首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
When the processing times of jobs are controllable, selected processing times affect both the manufacturing cost and the scheduling performance. A well known example for such a case that this paper specifically deals with is the turning operation on a CNC machine. Manufacturing cost of a turning operation is a nonlinear convex function of its processing time. In this paper, we deal with making optimal machine-job assignments and processing time decisions so as to minimize total manufacturing cost while the makespan being upper bounded by a known value, denoted as ?-constraint approach for a bicriteria problem. We then give optimality properties for the resulting single criterion problem. We provide alternative methods to compute cost lower bounds for partial schedules, which are used in developing an exact (branch and bound) algorithm. For the cases where the exact algorithm is not efficient in terms of computation time, we present a recovering beam search algorithm equipped with an improvement search procedure. In order to find improving search directions, the improvement search algorithm uses the proposed cost bounding properties. Computational results show that our lower bounding methods in branch and bound algorithm achieve a significant reduction in the search tree size that we need to traverse. Also, our recovering beam search and improvement search heuristics achieve solutions within 1% of the optimum on the average while they spent much less computational effort than the exact algorithm.  相似文献   

2.
Complexity of a scheduling problem with controllable processing times   总被引:2,自引:0,他引:2  
We consider the problem of scheduling a set of independent jobs on a single machine so as to minimize the total weighted completion time, subject to the constraint that the total compression cost is less than or equal to a fixed amount. The complexity of this problem is mentioned as an open problem. In this note we show that the problem is NP-hard.  相似文献   

3.
4.
We extend the classical linear assignment problem to the case where the cost of assigning agent j to task i is a multiplication of task i’s cost parameter by a cost function of agent j. The cost function of agent j is a linear function of the amount of resource allocated to the agent. A solution for our assignment problem is defined by the assignment of agents to tasks and by a resource allocation to each agent. The quality of a solution is measured by two criteria. The first criterion is the total assignment cost and the second is the total weighted resource consumption. We address these criteria via four different problem variations. We prove that our assignment problem is NP-hard for three of the four variations, even if all the resource consumption weights are equal. However, and somewhat surprisingly, we find that the fourth variation is solvable in polynomial time. In addition, we find that our assignment problem is equivalent to a large set of important scheduling problems whose complexity has been an open question until now, for three of the four variations.  相似文献   

5.
In this paper, we consider single machine scheduling problem in which job processing times are controllable variables with linear costs. We concentrate on two goals separately, namely, minimizing a cost function containing total completion time, total absolute differences in completion times and total compression cost; minimizing a cost function containing total waiting time, total absolute differences in waiting times and total compression cost. The problem is modelled as an assignment problem, and thus can be solved with the well-known algorithms. For the case where all the jobs have a common difference between normal and crash processing time and an equal unit compression penalty, we present an O(n log n) algorithm to obtain the optimal solution.  相似文献   

6.
In this paper, we study the identical parallel machine scheduling problem with a planned maintenance period on each machine to minimize the sum of completion times. This paper is a first approach for this problem. We propose three exact methods to solve the problem at hand: mixed integer linear programming methods, a dynamic programming based method and a branch-and-bound method. Several constructive heuristics are proposed. A lower bound, dominance properties and two branching schemes for the branch-and-bound method are presented. Experimental results show that the methods can give satisfactory solutions.  相似文献   

7.
Baker and Nuttle [K.R. Baker, H.L.W. Nuttle, Sequencing independent jobs with a single resource, Naval Research Logistics Quarterly 27 (1980) 499–510] studied the following single-variable-resource scheduling problem: sequencing n jobs for processing by a single resource to minimize a function of job completion times, when the availability of the resource varies over time. When the objective function to be minimized is the total weighted completion time, Baker and Nuttle conjectured that the problem is NP-hard. We show in this note that the conjecture is true.  相似文献   

8.
In this paper, we consider the problem of minimizing the total weighted completion time on a single machine. Jobs processing times are increasing linear function of start times. First, we present some new dominance properties for this NP-hard problem. And next, using these properties, we develop a memetic algorithm for the problem. The results of computational experiments show the good performance of the proposed algorithm.  相似文献   

9.
We consider the classical two-machine flow-shop scheduling for minimizing the total weighted completion time. For this problem, the computational complexity of a version in which the jobs have a common processing time on the second machine, has not been addressed. We show that the problem is unary NP-hard, answering an open problem posed in Zhu et al. (2016). Then we present an approximation algorithm for the problem with worst-case performance ratio at most 2.  相似文献   

10.
We investigate the problems of scheduling n weighted jobs to m parallel machines with availability constraints. We consider two different models of availability constraints: the preventive model, in which the unavailability is due to preventive machine maintenance, and the fixed job model, in which the unavailability is due to a priori assignment of some of the n jobs to certain machines at certain times. Both models have applications such as turnaround scheduling or overlay computing. In both models, the objective is to minimize the total weighted completion time. We assume that m is a constant, and that the jobs are non-resumable.For the preventive model, it has been shown that there is no approximation algorithm if all machines have unavailable intervals even if wi=pi for all jobs. In this paper, we assume that there is one machine that is permanently available and that the processing time of each job is equal to its weight for all jobs. We develop the first polynomial-time approximation scheme (PTAS) when there is a constant number of unavailable intervals. One main feature of our algorithm is that the classification of large and small jobs is with respect to each individual interval, and thus not fixed. This classification allows us (1) to enumerate the assignments of large jobs efficiently; and (2) to move small jobs around without increasing the objective value too much, and thus derive our PTAS. Next, we show that there is no fully polynomial-time approximation scheme (FPTAS) in this case unless P=NP.For the fixed job model, it has been shown that if job weights are arbitrary then there is no constant approximation for a single machine with 2 fixed jobs or for two machines with one fixed job on each machine, unless P=NP. In this paper, we assume that the weight of a job is the same as its processing time for all jobs. We show that the PTAS for the preventive model can be extended to solve this problem when the number of fixed jobs and the number of machines are both constants.  相似文献   

11.
12.
We consider the problem of scheduling products with components on a single machine, where changeovers incur fixed costs. The objective is to minimize the weighted sum of total flow time and changeover cost. We provide properties of optimal solutions and develop an explicit characterization of optimal sequences, while showing that this characterization has recurrent properties. Our structural results have interesting implications for practitioners, primarily that the structure of optimal sequences is robust to changes in demand.  相似文献   

13.
We consider parallel machine scheduling problems where the processing of the jobs on the machines involves two types of objectives. The first type is one of two classical objective functions in scheduling theory: either the total completion time or the makespan. The second type involves an actual cost associated with the processing of a specific job on a given machine; each job-machine combination may have a different cost. Two bi-criteria scheduling problems are considered: (1) minimize the maximum machine cost subject to the total completion time being at its minimum, and (2) minimize the total machine cost subject to the makespan being at its minimum. Since both problems are strongly NP-hard, we propose fast heuristics and establish their worst-case performance bounds.  相似文献   

14.
Consider m identical machines in parallel, each of which can produce k different product types. There is no setup cost when the machines switch from producing one product type to another. There are n orders each of which requests various quantities of the different product types. All orders are available for processing at time t = 0, and preemption is allowed. Order i has a weight wi and its completion time is the time when its last requested product type finishes. Our goal is to find a preemptive schedule such that the total weighted completion time ∑wiCiwiCi is minimized. We show that this problem is NP-hard even when all jobs have identical weights and there are only two machines. Motivated by the computational complexity of the problem, we propose a simple heuristic and show that it obeys a worst-case bound of 2 − 1/m. Finally, empirical studies show that our heuristic performs very well when compared with a lower bound of the optimal cost.  相似文献   

15.
In many situations, the skills of workers continuously improve when repeating the same or similar tasks. This phenomenon is known as the “learning effect” in the literature. In most studies, the learning phenomenon is implemented by assuming the actual job processing time is a function of its scheduled position [D. Biskup, Single-machine scheduling with learning considerations, Eur. J. Oper. Res. 115 (1999) 173–178]. Recently, a new model is proposed where the actual job processing time depends on the sum of the processing times of jobs already processed [C. Koulamas, G.J. Kyparisis, Single-machine and two-machine flowshop scheduling with general learning functions, Eur. J. Oper. Res. 178 (2007) 402–407]. In this paper, we extend their models in which the actual job processing time not only depends on its scheduled position, but also depends on the sum of the processing times of jobs already processed. We then show that the single-machine makespan and the total completion time problems remain polynomially solvable under the proposed model. In addition, we show that the total weighted completion time has a polynomial optimal solution under certain agreeable solutions.  相似文献   

16.
The single machine group scheduling problem is considered. Jobs are classified into several groups on the basis of group technology, i.e. jobs of the same group have to be processed jointly. A machine set-up time independent of the group sequence is needed between each two consecutive groups. A schedule specifies the sequence of groups and the sequence of jobs in each group. The quality of a schedule is measured by the criteriaF 1, ...,F m ordered by their relative importance. The objective is to minimize the least important criterionF m subject to the schedule being optimal with respect to the more important criterionF m–1 which is minimized on the set of schedules minimizing criterionF m–2 and so on. The most important criterion isF 1, which is minimized on the set of all feasible schedules. An approach to solve this multicriterion problem in polynomial time is presented if functionsF 1, ...,F m have special properties. The total weighted completion time and the total weighted exponential time are the examples of functionsF 1, ...,F m–1 and the maximum cost is an example of functionF m for which our approach can be applied.The research of the authors was partially supported by a KBN Grant No. 3 P 406 003 05, the Fundamental Research Fund of Belarus, Project N 60-242, and the Deutsche Forschungsgemeinschaft, Project Schema, respectively. The paper was completed while the first author was visiting the University of Melbourne.  相似文献   

17.
This paper investigates scheduling problems with simultaneous considerations of deterioration effects and deteriorating multi-maintenance activities on unrelated parallel machines. We examine two models of scheduling with the deterioration effect, namely the job-dependent and position-dependent deterioration model and the time-dependent deterioration model. We assume that each machine may be subject to several maintenance activities over the scheduling horizon, and the duration of maintenance on a machine depends on its running time. Moreover, due to the restriction of the budget of maintenance, the upper bound of the total maintenance frequencies on all the machines is assumed to be known in advance. The objective is to find jointly the optimal maintenance frequencies, the optimal maintenance positions, and the optimal job sequences such that the total completion time is minimized. If the number of machines is fixed, we introduce polynomial time solutions for all the versions of the problem under study.  相似文献   

18.
In this paper, we address a two-machine flow shop scheduling problem under simple linear deterioration. By a simple linear deterioration function, we mean that the processing time of a job is a simple linear function of its execution start time. The objective is to find a sequence that minimizes total weighted completion time. Optimal schedules are obtained for some special cases. For the general case, several dominance properties and two lower bounds are derived to speed up the elimination process of a branch-and-bound algorithm. A heuristic algorithm is also proposed to overcome the inefficiency of the branch-and-bound algorithm. Computational analysis on randomly generated problems is conducted to evaluate the branch-and-bound algorithm and heuristic algorithm.  相似文献   

19.
The two-machine flowshop environment with sequence-independent setup times has been intensely investigated both from theoretical and practical perspectives in the scheduling literature. Nevertheless, very scant attention has been devoted to deriving effective lower bounding strategies. In this paper, we propose new lower bounds for the total completion time minimization criterion. These bounds are based on three relaxation schemes, namely the waiting time-based relaxation scheme, the single machine-based relaxation scheme, and the Lagrangian relaxation scheme. Extensive computational study carried on instances with up to 500 jobs reveals that embedding the waiting time-based bounding strategy within the Lagrangian relaxation framework yields the best performance while requiring negligible CPU time.  相似文献   

20.
In many situations, the skills of workers continuously improve when repeating the same or similar tasks. This phenomenon is known as the “learning effect” in the literature. However, most studies considering the learning effect ignore the fact that production efficiency can be increased by grouping various parts and products with similar designs and/or production processes. This phenomenon is known as “group technology” in the literature. In this paper, we propose a new group scheduling learning model where the learning effect not only depends on the job position, but also depends on the group position. We then show that the makespan and the total completion time problems remain polynomially solvable under the proposed model.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号