首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到1条相似文献,搜索用时 0 毫秒
1.
This paper presents a Markov process model and an approximate decomposition technique for a discrete material transfer line with limited buffer capacity. A fraction of the parts processed at some stations in the line may be scrapped or reworked at dedicated machines to meet product quality requirements. Reworked parts are not sent back into the main line. This leads to splits in the flow of material. Processing times are deterministic and identical for all machines and are taken as the time unit. Machine specific times to failure and to repair are geometrically distributed. The model is analyzed through a decomposition into twomachine systems. We develop new decomposition equations for machines performing split operations. Production rates and inventory levels are computed and compared to simulation results. The results indicate that the method produces useful results for a variety of systems.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号