首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
We consider the following scheduling setting: a set of n tasks have to be executed on a set of m identical machines. It is well known that shortest processing time (SPT) schedules are optimal for the problem of minimizing the total sum of completion times of the tasks. In this paper, we measure the quality of SPT schedules, from an approximation point of view, with respect to the following optimality criteria: sum of completion times per machine, global fairness, and individual fairness.  相似文献   

2.
We study preemptive and non-preemptive versions of the general multiprocessor job shop scheduling problem: Given a set of n tasks each consisting of at most μ ordered operations that can be processed on different (possibly all) subsets of m machines with different processing times, compute a schedule (preemptive or non-preemptive, depending on the model) with minimum makespan where operations belonging to the same task have to be scheduled according to the specified order. We propose algorithms for both preemptive and non-preemptive variants of this problem that compute approximate solutions of any positive ε accuracy and run in O(n) time for any fixed values of m, μ, and ε. These results include (as special cases) many recent developments on polynomial time approximation schemes for scheduling jobs on unrelated machines, multiprocessor tasks, and classical open, flow and job shops.  相似文献   

3.
This paper addresses the problem of scheduling n unit length tasks on m identical machines under certain precedence constraints. The aim is to compute minimal length nonpreemptive schedules. We introduce a new order class which contains properly two rich families of precedence graphs: interval orders and a subclass of the class of series parallel orders. We present a linear time algorithm to find an optimal schedule for this new order class on any number of machines.  相似文献   

4.
We consider the preemptive scheduling of n independent jobs on m unrelated machines to minimize the makespan. Preemptive schedules with at most 2m–3 preemptions are built, which are optimal when the maximal job processing time is no more than the optimal schedule makespan. We further restrict the maximal job processing time and obtain optimal schedules with at most m–1 preemptions. This is better than the earlier known best bound of 4m 2–5m+2 on the total number of preemptions. Without the restriction on the maximal job processing time, our (2m–3)-preemptive schedules have a makespan which is no more than either of the following two magnitudes: (a) the maximum between the longest job processing time and the optimal preemptive makespan, and (b) the optimal nonpreemptive makespan. Our (m–1)-preemptive schedules might be at most twice worse than an optimal one.  相似文献   

5.
This paper deals with two-machine flowshop problems with deteriorating tasks, i.e. tasks whose processing times are a nondecreasing function that depend on the length of the waiting periods. We consider the so-called Restricted Problem. This problem can be defined as follows: for a given permutation of tasks, find an optimal placement on two machines so that the total completion time is minimized. We will show that the Restricted Problem is nontrivial. We give some properties for the optimal placement and we propose an optimal placement algorithm.   相似文献   

6.
A set of n nonpreemptive tasks are to be scheduled on m parallel dedicated machines with a regular criterion. Chain precedence constraints among the tasks, deterministic processing times and processing machine of each task are given.  相似文献   

7.
The flowshop scheduling problems with n jobs processed on two or three machines, and with two jobs processed on k machines are addressed where jobs have random and bounded processing times. The probability distributions of random processing times are unknown, and only the lower and upper bounds of processing times are given before scheduling. In such cases, there may not exist a unique schedule that remains optimal for all feasible realizations of the processing times, and therefore, a set of schedules has to be considered which dominates all other schedules for the given criterion. We obtain sufficient conditions when transposition of two jobs minimizes total completion time for the cases of two and three machines. The geometrical approach is utilized for flowshop problem with two jobs and k machines.  相似文献   

8.
《Optimization》2012,61(12):1493-1517
The flow-shop minimum-length scheduling problem with n jobs processed on two machines is addressed where processing times are uncertain: lower and upper bounds for the random processing time are given before scheduling, but its probability distribution between these bounds is unknown. For such a problem, there often does not exist a dominant schedule that remains optimal for all possible realizations of the job processing times, and we look for a minimal set of schedules that is dominant. Such a minimal dominant set of schedules may be represented by a dominance digraph. We investigate useful properties of such a digraph.  相似文献   

9.
We investigate the computational complexity of no-wait shops scheduling problems. The problem of finding optimal finish time schedules is shown to be NP-hard for flowshops with two machine centres where each machine centre has one or more parallel machines for processing tasks. The complexity results are also reported for no-wait shops scheduling when all nonzero tasks have unit or identical processing time requirement. A polynomial time algorithm for 3-machine flowshops is proposed for optimal finish time schedules. Finding optimal finish time schedules in 2-machine jobshops in NP-hard. Also we establish NP-hard results for 3-machine jobshops for both optimal finish time and mean flow time schedules. Some results are deduced with the present work and with those reported earlier.  相似文献   

10.
Balanced sampling plans excluding contiguous units (BSEC) were first introduced in 1988 by Hedayat, Rao and Stufken [A.S. Hedayat, C.R. Rao, J. Stufken, Sampling plans excluding contiguous units, J. Statist. Plann. Inference 19 (1988) 159-170]. These designs can be used for survey sampling when the contiguous units provide similar information. In this paper, we show some recursive constructions for two dimensional BSECs with block size four, and give the existence of some infinite classes.  相似文献   

11.
The parallel shop and the open shop are two machine environments that have received much attention in the literature of scheduling theory. A common generalization—the open shop with parallel machines—is considered in this paper. Polynomial-time algorithms are presented for obtaining minimum-length preemptive schedules for three cases. Open shops with single-operation machines of equal speed are scheduled with essentially no more difficulty than an ordinary open shop. Open shops with multiple-operation machines of equal speed are scheduled with the aid of a sequence of network flow computations. The general open shop problem with parallel machines of arbitrary speeds can be solved by linear programming, in much the same way as an optimal preemptive schedule can be found for unrelated parallel machines.  相似文献   

12.
Let T be a set of tasks. Each task has a non-negative processing time and a deadline. The problem of determining whether or not there is a schedule of the tasks in T such that a single machine can finish processing each of them before its deadline is polynomially solvable. We prove that counting the number of schedules satisfying this condition is #P-complete.  相似文献   

13.
We establish tight bounds on the benefit of preemption with respect to the ?p norm minimization objective for identical machines and for two uniformly related machines (based on their speed ratio). This benefit of preemption is the supremum ratio between the optimal costs of non-preemptive and preemptive schedules.  相似文献   

14.
Book Reviews     
Book reviewed in this article: The British Museum (Natural History). Dinosaurs and Their Living Relatives Dictionary of Science E. B. Uvarov and Alan Isaacs Harmondsworth Wild Horses Of The Great Basin—Social Competition And Population Size by Joel Berger  相似文献   

15.
Consider a set of n unit time jobs, each one having a release date, a due date, both nonnegative integers, and a weight, a positive real number. Given a set of m parallel machines, we describe an algorithm for finding schedules with minimum weighted number of tardy jobs. The complexity of the proposed algorithm is O(n2\frac(1+logm)m)O(n^{2}\frac{(1+\log m)}{m}) . The best previous algorithm for this problem has complexity O(mn 3) and employs network flow techniques. Our method is based on a characterization for schedules of this type and employs graph theoretic tools.  相似文献   

16.
We consider the problem of scheduling tasks on flow shops when each task may also require the use of additional resources. It is assumed that all operations have unit lengths, the resource requirements are of 0–1 type and there is one type of the additional resource in the system. It is proved that when the number of machines is arbitrary, the problem of minimizing schedule length is NP-hard, even when only one unit of the additional resource is available in the system. On the other hand, when the number of machines is fixed, then the problem is solvable in polynomial time, even for an arbitrary number of resource units available. For the two machine case anO(n log 2 2 n) algorithm minimizing maximum lateness is also given. The presented results are also of importance in some message transmission systems.  相似文献   

17.
18.
We consider a set T of tasks with unit processing times. Each of them must be executed infinitely often. A uniform constraint is defined between two tasks and induces a set of precedence constraints on their successive executions. We limit our study to a subset of uniform constraints corresponding to two hypotheses often verified in practice: Each execution of T must end by a special task f, and uniform constraints between executions from different iterations start from f. We have a fixed number of identical machines. The problem is to find a periodic schedule of T which maximizes the throughput. We prove that this problem is NP-hard and show that it is polynomial for two machines. We also present another nontrivial polynomial subcase which is a restriction of uniform precedence constraints.  相似文献   

19.
In this paper we consider classical shop problems:n jobs have to be processed onm machines. The processing timep i,j of jobi on machinej is given for all operations (i, j). Each machine can process at most one job at a time and each job can be processed at most on one machine at a given time. The machine orders are fixed (job-shop) or arbitrary (open-shop). We have to determine a feasible combination of machine and job orders, a so-called sequence, which minimizes the makespan. We introduce a partial order on the set of sequences with the property that there exists at least one optimal sequence in the set of minimal elements of this partial order independent of the given processing times. The set of minimal elements (set of irreducible sequences) can be in detail described in the case of the two machine open-shop problem. The cardinality is calculated. We will show which sequences are generated by the well-known polynomial algorithms for the construction of optimal schedules. Furthermore, we investigate the problemOC max on an operation set with spanning tree structure. Supported by Deutsche Forschungsgemeinschaft, Project ScheMA  相似文献   

20.
We consider the problem of scheduling n tasks subject to chain-precedence constraints on two identical machines with the objective of minimizing the makespan. The problem is known to be strongly NP-hard. Here, we prove that it is binary NP-hard even with three chains. Furthermore, we characterize the complexity of this case by presenting a pseudopolynomial time algorithm and a fully polynomial time approximation scheme.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号