We consider the single machine scheduling problem to minimize total completion time with fixed jobs, precedence constraints and release dates. There are some jobs that are already fixed in the schedule. The remaining jobs are free to be assigned to any free-time intervals on the machine in such a way that they do not overlap with the fixed jobs. Each free job has a release date, and the order of processing the free jobs is restricted by the given precedence constraints. The objective is to minimize the total completion time. This problem is strongly NP-hard. Approximability of this problem is studied in this paper. When the jobs are processed without preemption, we show that the problem has a linear-time n-approximation algorithm, but no pseudopolynomial-time (1 − δ)n-approximation algorithm exists even if all the release dates are zero, for any constant δ > 0, if P ≠ NP, where n is the number of jobs; for the case that the jobs have no precedence constraints and no release dates, we show that the problem has no pseudopolynomial-time (2 − δ)-approximation algorithm, for any constant δ > 0, if P ≠ NP, and for the weighted version, we show that the problem has no polynomial-time 2q(n)-approximation algorithm and no pseudopolynomial-time q(n)-approximation algorithm, where q(n) is any given polynomial of n. When preemption is allowed, we show that the problem with independent jobs can be solved in O(n log n) time with distinct release dates, but the weighted version is strongly NP-hard even with no release dates; the problems with weighted independent jobs or with jobs under precedence constraints are shown having polynomial-time n-approximation algorithms. We also establish the relationship of the approximability between the fixed job scheduling problem and the bin-packing problem.  相似文献   

2.
Problems of scheduling n jobs on a single machine to maximize regular objective functions are studied. Precedence constraints may be given on the set of jobs and the jobs may have different release times. Schedules of interest are only those for which the jobs cannot be shifted to start earlier without changing job sequence or violating release times or precedence constraints. Solutions to the maximization problems provide an information about how poorly such schedules can perform. The most general problem of maximizing maximum cost is shown to be reducible to n similar problems of scheduling n?1 jobs available at the same time. It is solved in O(mn+n 2) time, where m is the number of arcs in the precedence graph. When all release times are equal to zero, the problem of maximizing the total weighted completion time or the weighted number of late jobs is equivalent to its minimization counterpart with precedence constraints reversed with respect to the original ones. If there are no precedence constraints, the problem of maximizing arbitrary regular function reduces to n similar problems of scheduling n?1 jobs available at the same time.  相似文献   

3.
We consider the single machine, serial batching, total completion time scheduling problem with precedence constraints, release dates and identical processing times in this paper. The complexity of this problem is reported as open in the literature. We provide an O(n5) time algorithm to solve this problem.  相似文献   

4.
We consider a problem of scheduling n jobs on two uniform parallel machines. For each job we are given its release date when the job becomes available for processing. All jobs have equal processing requirements. Preemptions are allowed. The objective is to find a schedule minimizing total completion time. We suggest an O(n3) algorithm to solve this problem.  相似文献   

5.
We consider the problem of scheduling a set of dependent jobs on a single machine with the maximum completion time criterion. The processing time of each job is variable and decreases linearly with respect to the starting time of the job. Applying a uniform approach based on the calculation of ratios of expressions that describe total processing times of chains of jobs, we show basic properties of the problem. On the basis of these properties, we prove that if precedence constraints among jobs are in the form of a set of chains, a tree, a forest or a series–parallel digraph, the problem can be solved in O(n log n) time, where n denotes the number of the jobs.  相似文献   

6.
There are n jobs to be scheduled in a contaminated area. The jobs can be rescue, de-activation or cleaning works to be executed by a single worker in an area contaminated with radio-active or chemical materials. Precedence relations can be given on the set of jobs. An execution of each job can be preempted. However, the length of the minimal uninterrupted work period is given and it is the same for all jobs. Each work period for a job should be accompanied by a rest period whose length depends on the start time of the work period and its length. We focus on a short term planning problem. We show that this problem can be modelled by a scheduling problem with start time dependent job processing times. The dependency functions are exponentially decreasing ones. We also construct two polynomial time algorithms for the both cases—with and without precedence constraints.  相似文献   

7.
We consider the problem of scheduling a given set of n jobs with equal processing times on m parallel machines so as to minimize the makespan. Each job has a given release date and is compatible to only a subset of the machines. The machines are ordered and indexed in such a way that a higher-indexed machine can process all the jobs that a lower-indexed machine can process. We present a solution procedure to solve this problem in O(n2+mnlogn) time. We also extend our results to the tree-hierarchical processing sets case and the uniform machine case.  相似文献   

8.
Each of n jobs is to be processed without interruption on a single machine which can handle only one job at a time. Each job becomes available for processing at its release date, requires a processing time and has a positive weight. Given a processing order of the jobs, the earliest completion time for each job can be computed. The objective is to find a processing order of the jobs which minimizes the sum of weighted completion times. In this paper a branch and bound algorithm for the problem is derived. Firstly a heuristic is presented which is used in calculating the lower bound. Then the lower bound is obtained by performing a Lagrangean relaxation of the release date constraints; the Lagrange multipliers are chosen so that the sequence generated by the heuristic is an optimum solution of the relaxed problem thus yielding a lower bound. A method to increase the lower bound by deriving improved constraints to replace the original release date constraints is given. The algorithm, which includes several dominance rules, is tested on problems with up to fifty jobs. The computational results indicate that the version of the lower bound using improved constraints is superior to the original version.  相似文献   

9.
N. W. Sauer  M. G. Stone 《Order》1989,5(4):345-348
In 1979, Papadimitriou and Yannakakis gave a polynomial time algorithm for the scheduling of jobs requiring unit completion times when the precedence constraints form an interval order. The authors solve here the corresponding problem, for preemptive scheduling (a job can be interrupted to work on more important tasks, and completed at a later time, subject to the usual scheduling constraints.) The m-machine preemptive scheduling problem is shown to have a polynomial algorithm, for both unit time and variable execution times as well, when the precedence constraints are given by an interval order.  相似文献   

10.
The single machine scheduling problem with two types of controllable parameters, job processing times and release dates, is studied. It is assumed that the cost of compressing processing times and release dates from their initial values is a linear function of the compression amounts. The objective is to minimize the sum of the total completion time of the jobs and the total compression cost. For the problem with equal release date compression costs we construct a reduction to the assignment problem. We demonstrate that if in addition the jobs have equal processing time compression costs, then it can be solved in O(n2) time. The solution algorithm can be considered as a generalization of the algorithm that minimizes the makespan and total compression cost. The generalized version of the algorithm is also applicable to the problem with parallel machines and to a range of due-date scheduling problems with controllable processing times.  相似文献   

11.
We study a problem of scheduling n jobs on a single machine in batches. A batch is a set of jobs processed contiguously and completed together when the processing of all jobs in the batch is finished. Processing of a batch requires a machine setup time dependent on the position of this batch in the batch sequence. Setup times and job processing times are continuously controllable, that is, they are real-valued variables within their lower and upper bounds. A deviation of a setup time or job processing time from its upper bound is called a compression. The problem is to find a job sequence, its partition into batches, and the values for setup times and job processing times such that (a) total job completion time is minimized, subject to an upper bound on total weighted setup time and job processing time compression, or (b) a linear combination of total job completion time, total setup time compression, and total job processing time compression is minimized. Properties of optimal solutions are established. If the lower and upper bounds on job processing times can be similarly ordered or the job sequence is fixed, then O(n3 log n) and O(n5) time algorithms are developed to solve cases (a) and (b), respectively. If all job processing times are fixed or all setup times are fixed, then more efficient algorithms can be devised to solve the problems.  相似文献   

12.
An O(n2) algorithm is presented for the n jobs m parallel machines problem with identical processing times. Due dates for each job are given and the objective is the minimization of the number of late jobs. Preemption is permitted. The problem can be formulated as a maximum flow network model. The optimality proof as well as other properties and a complete example are given.  相似文献   

13.
We consider a due-window assignment problem on identical parallel machines, where the jobs have equal processing times and job-dependent earliness-tardiness costs. We would like to determine a ‘due window’ during which the jobs can be completed at no cost and to obtain a job schedule in which the jobs are penalized if they finish before or after the due window. The objective is to minimize the total earliness and tardiness job penalty, plus the cost associated with the size of the due window. We present an algorithm that can solve this problem in O(n3) time, which is an improvement of the O(n4) solution procedure developed by Mosheiov and Sarig.  相似文献   

14.
The paper deals with the single-machine scheduling problem in which job processing times as well as release dates are controllable parameters and they may vary within given intervals. While all release dates have the same boundary values, the processing time intervals are arbitrary. It is assumed that the cost of compressing processing times and release dates from their initial values is a linear function of the compression amount. The objective is to minimize the makespan together with the total compression cost. We construct a reduction to the assignment problem for the case of equal release date compression costs and develop an O(n2) algorithm for the case of equal release date compression costs and equal processing time compression costs. For the bicriteria version of the latter problem with agreeable processing times, we suggest an O(n2) algorithm that constructs the breakpoints of the efficient frontier.  相似文献   

15.
A three-dimensional, time-minimizing (bottleneck) assignment problem consists of assigning n jobs to n workers to be performed on n machines under different forms of feasibility conditions so that the different functions of the individual times taken by a worker to finish a job on a given machine are minimized. The usual assumption made in such a problem is that all the jobs can be commenced simultaneously. In this paper, two specially structured precedence constraints on jobs are considered, which necessitate modifications in this assumption. Further, the main purpose here is to develop branch-and-bound-type algorithms for solving the corresponding problems and to illustrate them by a numerical example.  相似文献   

16.
Single-Machine Scheduling with Release Times and Tails   总被引:1,自引:0,他引:1  
We study the problem of scheduling jobs with release times and tails on a single machine with the objective to minimize the makespan. This problem is strongly NP-hard, however it is known to be polynomially solvable if all jobs have equal processing time P. We generalize this result and suggest an O(n 2 log nlog P) algorithm for the case when the processing times of some jobs are restricted to either P or 2P.  相似文献   

17.
We consider the problem of preemptive scheduling n jobs on two uniform parallel machines. All jobs have equal processing requirements. For each job we are given its due date. The objective is to find a schedule minimizing total tardiness ∑Ti. We suggest an O(n log n) algorithm to solve this problem.  相似文献   

18.
We consider some problems of scheduling jobs on identical parallel machines where job-processing times are controllable through the allocation of a nonrenewable common limited resource. The objective is to assign the jobs to the machines, to sequence the jobs on each machine and to allocate the resource so that the makespan or the sum of completion times is minimized. The optimization is done for both preemptive and nonpreemptive jobs. For the makespan problem with nonpreemptive jobs we apply the equivalent load method in order to allocate the resources, and thereby reduce the problem to a combinatorial one. The reduced problem is shown to be NP-hard. If preemptive jobs are allowed, the makespan problem is shown to be solvable in O(n2) time. Some special cases of this problem with precedence constraints are presented and the problem of minimizing the sum of completion times is shown to be solvable in O(n log n) time.  相似文献   

19.
We consider the problem of scheduling n jobs on m parallel machines with inclusive processing set restrictions. Each job has a given release date, and all jobs have equal processing times. The objective is to minimize the makespan of the schedule. Li and Li (2015) have developed an O(n2+mn log?n) time algorithm for this problem. In this note, we present a modified algorithm with an improved time complexity of O(min{m, log?n} ? n log?n).  相似文献   

20.
In this paper we consider the problem of minimizing number of tardy jobs on a single batch processing machine. The batch processing machine is capable of processing up to B jobs simultaneously as a batch. We are given a set of n jobs which can be partitioned into m incompatible families such that the processing times of all jobs belonging to the same family are equal and jobs of different families cannot be processed together. We show that this problem is NP-hard and present a dynamic programming algorithm which has polynomial time complexity when the number of job families and the batch machine capacity are fixed. We also show that when the jobs of a family have a common due date the problem can be solved by a pseudo-polynomial time procedure.  相似文献   