共查询到20条相似文献,搜索用时 15 毫秒
1.
C. Picouleau 《Discrete Applied Mathematics》1995,60(1-3):331-342
Although most of the scheduling problems with interprocessor communication delays have been shown to be NP-complete, some important special cases were still unsolved. This paper deals with the problem where communication times are smaller than processing times and task duplication is not allowed. We prove that this problem is NP-complete and we give an efficient approximate algorithm with performance guarantee. 相似文献
2.
Philippe Chrtienne 《Discrete Applied Mathematics》2008,156(13):2543-2550
This paper introduces the non-idling machine constraint where no intermediate idle time between the operations processed by a machine is allowed. In its first part, the paper considers the non-idling single-machine scheduling problem. Complexity aspects are first discussed. The “Earliest Non-Idling” property is then introduced as a sufficient condition so that an algorithm solving the original problem also solves its non-idling variant. Moreover it is shown that preemptive problems do have that property. The critical times of an instance are then introduced and it is shown that when their number is polynomial, as for equal-length jobs, a polynomial algorithm solving the original problem has a polynomial variant solving its non-idling version. 相似文献
3.
On scheduling an unbounded batch machine 总被引:1,自引:0,他引:1
A batch machine is a machine that can process up to c jobs simultaneously as a batch, and the processing time of the batch is equal to the longest processing time of the jobs assigned to it. In this paper, we deal with the complexity of scheduling an unbounded batch machine, i.e., c=+∞. We prove that minimizing total tardiness is binary NP-hard, which has been an open problem in the literature. Also, we establish the pseudopolynomial solvability of the unbounded batch machine scheduling problem with job release dates and any regular objective. This is distinct from the bounded batch machine and the classical single machine scheduling problems, most of which with different release dates are unary NP-hard. Combined with the existing results, this paper provides a nearly complete mapping of the complexity of scheduling an unbounded batch machine. 相似文献
4.
5.
Multi-agent single machine scheduling 总被引:1,自引:0,他引:1
Alessandro Agnetis Dario Pacciarelli Andrea Pacifici 《Annals of Operations Research》2007,150(1):3-15
We consider the scheduling problems arising when several agents, each owning a set of nonpreemptive jobs, compete to perform
their respective jobs on one shared processing resource. Each agent wants to minimize a certain cost function, which depends
on the completion times of its jobs only. The cost functions we consider in this paper are maximum of regular functions (associated
with each job), number of late jobs and total weighted completion time. The different combinations of the cost functions of
each agent lead to various problems, whose computational complexity is analysed in this paper. In particular, we investigate
the problem of finding schedules whose cost for each agent does not exceed a given bound for each agent. 相似文献
6.
7.
This note investigates two-machine flow shop scheduling with transportation constraints to minimize makespan. Recently, Soukhal et al. [A. Soukhal, A. Oulamara, P. Martineau, Complexity of flow shop scheduling problems with transportation constraints, European Journal of Operational Research 161 (2005) 32–41] proved that this problem is strongly NP-hard when the capacity of the truck is limited to two or three parts. The considered problem with blocking constraints is also proved to be strongly NP-hard by Soukhal et al. Unfortunately, their proofs contain mistakes. We point out their proofs’ invalidity and then show that, when the capacity of the truck is limited to two parts, the problem is binary NP-hard, and when the capacity of the truck is limited to three parts the problem is strongly NP-hard even if the jobs have a common processing time on machine one and all jobs have the same transportation time. We show also that the last result can be generalized to any fixed c (c ? 3) parts. 相似文献
8.
A stable schedule is a robust schedule that will change little when uncertain events occur. The purpose of this paper is to investigate the complexity status of a number of machine scheduling problems with stability objective, when the duration of a single job is anticipated to be disrupted. 相似文献
9.
In this paper we consider a problem of preemptive scheduling of multiprocessor tasks on dedicated processors in order to minimize the sum of completion times. Using a standard notation, our problem can be denoted as P ∣ fixj, pmtn ∣ ∑Cj. We give a polynomial-time algorithm to solve P ∣ fixj, G = {P4, dart}-free, pmtn ∣ ∑Cj problem. This result generalizes the following problems: P2 ∣ fixj, pmtn ∣ ∑Cj, P ∣ ∣fixj∣ ∈ {1, m}, pmtn ∣ ∑Cj and P4 ∣ fixj = 2, pmtn ∣ ∑Cj. 相似文献
10.
11.
This paper considers single machine scheduling problems where job processing times are known and deterministic but where the reward received upon completion of a job changes stochastically over time according to Brownian motion. The objectives of maximizing expected net-present-value (NPV), minimizing the variance of NPV and maximizing the probability of achieving a minimum benchmark NPV are considered. For non-preemptive static list policies complexity results and branch and bound procedures are presented. The branch and bound procedures are shown to be effective for problem instances with 20–25 jobs. For the problem of maximizing NPV with non-preemptive dynamic policies the optimal static schedule is shown through empirical testing to be as good as a greedy heuristic and to be near optimal when the variance is not large. 相似文献
12.
In this paper, an integer programming model for the hierarchical workforce problem under the compressed workweeks is developed. The model is based on the integer programming formulation developed by Billionnet [A. Billionnet, Integer programming to schedule a hierarchical workforce with variable demands, European Journal of Operational Research 114 (1999) 105–114] for the hierarchical workforce problem. In our model, workers can be assigned to alternative shifts in a day during the course of a week, whereas all workers are assigned to one shift type in Billionnet’s model. The main idea of this paper is to use compressed workweeks in order to save worker costs. This case is also suitable for the practice. The proposed model is illustrated on the Billionnet’s example problem and the obtained results are compared with the Billionnet’s model results. 相似文献
13.
14.
Wei Yu Zhaohui Liu Leiyang Wang Tijun Fan 《European Journal of Operational Research》2011,213(1):945-36
We consider a generalization of the classical open shop and flow shop scheduling problems where the jobs are located at the vertices of an undirected graph and the machines, initially located at the same vertex, have to travel along the graph to process the jobs. The objective is to minimize the makespan. In the tour-version the makespan means the time by which each machine has processed all jobs and returned to the initial location. While in the path-version the makespan represents the maximum completion time of the jobs. We present improved approximation algorithms for various cases of the open shop problem on a general graph, and the tour-version of the two-machine flow shop problem on a tree. Also, we prove that both versions of the latter problem are NP-hard, which answers an open question posed in the literature. 相似文献
15.
Professor Dr. P. Brucker U. Kathmann 《Mathematical Methods of Operations Research》1990,34(5):381-394
A pattern is a sequence of disjoint intervals on a circle together with fixed distances between these intervals. The intervals may be interpreted as tasks of a job which is produced perio-dically on one machine. How shouldr patterns be moved relative to each other to minimize the maximum overlapping of intervals (machines needed)? An enumerative procedure for solving this problem is given. 相似文献
16.
A single-machine scheduling problem with precedence delays is analyzed. A set of n tasks is to be scheduled on the machine in such a way that the makespan is minimized. The executions of the tasks are constrained by precedence delays, i.e., a task can start its execution only after any of its predecessors has completed and the delay between the two tasks has elapsed. In the case of unit execution times and integer lengths of delays, the problem is shown to be NP-hard in the strong sense. In the case of integer execution times and unit length of delays, the problem is polynomial, and an O(n2) optimal algorithm is provided. Both preemptive and non-preemptive cases are considered. 相似文献
17.
C.T. Ng M.S. Barketau T.C.E. Cheng Mikhail Y. Kovalyov 《European Journal of Operational Research》2010
Problem Product Partition differs from the NP-complete problem Partition in that the addition operation is replaced by the multiplication operation. Furthermore it differs from the NP-complete problem Subset Product in that it does not contain the product value B in its input. We prove that problem Product Partition and several of its modifications are NP-complete in the strong sense. Our results imply the strong NP-hardness of a number of scheduling problems with start-time-dependent job processing times and a problem of designing a reliable system with a series–parallel structure. It should be noticed that the strong NP-hardness of the considered optimization problems does not preclude the existence of a fully polynomial time approximation scheme (FPTAS) for them. We present a simple FPTAS for one of these problems. 相似文献
18.
Mingbao Cheng Pandu R. Tadikamalla Jennifer Shang Shaqing Zhang 《European Journal of Operational Research》2014
We study a two-machine flowshop scheduling problem with time-dependent deteriorating jobs, i.e. the processing times of jobs are an increasing function of their starting time. The objective is to minimize the total completion time subject to minimum makespan. We propose a mixed integer programming model, and develop two pairwise interchange algorithms and a branch-and-bound procedure to solve the problem while using several dominance conditions to limit the size of the search tree. Several polynomial-time solvable special cases are discussed. Finally, numerical studies are performed to examine the effectiveness and the efficiency of the proposed algorithms. 相似文献
19.
Complexity analysis of an assignment problem with controllable assignment costs and its applications in scheduling 总被引:1,自引:0,他引:1
We extend the classical linear assignment problem to the case where the cost of assigning agent j to task i is a multiplication of task i’s cost parameter by a cost function of agent j. The cost function of agent j is a linear function of the amount of resource allocated to the agent. A solution for our assignment problem is defined by the assignment of agents to tasks and by a resource allocation to each agent. The quality of a solution is measured by two criteria. The first criterion is the total assignment cost and the second is the total weighted resource consumption. We address these criteria via four different problem variations. We prove that our assignment problem is NP-hard for three of the four variations, even if all the resource consumption weights are equal. However, and somewhat surprisingly, we find that the fourth variation is solvable in polynomial time. In addition, we find that our assignment problem is equivalent to a large set of important scheduling problems whose complexity has been an open question until now, for three of the four variations. 相似文献
20.
M.G.C. Bosman V. BakkerA. Molderink J.L. Hurink G.J.M. Smit 《European Journal of Operational Research》2012,216(1):140-151
This paper describes a planning problem, arising in the energy supply chain, that deals with the planning of the production runs of micro combined heat and power (microCHP) appliances installed in houses, cooperating in a fleet. Two types of this problem are described. The first one is the Single House Planning Problem (SHPP), where the focus is on supplying heat in the household. The second one combines many microCHPs into a Fleet Planning Problem (FPP) and focuses on the mutual electricity output, while still considering the local heat demand in the individual households. The problem is modeled as an ILP. For practical use a local search method is developed for the FPP, based on a dynamic programming formulation of the SHPP. 相似文献