首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 62 毫秒
1.
This paper focuses on the scheduling problem of minimizing makespan for a given set of jobs in a two-stage hybrid flowshop subject to a product-mix ratio constraint. There are identical parallel machines at the first stage of the hybrid flowshop, while there is a single batch-processing machine at the second stage. Ready times of the jobs (at the first stage) may be different, and a given product-mix ratio of job types should be kept in each batch at the second stage. We present three types of heuristic algorithms: forward scheduling algorithms, backward scheduling algorithms, and iterative algorithms. To evaluate performance of the suggested algorithms, a series of computational experiments are performed on randomly generated test problems and results are reported.  相似文献   

2.
This paper considers a two-machine multi-family scheduling problem with reentrant production flows. The problem consists of two machines, M1 and M2, and each job has the processing route (M1, M2, M1, M2). There are identical jobs in the same family and the jobs in the same family are processed in succession. Each machine needs a setup time before the first job in a family is processed. The objective is to minimize the maximum completion time. Examples of such a problem occur in the bridge construction, semiconductor industry and job processing on numerical controlled machines, where they usually require that the jobs are reprocessed once and there are identical jobs in the same family. This problem is shown to be NP-hard. A branch-and-bound algorithm is proposed, and computational experiments are provided.  相似文献   

3.
井彩霞  张磊  刘烨 《运筹与管理》2014,23(4):133-138
考虑需要安装时间的平行多功能机排序问题。在该模型中,每个工件对应机器集合的一个子集,其只能在这个子集中的任一台机器上加工,称这个子集为该工件的加工集合;工件分组,同组工件具有相同的加工时间和加工集合,不同组中的工件在同一台机器上连续加工需要安装时间,目标函数为极小化最大完工时间。对该问题NP-难的一般情况设计启发式算法:首先按照特定的规则将所有工件组都整组地安排到各台机器上,然后通过在各机器间转移工件不断改进当前最大完工时间。通过与下界的比较检验算法的性能,大量的计算实验表明,算法是实用而有效的。  相似文献   

4.
This paper proposes to investigate learning and forgetting effects on the problem of scheduling families of jobs on a single machine to minimize total completion time of jobs. A setup time is incurred whenever the single machine transfers job processing from a family to another family. To analyze the impact of learning and forgetting on this group scheduling problem, we structure three basic models and make some comparisons through computational experiments. The three models, including no forgetting, total forgetting and partial forgetting, assume that the processing time of a job is dependent on its position in a schedule. Some scheduling rules and a lower bound are derived in order to constitute our branch-and-bound algorithm for searching an optimal sequence. In addition, an efficient and simply-structured heuristic is also built to find a near-optimal schedule.  相似文献   

5.
提出需要安装时间的多功能机排序问题,一般情况下,这是NP-困难的;主要研究只有两台机器时一些特殊情况下的计算复杂性.根据加工集合为机器全集的工件组数的不同,分别给出多项式时间算法和分枝定界算法.对各工件组的工件数和加工时间都相等的情况,给出一个多项式时间的最优算法-奇偶算法,从而证明此问题是多项式时间可解的.  相似文献   

6.
本文考虑了多个客户订购不同种类的工件,工件生产完后需要运输到客户的单机供应链排序问题.由于工件属于不同的种类,在加工不同种类工件前要有一个准备时间.每个客户分布在不同位置,客户的每个工件都有一个交货期,工件是分批配送的,每一批配送需要花费一定的时间及费用.考虑了两个与交货期有关的目标函数,分别给出了它们的最优算法.  相似文献   

7.
We investigate the problems of scheduling n weighted jobs to m parallel machines with availability constraints. We consider two different models of availability constraints: the preventive model, in which the unavailability is due to preventive machine maintenance, and the fixed job model, in which the unavailability is due to a priori assignment of some of the n jobs to certain machines at certain times. Both models have applications such as turnaround scheduling or overlay computing. In both models, the objective is to minimize the total weighted completion time. We assume that m is a constant, and that the jobs are non-resumable.For the preventive model, it has been shown that there is no approximation algorithm if all machines have unavailable intervals even if wi=pi for all jobs. In this paper, we assume that there is one machine that is permanently available and that the processing time of each job is equal to its weight for all jobs. We develop the first polynomial-time approximation scheme (PTAS) when there is a constant number of unavailable intervals. One main feature of our algorithm is that the classification of large and small jobs is with respect to each individual interval, and thus not fixed. This classification allows us (1) to enumerate the assignments of large jobs efficiently; and (2) to move small jobs around without increasing the objective value too much, and thus derive our PTAS. Next, we show that there is no fully polynomial-time approximation scheme (FPTAS) in this case unless P=NP.For the fixed job model, it has been shown that if job weights are arbitrary then there is no constant approximation for a single machine with 2 fixed jobs or for two machines with one fixed job on each machine, unless P=NP. In this paper, we assume that the weight of a job is the same as its processing time for all jobs. We show that the PTAS for the preventive model can be extended to solve this problem when the number of fixed jobs and the number of machines are both constants.  相似文献   

8.
We consider parallel machine scheduling problems where the processing of the jobs on the machines involves two types of objectives. The first type is one of two classical objective functions in scheduling theory: either the total completion time or the makespan. The second type involves an actual cost associated with the processing of a specific job on a given machine; each job-machine combination may have a different cost. Two bi-criteria scheduling problems are considered: (1) minimize the maximum machine cost subject to the total completion time being at its minimum, and (2) minimize the total machine cost subject to the makespan being at its minimum. Since both problems are strongly NP-hard, we propose fast heuristics and establish their worst-case performance bounds.  相似文献   

9.
In this paper, we consider a parallel machine scheduling problem to minimize the total completion time. Each job belongs to a certain family. All jobs of one family have identical processing times. Major setups occur between jobs of different families, and we include sequence dependencies. Batches of jobs belonging to the same family can be formed to avoid these setups. Furthermore, we assume serial batching and batch availability. Therefore, the processing time of a batch is the sum of the processing times of all jobs grouped into the corresponding batch. An iterative method is developed for solving this specific problem. This approach alternates between varying batch sizes using an efficient heuristic and sequencing batches based on variable neighborhood search (VNS). Computational results demonstrate that the iterative heuristic outperforms heuristics based on a fixed batch size and list scheduling.  相似文献   

10.
We consider the problem of scheduling a set of jobs with different release times on parallel machines so as to minimize the makespan of the schedule. The machines have the same processing speed, but each job is compatible with only a subset of those machines. The machines can be linearly ordered such that a higher-indexed machine can process all those jobs that a lower-indexed machine can process. We present an efficient algorithm for this problem with a worst-case performance ratio of 2. We also develop a polynomial time approximation scheme (PTAS) for the problem, as well as a fully polynomial time approximation scheme (FPTAS) for the case in which the number of machines is fixed.  相似文献   

11.
Flowshop scheduling deals with processing a set of jobs through a set of machines, where all jobs have to pass among machines in the same order. With the exception of minimizing a makespan on two machines, almost all other flowshop problems in a general setup are known to be computationally intractable. In this paper we study special cases of flowshop defined by additional machine dominance constraints. These constraints impose certain relations among the job processing times on different machines and make the studied problems tractable.  相似文献   

12.
研究了带服务等级约束的三台平行机在线排序问题.每台机器和每个工件的服务等级为1或者2,工件只能在等级不高于它的机器上加工,即等级为1的工件只能在等级为1的机器上加工,等级为2的工件可在所有机器上加工.每个工件的加工时间为一个单位,目标是极小化所有工件的总完工时间.考虑两种情形:当一台机器等级为1,两台机器等级为2时,给出了竞争比为17/14的最优在线算法;当两台机器等级为1,一台机器等级为2时,给出了竞争比为43/36的最优在线算法.  相似文献   

13.
研究具有两个不相容工件族单位工件单机有界平行分批的在线排序问题.工件按时在线到达,目标是最小化最大完工时间.在有界平行分批排序中,容量有限制机器最多可将b个工件形成一批同时加工,每个工件及每一批的加工时间为1.不相容工件族是指来自不同工件组的工件不能放在同一批加工.对该问题提供了一个竞争比为√17+3/4的最好可能的在线算法.  相似文献   

14.
This paper investigates single-batch and batch-single flow shop scheduling problem taking transportation among machines into account. Both transportation capacity and transportation times are explicitly considered. While the single processing machine processes one job at a time, the batch processing machine processes a batch of jobs simultaneously. The batch processing time is the longest processing times of jobs assigned to that batch.Each problem is formulated as a mixed integer programming model to find optimal makespan. Lower bounds and heuristic algorithms are proposed and computational experiments are carried out to verify their effectiveness.  相似文献   

15.
研究了带有拒绝的单机和同型机排序问题. 对于单机情形, 工件的惩罚费用是对应加工时间的\alpha倍.如果工件有到达时间, 目标为最小化时间表长与惩罚费用之和, 证明了这个问题是可解的.如果所有工件在零时刻到达, 目标为最小化总完工时间与惩罚费用之和, 也证明了该问题是可解的.对于同型机排序问题, 研究了工件分两批在线实时到达的情形, 目标为最小化时间表长与惩罚费用之和.针对机器台数2和m, 分别给出了竞争比为2和4-2/m的在线算法.  相似文献   

16.
We consider scheduling of a deteriorating flexible machine that is capable of processing a number of diverse jobs with negligible setup times between jobs. Specifically, we develop rules for sequencing N jobs on such a machine such that its expected makespan (sum of all job processing times and machine down-time) is minimized. Using the Weibull distribution to characterize machine failures in our model, we permit different jobs to contribute to machine deterioration (and hence its failure) at different failure rates, and do not require these rates to remain constant with machine-use time. We validate the effectiveness of these job sequencing rules for different cases, using extensive simulation tests.  相似文献   

17.
可拆分平行机排序问题研究   总被引:2,自引:0,他引:2  
平行机排序问题是把n个产品安排到m台机器上加工,使其总费用最小.通常的平行机排序问题都假设(C1):任何产品不能在不同机器上同时加工.但是,如果把产品的加工时间看成一个产品量的需求,就可以假设(C2):允许同一产品拆分在不同机器上同时加工.本文首先回顾了C1假设下平行机排序问题已有的结果,然后基于假设C2,讨论了各种费用目标下问题的算法及其复杂性.在没有生产准备时间的情况下,给出了一些问题的多项式算法和线性规划方法.在有独立生产准备时间的情况下,给出了P/split/Cmax问题的启发式算法及其算法分析.  相似文献   

18.
本文考虑下述由多工类工件组成的订单的单机排序问题:每一个客户提供一个由若干工件组成的订单,总共n个工件又分成k个类.当机器从加工某类中的工件转向加工不同于它的第i类工件时,需一调整时间si.每一订单有一给定的应交工时间,订单的完工时间定义为该定单所含全部工件完工时的时间.我们希望适当排列这n个工件,使得订单的迟后范围最小.相应这一排序问题,文中依不同的背景给出了以下二种模式:同类工件一起连续加工,工件的完工时间为其所属类中全部工件完工时的时间,用GT,Ba来表示;同类工件一起连续加工,工件的完工时间为其本身的完工时间,用GT,Ja来表示.对于这两种模式的排序同题,我们均证明了其NP-hard性并给出了对应的分枝定界算法.  相似文献   

19.
Parallel machine scheduling is a popular research area due to its wide range of potential application areas. This paper focuses on the problem of scheduling n independent jobs to be processed on m identical parallel machines with the aim of minimizing the total tardiness of the jobs considering a job splitting property. It is assumed that a job can be split into sub-jobs and these sub-jobs can be processed independently on parallel machines. We present a mathematical model for this problem. The problem of total tardiness on identical parallel machines is NP-hard. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time by using an optimization solver is extremely difficult. We propose two meta-heuristics: Tabu search and simulated annealing. Computational results are compared on random generated problems with different sizes.  相似文献   

20.
研究具有前瞻区间的两个不相容工件组单位工件单机无界平行分批在线排序问题.工件按时在线到达, 目标是最小化最大完工时间. 在无界平行分批排序中, 一台容量无限制机器可将多个工件形成一批同时加工, 每一批的加工时间等于该批中最长工件的加工时间. 具有前瞻区间是指在时刻t, 在线算法能预见到时间区间(t,t+\beta]内到达的所有工件的信息.不可相容的工件组是指属于不同组的工件不能安排在同一批中加工.对该问题提供了一个竞争比为\ 1+\alpha 的最好可能的在线算法,其中\ \alpha 是方程2\alpha^{2}+(\beta +1)\alpha +\beta -2=0的一个正根, 这里0\leq \beta <1.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号