assigning them to vehicles while leaving sequencing decisions for an underlying operational model. The objective is twofold: to optimize regional compactness of the routes in a desire to specialize routes to restricted geographical area and to balance the workload evenly between vehicles. Approximate solutions are constructed using a truncated column generation procedure followed by a rounding heuristic. This mathematical programming based procedure can deal with problems with 50–80 customers over five working days which is the range of size of most PVRP instances treated in the literature with meta-heuristics. The paper highlights the importance of alternative optimization criteria not accounted for in standard operational models and provides insights on the implementation of a column generation based rounding heuristic.  相似文献   

18.
This paper proposes a satisfying optimization method based on goal programming for fuzzy multiple objective optimization problem. The aim of this presented approach is to make the more important objective achieving the higher desirable satisfying degree. For different fuzzy relations and fuzzy importance, the reformulated optimization models based on goal programming is proposed. Not only the satisfying results of all the objectives can be acquired, but also the fuzzy importance requirement can be simultaneously actualized. The balance between optimization and relative importance is realized. We demonstrate the efficiency, flexibility and sensitivity of the proposed method by numerical examples.  相似文献   

19.
This paper addresses a multi-period, multi-product sawmill production planning problem where the yields of processes are random variables due to non-homogeneous quality of raw materials (logs). In order to determine the production plans with robust customer service level, robust optimization approach is applied. Two robust optimization models with different variability measures are proposed, which can be selected based on the tradeoff between the expected backorder/inventory cost and the decision maker risk aversion level about the variability of customer service level. The implementation results of the proposed approach for a realistic-scale sawmill example highlights the significance of using robust optimization in generating more robust production plans in the uncertain environments compared with stochastic programming.  相似文献   

20.
The aim of this paper is to formulate a model that integrates production planning and order acceptance decisions while taking into account demand uncertainty and capturing the effects of congestion. Orders/customers are classified into classes based on their marginal revenue and their level of variability in order quantity (demand variance). The proposed integrated model provides the flexibility to decide on the fraction of demand to be satisfied from each customer class, giving the planner the choice of selecting among the highly profitable yet risky orders or less profitable but possibly more stable orders. Furthermore, when the production stage exceeds a critical utilization level, it suffers the consequences of congestion via elongated lead-times which results in backorders and erodes the firm’s revenue. Through order acceptance decisions, the planner can maintain a reasonable level of utilization and hence avoid increasing delays in production lead times. A robust optimization (RO) approach is adapted to model demand uncertainty and non-linear clearing functions characterize the relationship between throughput and workload to reflect the effects of congestion on production lead times. Illustrative simulation and numerical experiments show characteristics of the integrated model, the effects of congestion and variability, and the value of integrating production planning and order acceptance decisions.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号