首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
This paper studies single-machine scheduling problems with setup times which are proportionate to the length of the already scheduled jobs, that is, with past-sequence-dependent or p-s-d setup times. The following objective functions are considered: the maximum completion time (makespan), the total completion time, the total absolute differences in completion times and a bicriteria combination of the last two objective functions. It is shown that the standard single-machine scheduling problem with p-s-d setup times and any of the above objective functions can be solved in O(nlog n) time (where n is the number of jobs) by a sorting procedure. It is also shown that all of our results extend to a “learning” environment in which the p-s-d setup times are no longer linear functions of the already elapsed processing time due to learning effects.  相似文献   

2.
In many realistic scheduling settings a job processed later consumes more time than the same job processed earlier – this is known as scheduling with deteriorating jobs. Most research on scheduling with deteriorating jobs assumes that the actual processing time of a job is an increasing function of its starting time. Thus a job processed late may incur an excessively long processing time. On the other hand, setup times occur in manufacturing situations where jobs are processed in batches whereby each batch incurs a setup time. This paper considers scheduling with deteriorating jobs in which the actual processing time of a job is a function of the logarithm of the total processing time of the jobs processed before it (to avoid the unrealistic situation where the jobs scheduled late will incur excessively long processing times) and the setup times are proportional to the actual processing times of the already scheduled jobs. Under the proposed model, we provide optimal solutions for some single-machine problems.  相似文献   

3.
The paper deals with single machine scheduling problems with setup time considerations where the actual processing time of a job is not only a non-decreasing function of the total normal processing times of the jobs already processed, but also a non-increasing function of the job’s position in the sequence. The setup times are proportional to the length of the already processed jobs, i.e., the setup times are past-sequence-dependent (p-s-d). We consider the following objective functions: the makespan, the total completion time, the sum of the δth (δ ≥ 0) power of job completion times, the total weighted completion time and the maximum lateness. We show that the makespan minimization problem, the total completion time minimization problem and the sum of the δ th (δ ≥ 0) power of job completion times minimization problem can be solved by the smallest (normal) processing time first (SPT) rule, respectively. We also show that the total weighted completion time minimization problem and the maximum lateness minimization problem can be solved in polynomial time under certain conditions.  相似文献   

4.
Recently Koulamas and Kyparisis [Koulamas, C., Kyparisis, G.J., in press. Single-machine scheduling with past-sequence-dependent setup times. European Journal of Operational Research] introduced past-sequence-dependent setup times to scheduling problems. This means that the setup time of a job is proportionate to the sum of processing times of the jobs already scheduled. Koulamas and Kyparisis [Koulamas, C., Kyparisis, G.J., in press. Single-machine scheduling with past-sequence-dependent setup times. European Journal of Operational Research] were able to show for a number of single-machine scheduling problems with completion time goals that they remain polynomially solvable. In this paper we extend the analysis to problems with due dates. We demonstrated that some problems remain polynomially solvable. However, for some other problems well-known polynomially solution approaches do not guarantee optimality any longer. Consequently we concentrated on finding polynomially solvable special cases.  相似文献   

5.
In this paper we consider the single-machine setup times scheduling with general effects of deterioration and learning. By the general effects of deterioration and learning, we mean that the actual job processing time is a general function of the processing times of the jobs already processed and its scheduled position. The setup times are proportional to the length of the already processed jobs, i.e., the setup times are past-sequence-dependent (p-s-d). We show that the problems to minimize the makespan, the sum of the δδth (δ>0δ>0) power of job completion times, the total lateness are polynomially solvable. We also show that the total weighted completion time minimization problem, the discounted total weighted completion time minimization problem, the maximum lateness (tardiness) minimization problem, the total tardiness minimization problem can be solved in polynomial time under certain conditions.  相似文献   

6.
In this paper we consider the single machine past-sequence-dependent (p-s-d) setup times scheduling problems with general position-dependent and time-dependent learning effects. By the general position-dependent and time-dependent learning effects, we mean that the actual processing time of a job is not only a function of the total normal processing times of the jobs already processed, but also a function of the job’s scheduled position. The setup times are proportional to the length of the already processed jobs. We consider the following objective functions: the makespan, the total completion time, the sum of the θth (θ ? 0) power of job completion times, the total lateness, the total weighted completion time, the maximum lateness, the maximum tardiness and the number of tardy jobs. We show that the problems of makespan, the total completion time, the sum of the θth (θ ? 0) power of job completion times and the total lateness can be solved by the smallest (normal) processing time first (SPT) rule, respectively. We also show that the total weighted completion time minimization problem, the maximum lateness minimization problem, maximum tardiness minimization problem and the number of tardy jobs minimization problem can be solved in polynomial time under certain conditions.  相似文献   

7.
In this paper we consider single-machine group scheduling problems with effects of learning and deterioration at the same time. By effects of learning and deterioration, we mean that the group setup times are general linear functions of their starting times and the jobs in the same group have general position-dependent and time-dependent learning effects. The objective of scheduling problems is to minimize the makespan and the sum of completion times, respectively. We show that the problems remain solvable in polynomial time under the proposed model.  相似文献   

8.
The purpose of this study is to explore the single-machine scheduling with the effects of exponential learning and general deterioration. By the effects of exponential learning and general deterioration, we meant that job processing time is decided by the functions of their starting time and positions in the sequence. Results showed that with the introduction of learning effect and deteriorating jobs to job processing time, single-machine makespan, and sum of completion time (square) minimization problems remained polynomially solvable, respectively. But for the following objective functions: the weighted sum of completion time and the maximum lateness, this paper proved that the weighted smallest basic processing time first (WSPT) rule and the earliest due date first (EDD) rule constructed the optimal sequence under some special cases, respectively.  相似文献   

9.
This paper considers single-machine scheduling problems with job delivery times where the actual job processing time of a job is defined by a function dependent on its position in a schedule. We assume that the job delivery time is proportional to the job waiting time. We investigate the minimization problems of the sum of earliness, tardiness, and due-window-related cost, the total absolute differences in completion times, and the total absolute differences in waiting times on a single-machine setting. The polynomial time algorithms are proposed to optimally solve the above objective functions. We also investigate some special cases of the problem under study and show that they can be optimally solved by lower order algorithms.  相似文献   

10.
This paper studies the single machine past-sequence-dependent (p-s-d) delivery times scheduling with general position-dependent and time-dependent learning effects. By the general position-dependent and time-dependent learning effects we mean that the actual processing time of a job is not only a function of the total normal processing times of the jobs already processed, but also a function of the job’s scheduled position. We consider the following objective functions: the makespan, the total completion time, the sum of the θθth (θ?0θ?0) power of job completion times, the total lateness, the total weighted completion time, the maximum lateness, the maximum tardiness and the number of tardy jobs. We show that the problems of minimization of the makespan, the total completion time, the sum of the θθth (θ?0θ?0) power of job completion times and the total lateness can be solved by the smallest (normal) processing time first (SPT) rule, respectively. We also show that the total weighted completion time minimization problem, the discounted total weighted completion time minimization problem, the maximum lateness minimization problem, the maximum tardiness minimization problem and the total tardiness minimization problem can be solved in polynomial time under certain conditions.  相似文献   

11.
Single-machine scheduling with both deterioration and learning effects   总被引:1,自引:0,他引:1  
This paper considers a single-machine scheduling problem with both deterioration and learning effects. The objectives are to respectively minimize the makespan, the total completion times, the sum of weighted completion times, the sum of the kth power of the job completion times, the maximum lateness, the total absolute differences in completion times and the sum of earliness, tardiness and common due-date penalties. Several polynomial time algorithms are proposed to optimally solve the problem with the above objectives.  相似文献   

12.
In this article, we study an unrelated parallel machine scheduling problem with setup time and learning effects simultaneously. The setup time is proportional to the length of the already processed jobs. That is, the setup time of each job is past-sequence-dependent. The objective is to minimize the total completion time. We show that there exists a polynomial time solution for the proposed problem. We also discuss two special cases of the problem and show that they can be optimally solved by lower order algorithms.  相似文献   

13.
Scheduling with deterioration effects has been widely investigated in the past two decades. In realistic situations, the deterioration effect might accelerate, especially in the food manufacturing industry. In this paper we propose a scheduling model with an accelerating deterioration effect. We show that the single-machine problems under the model to minimize the makespan, total completion time, total weighted completion time, maximum lateness, maximum tardiness, and total tardiness remain polynomially solvable.  相似文献   

14.
Scheduling with setup times and learning plays a crucial role in today's manufacturing and service environments where scheduling decisions are made with respect to multiple performance criteria rather than a single criterion. In this paper, we address a bicriteria single machine scheduling problem with job-dependent past-sequence-dependent setup times and job-dependent position-based learning effects. The setup time and actual processing time of a job are respectively unique functions of the actual processing times of the already processed jobs and the position of the job in a schedule. The objective is to derive the schedule that minimizes a linear composite function of a pair of performance criteria consisting of the makespan, the total completion time, the total lateness, the total absolute differences in completion times, and the sum of earliness, tardiness, and common due date penalty. We show that the resulting problems cannot be solved in polynomial time; thus, branch-and-bound (B&B) methods are proposed to obtain the optimal schedules. Our computational results demonstrate that the B&B can solve instances of various size problems with attractive times.  相似文献   

15.
This paper considers identical parallel-machine scheduling problem with past-sequence-dependent (psd) delivery times and learning effect. In electronic manufacturing industry, an electronic component may be exposed to certain electromagnetic field and requires an extra time for eliminating adverse effect after the main processing. The extra time is modeled as past-sequence-dependent delivery time in the literature, which is proportional to the waiting time in the system. It is also observed that the learning process reflects a decrease in the processing time as a function of the number of repetitions, i.e., as a function of the job position in the sequence. In practice, one often has to deal with the scheduling problems with psd delivery times and learning effect. Identical parallel-machine setting is considered because the occurrence of resources in parallel is common in the real world. In this paper, three objectives are the minimization of the total absolute deviation of job completion times, the total load on all machines and the total completion time. We develop polynomial algorithms to optimally solve these problems.  相似文献   

16.
Scheduling research has increasingly taken the concept of deterioration into consideration. In this paper, we study a single machine group scheduling problem with deterioration effect, where the jobs are already put into groups, before any optimization. We assume that the actual processing times of jobs are increasing functions of their starting times, i.e., the job processing times are described by a function which is proportional to a linear function of time. The setup times of groups are assumed to be fixed and known. For some special cases of minimizing the makespan with ready times of the jobs, we show that the problem can be solved in polynomial time for the proposed model. For the general case, a heuristic algorithm is proposed, and the computational experiments show that the performance of the heuristic is fairly accurately in obtaining near-optimal solutions. The results imply that the average percentage error of the proposed heuristic algorithm from optimal solutions is less than 3%.  相似文献   

17.
In this paper, we consider the single-machine scheduling problems with nonlinear deterioration. By the nonlinear deterioration effect, we mean that the processing times of jobs are nonlinear functions of their starting times. We show that even with the introduction of nonlinear deterioration to job processing times, single machine makespan minimization problem remains polynomially solvable. We also show that an optimal schedule of the total completion time minimization problem is V-shaped with respect to job normal processing times. A heuristic algorithm utilizing the V-shaped property is proposed, and computational experiments show that it performs effectively and efficiently in obtaining near-optimal solutions.  相似文献   

18.
Traditionally, job processing times are assumed to be known and fixed; however, there are many situations in which a job that is processed later consumes more time than the same job when it is processed earlier. This is known as deteriorating jobs scheduling in the literature. Most of the research in deteriorating jobs scheduling assumes that the actual job processing time is a linear function of its starting time. Thus, the actual job processing times might increase significantly if the number of jobs or the job sizes increase. Motivated by this limitation, this paper addresses a new deterioration model where the actual job processing time is a function of the logarithm of the job processing times already processed. Under the proposed model, we provide the optimal solutions for some single-machine problems.  相似文献   

19.
Scheduling with learning effects has been widely studied in the past decade. With the increasingly moving toward shorter product cycle times in many production lines, workers in this changeable environment must constantly learn new skill and technology. As a result, the forgetting effect might occur in these situations. In this paper, we propose a model with the consideration of both the learning and forgetting effects. We show some single-machine problems remain polynomially solvable under the proposed model.  相似文献   

20.
This paper considers single machine scheduling with past-sequence-dependent (psd) delivery times, in which the processing time of a job depends on its position in a sequence. We provide a unified model for solving single machine scheduling problems with psd delivery times. We first show how this unified model can be useful in solving scheduling problems with due date assignment considerations. We analyze the problem with four different due date assignment methods, the objective function includes costs for earliness, tardiness and due date assignment. We then consider scheduling problems which do not involve due date assignment decisions. The objective function is to minimize makespan, total completion time and total absolute variation in completion times. We show that each of the problems can be reduced to a special case of our unified model and solved in O(n 3) time. In addition, we also show that each of the problems can be solved in O(nlogn) time for the spacial case with job-independent positional function.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号