首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
In this study, a tabu search (TS) approach to the single machine total weighted tardiness problem (SMTWT) is presented. The problem consists of a set of independent jobs with distinct processing times, weights and due dates to be scheduled on a single machine to minimize total weighted tardiness. The theoretical foundation of single machine scheduling with due date related objectives reveal that the problem is NP-hard, rendering it a challenging area for meta-heuristic approaches. This paper presents a totally deterministic TS algorithm with a hybrid neighborhood and dynamic tenure structure, and investigates the strength of several candidate list strategies based on problem specific characteristics in increasing the efficiency of the search. The proposed TS approach yields very high quality results for a set of benchmark problems obtained from the literature.  相似文献   

2.
The problem of sequencing jobs on a single machine to minimize total tardiness is considered. An algorithm, which decomposes the problem into subproblems which are then solved by dynamic programming when they are sufficiently small, is presented and is tested on problems with up to 100 jobs.  相似文献   

3.
研究带有固定区间的两个代理单机排序问题.第一个代理工件可中断,且工件到达时间与工期满足一致关系,目标函数为最小化总误工.第二个代理工件被安排在固定时间窗口.目标是寻找一个排序,使得满足第二个代理目标可行情况下,第一个代理目标函数值最小.在固定区间等于加工时间的情况下,利用分块原则,提出了一个伪多项式时间动态规划算法,并给出了固定区间大于加工时间情况下的时间复杂度分析.  相似文献   

4.
We consider the problem of scheduling n preemptive jobs on a single machine to minimize total tardiness, subject to agreeable due dates, i.e., a later release date corresponds to a later due date. We prove that the problem is -hard in the ordinary sense by showing that it is -hard, and deriving a pseudo-polynomial algorithm for it.  相似文献   

5.
This paper considers the problem of scheduling a given number of jobs on a single machine to minimize total earliness and tardiness when family setup times exist. The paper proposes optimal branch-and-bound algorithms for both the group technology assumption and if the group technology assumption is removed. A heuristic algorithm is proposed to solve larger problems with the group technology assumption removed. The proposed algorithms were empirically evaluated on problems of various sizes and parameters. The paper also explores how the choice of procedure affects total earliness and tardiness if an implementation of lean production methods has resulted in a reduction in setup times. An important finding of these empirical investigations is that scheduling jobs by removing the group technology assumption can significantly reduce total earliness and tardiness.  相似文献   

6.
对于机器排序的应急管理问题,Qi Xiang-tong等人进行了系统分析,得出了较好的结果.此文则考虑带可分配工期的总误工问题的应急管理问题.对于不同模型,或给出其最优序,或给出其近似解.  相似文献   

7.
Based on the work by Congram, Potts and Van de Velde, we develop for the single-machine total weighted tardiness scheduling problem an enhanced dynasearch neighborhood obtained by the generalized pairwise interchange (GPI) operators. Despite of the wider neighborhood considered, a fast search procedure using also elimination criteria is developed. The computational results significantly improve over those of Congram, Potts and Van de Velde.  相似文献   

8.
A fully polynomial approximation scheme is presented for the problem of sequencing jobs for processing by a single machine so as to minimize total tardiness. This result is obtained by modifying the author's pseudopolynomial algorithm for the same problem.  相似文献   

9.
This paper addresses the parallel machine scheduling problem in which the jobs have distinct due dates with earliness and tardiness costs. New lower bounds are proposed for the problem, they can be classed into two families. First, two assignment-based lower bounds for the one-machine problem are generalized for the parallel machine case. Second, a time-indexed formulation of the problem is investigated in order to derive efficient lower bounds throught column generation or Lagrangean relaxation. A simple local search algorithm is also presented in order to derive an upper bound. Computational experiments compare these bounds for both the one machine and parallel machine problems and show that the gap between upper and lower bounds is about 1.5%.  相似文献   

10.
Minimizing of total tardiness is one of the most studied topics on single machine problems. Researchers develop a number of optimizing and heuristic methods to solve this NP-hard problem. In this paper, the problem of minimizing total tardiness is examined in a learning effect situation. The concept of learning effects describes the reduction of processing times arising from process repetition. A 0–1 integer programming model is developed to solve the problem. Also, a random search, the tabu search and the simulated annealing-based methods are proposed for the problem and the solutions of the large size problems with up to 1000 jobs are found by these methods. To the best of our knowledge, no works exists on the total tardiness problem with a learning effect tackled in this paper.  相似文献   

11.
We study the approximability of minimum total weighted tardiness with a modified objective which includes an additive constant. This ensures the existence of a positive lower bound for the minimum value. Moreover the new objective has a natural interpretation in just-in-time production systems.  相似文献   

12.
Most successful heuristics for solving 1||∑wjTj are based on swap moves. We present an algorithm which improves the complexity of searching the swap neighborhood from O(n3) to O(n2). We show that this result also improves the complexity of the recently developed dynasearch heuristics.  相似文献   

13.
We address a novel truck scheduling problem arising in crossdocking logistics, in which inbound trucks carry items (pallets) which must be sorted and loaded onto outbound trucks. We minimize the utilisation of the warehouse by focusing on the synchronisation between the different related trucks. The problem is to assign the trucks to the doors of the warehouse and sequence them, in order to minimize the total time spent in the system by the pallets. We discuss the complexity of the problem, showing that even with a single door the problem is NP-hard in general, and discuss some special cases.  相似文献   

14.
In this paper a genetic algorithm for solving a class of project scheduling problems, called Resource Investment Problem, is presented. Tardiness of project is permitted with defined penalty. Elements of algorithm such as chromosome structure, unfitness function, crossover, mutation, immigration and local search operations are explained.  相似文献   

15.
We consider the problem of preemptive scheduling n jobs on two uniform parallel machines. All jobs have equal processing requirements. For each job we are given its due date. The objective is to find a schedule minimizing total tardiness ∑Ti. We suggest an O(n log n) algorithm to solve this problem.  相似文献   

16.
We address the single-machine stochastic scheduling problem with an objective of minimizing total expected earliness and tardiness costs, assuming that processing times follow normal distributions and due dates are decisions. We develop a branch and bound algorithm to find optimal solutions to this problem and report the results of computational experiments. We also test some heuristic procedures and find that surprisingly good performance can be achieved by a list schedule followed by an adjacent pairwise interchange procedure.  相似文献   

17.
18.
We consider round-robin sports tournaments with n teams and n−1 rounds. We construct an infinite family of opponent schedules for which every home-away assignment induces at least breaks. This construction establishes a matching lower bound for a corresponding upper bound from the literature.  相似文献   

19.
We study bicriteria problems of minimizing maximum tardiness and total due date assignment cost in various scheduling environments. We assume that each job can be assigned a different due date without any restriction, and that each due date assignment cost is a non-decreasing function of the quoted due date. We settle the complexity of most of the problems studied by either proving that they are NP-hard or finding a polynomial time solution for them. We also include approximation and non-approximability results for several parallel-machine problems.  相似文献   

20.
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号