首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
Electron Cloud Instability has been studied in the operation of BEPC. The BEPCⅡ began the commissioning in November 2006 and the positron beam current has reached 500 mA. Because of such a high beam current, some instabilities such as ECI, bunch lengthening et al, have appeared during the operation. The experimental investigation on ECI during the commissioning of BEPCⅡ will be reported in this paper.  相似文献   

2.
王逗  秦庆  高杰 《中国物理 C》2010,34(11):1762-1767
In this paper,a dedicated synchrotron radiation (SR) mode for the BEPCⅡ with an emittance of 85 nm has been designed,including the linear lattice,chromaticity correction and dynamic aperture optimization.The emittance of the new mode is about 60% of the previous mode used for routine operation of the BEPCⅡ .The effect of wigglers on the linear lattice was compensated and the total dynamic aperture including the wigglers’ nonlinear effect was estimated.The preliminary commissioning at the end of 2008 and the formal operation with the new mode confirmed its merits.  相似文献   

3.
In this paper,a dedicated synchrotron radiation (SR) mode for the BEPCⅡ with an emittance of 85 nm has been designed,including the linear lattice,chromaticity correction and dynamic aperture optimization.The emittance of the new mode is about 60% of the previous mode used for routine operation of the BEPCⅡ .The effect of wigglers on the linear lattice was compensated and the total dynamic aperture including the wigglers’ nonlinear effect was estimated.The preliminary commissioning at the end of 2008 and the formal operation with the new mode confirmed its merits.  相似文献   

4.
A new special coupler with a kind of bowl-shaped ceramic window for a proton linear accelerator named the Chinese Accelerator Driven System (C-ADS) at the Institute of Modern Physics (IMP) has been simulated and constructed and a continuous wave (CW) beam commissioning through a four-meter long radio frequency quadruple (RFQ) was completed by the end of July 2014. In the experiments of conditioning and beam, some problems were promoted gradually such as sparking and thermal issues. Finally, two new couplers were passed with almost 110 kW CW power and 120 kW pulsed mode, respectively. The 10 mA intensity beam experiments have now been completed, and the couplers during the operation had no thermal or electro-magnetic problems. The detailed design and results are presented in the paper.  相似文献   

5.
The tuning system plays a very important role when a superconducting cavity is in operation. It cooperates with other control loops to adjust the cavity frequency with high precision, reduce the reflection power, guarantee the stability of beam, and ensure the safety of the superconducting cavity. This paper focuses mainly on the tuning system working principle, the working state and problems that Beijing Electron Positron Collider (BEPC ) has encountered during operation.  相似文献   

6.
BEPCⅡ is an electron-positron collider designed to run under multi-bunches and high beam current condition. The accelerator consists of an electron ring, a positron ring and a linear injector. In order to achieve the target luminosity and implement the equal bunch charge injection, the Bunch Current Monitor (BCM) system is built on BEPCⅡ. The BCM system consists of three parts: the front-end circuit, the bunch current acquisition system and the bucket selection system. The control software of BCM is based on VxWorks and EPICS. With the help of BCM system, the bunch current in each bucket can be monitored in the Central Control Room. The BEPCⅡ timing system can also use the bunch current database to decide which bucket needs to refill to implement ``top-off' njection.  相似文献   

7.
The charge stripping injection method has been adopted for the accumulation of light heavy ions in HIRFL-CSR. This method has some special requirements for the accelerating particles, and at the same time the structure of the injection orbit has to be changed. In this paper, the design of the orbit has been presented, as well as the calculation of the beam line matching. According to the result of commissioning, stripping injection can accumulate the beam to a higher current.  相似文献   

8.
The fast luminosity monitor counting the γ photons above a given energy threshold emitted from radiative Bhabha scattering has been operated in the BEPCⅡ to measure the relative luminosity bunch by bunch for the first time and used successfully in beam tuning of BEPCⅡ.In the relative mode the monitor is able to deliver the relative luminosities with an accuracy of 0.8 %.By steering the electron beam while observing the counting rate changes of the monitor the horizontal and vertical sizes of the bunch spots can be estimated as:sxe+ =sxe-=0.356 mm,sye+ =sye-=0.011 mm.  相似文献   

9.
A new generation electron cooler has started operation in the heavy ion synchrotron CSRm which is used to increase the intensity of heavy ions. Transverse cooling of the ion beam after horizontal multi-turn injection allows beam accumulation at the injection energy. After optimization of the accumulation process an intensity increase in a synchrotron pulse by more than one order of magnitude has been achieved. In given accumulation time interval of 10 seconds, 108 particles have been accumulated and accelerated to the final energy. The momentum spread after accumulation and acceleration in the 10-4 range has been demonstrated in six species of ion beams. Primary measurements of accumulation process varying with electron energy, electron beam current, electron beam profile, expansion factor and injection interval have been performed. The lifetimes of ion beams in the presence of electron beams were roughly measured with the help of DCCT signal.  相似文献   

10.
The fast luminosity monitor counting the γ photons above a given energy threshold emitted from radiative Bhabha scattering has been operated in the BEPC Ⅱ to measure the relative luminosity bunch by bunch for the first time and used successfully in beam tuning of BEPC Ⅱ. In the relative mode the monitor is able to deliver the relative luminosities with an accuracy of 0.8 %. By steering the electron beam while observing the counting rate changes of the monitor the horizontal and vertical sizes of the bunch spots can be estimated as: Sxe+ =Sxe =0.356 mm, Sye+ =Sye- =0.011 mm.  相似文献   

11.
BEPCⅡ, the upgrade project of Beijing Electron Positron Collider (BEPC), is an accelerator with large beam current and high luminosity, so an efficient and stable injector is required. Several beam diagnostic and monitoring instruments are used. A new diagnostic instrument — wire scanner, has been designed and will be used to measure the profile of the linac beam of BEPCⅡ. This paper describes the prototype of this system and the cause of heat generating of the wire. Some simulation results of the heat and force by using finite element method software—ANSYS®,2) are presented and discussed.  相似文献   

12.
There has recently been a dramatic renewal of interest in hadron spectroscopy and charm physics. This renaissance has been driven in part by the discovery of a plethora of charmonium-like XYZ states at BESⅢ and B factories, and the observation of an intriguing proton-antiproton threshold enhancement and the possibly related X(1835) meson state at BESⅢ, as well as the threshold measurements of charm mesons and charm baryons. We present a detailed survey of the important topics in tau-charm physics and hadron physics that can be further explored at BESⅢ during the remaining operation period of BEPCⅡ. This survey will help in the optimization of the data-taking plan over the coming years, and provides physics motivation for the possible upgrade of BEPCⅡ to higher luminosity.  相似文献   

13.
The target of the large negative ion source based on neutral beam injection (N-NBI) is to produce neutral beam current of 22 A and beam power of 10 MW at 500 keV with duration time of 10 s. Since it was successfully operated in 1996, the 5.3 MW neutral beam power at 380 keV with duration time of 3 s has been achieved. In recent years improving and enhancing the beam power are going on. Several reasons such as plasma non-uniformity, higher beam density at the upper region in the beam profile,  相似文献   

14.
Commissioning of electron cooling in CSRm   总被引:1,自引:0,他引:1  
A new generation electron cooler has started operation in the heavy ion synchrotron CSRm which is used to increase the intensity of heavy ions. Transverse cooling of the ion beam after horizontal multi-turn injection allows beam accumulation at the injection energy. After optimization of the accumulation process an intensity increase in a synchrotron pulse by more than one order of magnitude has been achieved. In given accumulation time interval of 10 seconds, 108 particles have been accumulated and accelerated to the final energy. The momentum spread after accumulation and acceleration in the 10-4 range has been demonstrated in six species of ion beams. Primary measurements of accumulation process varying with electron energy, electron beam current, electron beam profile, expansion factor and injection interval have been performed. The lifetimes of ion beams in the presence of electron beams were roughly measured with the help of DCCT signal.  相似文献   

15.
The energy recovery linac test facility(ERL-TF),a compact ERL-FEL(free electron laser)two-purpose machine,has been proposed at the Institute of High Energy Physics,Beijing.As one important component of the ERL-TF,the photo-injector was designed and preliminarily optimized.In this paper an evolutionary genetic method,non-dominated sorting genetic algorithmⅡ,is applied to optimize the injector beam dynamics,especially in the highcharge operation mode.Study shows that using an incident laser with rms transverse size of 1-1.2 mm,the normalized emittance of the electron beam can be kept below 1 mm·mrad at the end of the injector.This work,together with the previous optimization of the low-charge operation mode by using the iterative scan method,provides guidance and confidence for future construction and commissioning of the ERL-TF injector.  相似文献   

16.
The Penning surface plasma source is adopted as the China Spallation Neutron Source (CSNS) H- ion source. The designed energy and beam current of the source are 50 keV and 20 mA, respectively, with a normalized root mean square (norm. rms.) emittance of 0.2 πmm·mrad. The construction of a H- ion source test stand has been completed, and the commissioning of the source is in progress. Stable H- ion beams with energy of 50 keV and current up to 50 mA are attained. Emittance measurement for the H- beam is being prepared.  相似文献   

17.
Lower-hybrid current drive (LHCD) experiments were carried out in the HL-1M hydrogen plasmas.The suppression of sawtooth instabilities by LHCD has been observed in the sawtoothing discharges;an improvement in the global energy confinement time of up to 20% is observed.There is an optimal rf-power range for the complete suppression of the central MHD instabilities.Possible mechanisms for the stabilization of the sawtooth instability are discussed from the measurement of internal inductance and current profile reconstruction using an equilibrium code.A large long-lived snake-like oscillation is newly observed at the end of the sawtooth-stabilization phase of the LHCD operation in the HL-1M tokamak.It is evident that such perturbation is due to a temperature depression caused by impurity accumulation during LHCD.  相似文献   

18.
In the upgrade project of the Beijing Electron Positron Collider (BEPCⅡ), three superconducting magnets are employed to realize the goal of two orders of magnitude higher luminosity. A cryogenic system with a total capacity of 0.5~kW at 4.5~K was built at the Institute of High Energy Physics (IHEP) to support the operations of these superconducting devices. For preparing the commissioning of the system, the refrigeration process was simulated and analyzed numerically. The numerical model was based on the latest engineering progress and focused on the normal operation mode. The pressure and temperature profiles of the cryogenic system are achieved with the simulation. The influence of the helium mass flow rates to cool superconducting magnets on the thermodynamic parameters of their normal operation is also studied and discussed in this paper.  相似文献   

19.
The BEPC will increase its luminosity ten times with upgrade of both the machine and detector,which is the project BEPCII,The project will be started at beginning chine and detector,which is the project BEPCII.The project will be started at beginning of 2002 and finished within 3-4 years.In order to reach the goal of the BEPCII,a number of new equipment will be added in the system,such as the superconducting RF cavities,new magnet power supplies and beam feedback system,and the BEPC control system has to be upgraded.The BEPC control system was built in 1987 and was upgraded in 1994.It is an Open VMS and CAMAC based-system,some equipment is controlled by PCs.We are going to upgrade the existing system by EPICS.Several VME IOCs will be added in the system with feildbus,PLCs for the new equipment control.And we will keep the existing system in use,such as CAMAC hardware ,PC based sub-control and application programs,which will be merged into the EPICS system.Recently the development of the EPICS prototype has been started.Regard some slow control,commercial SCADA product can be chosen as the development tool.We have just finished a prototype with the SCADA product Wizcon.This paper will describe the system design and development issues.  相似文献   

20.
A three-dimensional finite element models for phase change random access memory (PCRAM) is established to simulate thermal and electrical behaviours during RESET operation. The RESET behaviours of the conventional structure (CS) and the ring-type contact in bottom electrode (RIB) are compared with each other. The simulation results indicate that the RIB cell has advantages of high heat efficiency for melting phase change material in cell, reduction of contact area and lower RESET current with maintaining good resistance contrast. The RESET current decreases from 1.26mA to 1.2mA and the heat consumption in CST material during programming increases from 12% to 37% in RIB structure. Thus the RIB structure PCRAM cell is suitable for future device with high heat efficiency and smaller RESET current.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号