首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 0 毫秒
1.
This paper integrates production and outbound distribution scheduling in order to minimize total tardiness. The overall problem consists of two subproblems. The first addresses scheduling a set of jobs on parallel machines with machine-dependent ready times. The second focusses on the delivery of completed jobs with a fleet of vehicles which may differ in their loading capacities and ready times. Job-dependent processing times, delivery time windows, service times, and destinations are taken into account. A genetic algorithm approach is introduced to solve the integrated problem as a whole. Two main questions are examined. Are the results of integrating machine scheduling and vehicle routing significantly better than those of classic decomposition approaches which break down the overall problem, solve the two subproblems successively, and merge the subsolutions to form a solution to the overall problem? And if so, is it possible to capitalize on these potentials despite the complexity of the integrated problem? Both questions are tackled by means of a numerical study. The genetic algorithm outperforms the classic decomposition approaches in case of small-size instances and is able to generate relatively good solutions for instances with up to 50 jobs, 5 machines, and 10 vehicles.  相似文献   

2.
Complexity of a scheduling problem with controllable processing times   总被引:2,自引:0,他引:2  
We consider the problem of scheduling a set of independent jobs on a single machine so as to minimize the total weighted completion time, subject to the constraint that the total compression cost is less than or equal to a fixed amount. The complexity of this problem is mentioned as an open problem. In this note we show that the problem is NP-hard.  相似文献   

3.
This paper deals with a scheduling problem of independent tasks with common due date where the objective is to minimize the total weighted tardiness. The problem is known to be ordinary NP-hard in the case of a single machine and a dynamic programming algorithm was presented in the seminal work of Lawler and Moore [E.L. Lawler, J.M. Moore, A functional equation and its application to resource allocation and sequencing problems, Management Science 16 (1969) 77–84]. In this paper, this algorithm is described and discussed. Then, a new dynamic programming algorithm is proposed for solving the single machine case. These methods are extended for solving the identical and uniform parallel-machine scheduling problems.  相似文献   

4.
We study a coordinated scheduling problem of production and transportation in which each job is transported to a single batching machine for further processing. There are m vehicles that transport jobs from the holding area to the batching machine. Each vehicle can transport only one job at a time. The batching machine can process a batch of jobs simultaneously where there is an upper limit on the batch size. Each batch to be processed occurs a processing cost. The problem is to find a joint schedule of production and transportation such that the sum of the total completion time and the total processing cost is optimized. For a special case of the problem where the job assignment to the vehicles is predetermined, we provide a polynomial time algorithm. For the general problem, we prove that it is NP-hard (in the ordinary sense) and present a pseudo-polynomial time algorithm. A fully polynomial time approximation scheme for the general problem is obtained by converting an especially designed pseudo-polynomial dynamic programming algorithm.  相似文献   

5.
6.
Lot-sizing with production and delivery time windows   总被引:3,自引:0,他引:3  
We study two different lot-sizing problems with time windows that have been proposed recently. For the case of production time windows, in which each client specific order must be produced within a given time interval, we derive tight extended formulations for both the constant capacity and uncapacitated problems with Wagner-Whitin (non-speculative) costs. For the variant with nonspecific orders, known to be equivalent to the problem in which the time windows can be ordered by time, we also show equivalence to the basic lot-sizing problem with upper bounds on the stocks. Here we derive polynomial time dynamic programming algorithms and tight extended formulations for the uncapacitated and constant capacity problems with general costs. For the problem with delivery time windows, we use a similar approach to derive tight extended formulations for both the constant capacity and uncapacitated problems with Wagner-Whitin (non-speculative) costs. We are most grateful for the hospitality of IASI, Rome, where part of this work was carried out. The collaboration with IASI takes place in the framework of ADONET, a European network in Algorithmic Discrete Optimization, contract n MRTN-CT-2003-504438. This text presents research results of the Belgian Program on Interuniversity Poles of Attraction initiated by the Belgian State, Prime Minister's Office, Science Policy Programming. The scientific responsibility is assumed by the authors.  相似文献   

7.
This paper addresses scheduling models in which a contribution of an individual job to the objective function is represented by the product of its processing time and a certain positional weight. We review most of the known results in the area and demonstrate that a linear assignment algorithm as part of previously known solution procedures can be replaced by a faster matching algorithm that minimizes a linear form over permutations. Our approach reduces the running time of the resulting algorithms by up to two orders, and carries over to a wider range of models, with more general positional effects. Besides, the same approach works for the models with no prior history of study, e.g., parallel machine scheduling with deterioration and maintenance to minimize total flow time.  相似文献   

8.
The first comprehensive survey paper on scheduling problems with separate setup times or costs was conducted by [Allahverdi, A., Gupta, J.N.D., Aldowaisan, T., 1999. A review of scheduling research involving setup considerations. OMEGA The International Journal of Management Sciences 27, 219–239], who reviewed the literature since the mid-1960s. Since the appearance of that survey paper, there has been an increasing interest in scheduling problems with setup times (costs) with an average of more than 40 papers per year being added to the literature. The objective of this paper is to provide an extensive review of the scheduling literature on models with setup times (costs) from then to date covering more than 300 papers. Given that so many papers have appeared in a short time, there are cases where different researchers addressed the same problem independently, and sometimes by using even the same technique, e.g., genetic algorithm. Throughout the paper we identify such areas where independently developed techniques need to be compared. The paper classifies scheduling problems into those with batching and non-batching considerations, and with sequence-independent and sequence-dependent setup times. It further categorizes the literature according to shop environments, including single-machine, parallel machines, flow shop, no-wait flow shop, flexible flow shop, job shop, open shop, and others.  相似文献   

9.
This paper considers identical parallel-machine scheduling problem with past-sequence-dependent (psd) delivery times and learning effect. In electronic manufacturing industry, an electronic component may be exposed to certain electromagnetic field and requires an extra time for eliminating adverse effect after the main processing. The extra time is modeled as past-sequence-dependent delivery time in the literature, which is proportional to the waiting time in the system. It is also observed that the learning process reflects a decrease in the processing time as a function of the number of repetitions, i.e., as a function of the job position in the sequence. In practice, one often has to deal with the scheduling problems with psd delivery times and learning effect. Identical parallel-machine setting is considered because the occurrence of resources in parallel is common in the real world. In this paper, three objectives are the minimization of the total absolute deviation of job completion times, the total load on all machines and the total completion time. We develop polynomial algorithms to optimally solve these problems.  相似文献   

10.
We consider an integrated production-distribution scheduling problem in the context of a commit-to-delivery business model. The problem is strongly NP-hard. We propose a polynomial-time heuristic algorithm and show that its worst-case performance ratio is bounded by 2 and that this bound is tight.  相似文献   

11.
This paper deals with a single machine scheduling problems with availability constraints. The unavailability of machine results from periodic maintenance activities. In our research, a periodic maintenance consists of several maintenance periods. We consider a machine should stop to maintain after a periodic time interval or to change tools after a fixed amount of jobs processed simultaneously. Each maintenance period is scheduled after a periodic time interval. We study the problems under deterministic environment and flexible maintenance considerations. Preemptive operation is not allowed. In addition, we propose a more reasonable flexible model for the real production settings. The objective is to minimize the makespan. The proposed problem is NP-hard in the strong sense and some heuristic algorithms are provided. The purpose is to present an efficient and effective heuristic algorithm so that it will be straightforward and easy to implement. Computational results show that the proposed algorithm first fit decreasing (DFF) performs well.  相似文献   

12.
This paper addresses scheduling a set of jobs on a single machine for delivery in batches to customers or to other machines for further processing. The problem is a natural extension of minimizing the sum of flow times by considering the possibility of delivering jobs in batches and introducing batch delivery costs. The scheduling objective adopted is that of minimizing the sum of flow times and delivery costs. The extended problem arises in the context of coordination between machine scheduling and a distribution system in a supply chain network. Structural properties of the problem are investigated and used to devise a branch-and-bound solution scheme. Computational experiments show significant improvements over an existing dynamic programming algorithm.  相似文献   

13.
Brucker et al. (Math Methods Oper Res 56: 407–412, 2003) have given an O(n 2)-time algorithm for the problems , outtree and , outtree . In this note, we show that their algorithm admits an O(n log n)-time implementation.  相似文献   

14.
In this paper we consider the single-machine scheduling problems with job-position-based and sum-of-processing-times based processing times. The real processing time of a job is a function of its position and the total processing time of the jobs that are in front of it in the sequence. The objective is to minimize the makespan, and to minimize the mean finish time. We prove that some special cases are polynomially solvable under some restrictions of the parameters. In addition, for some another special cases of minimization of the mean finish time and the makespan, we show that an optimal schedule is V-shaped with respect to job normal processing times. Then, we propose a heuristic based on the V-shaped property, and show through a computational experiment that it performs efficiently.  相似文献   

15.
This paper studies the single machine past-sequence-dependent (p-s-d) delivery times scheduling with general position-dependent and time-dependent learning effects. By the general position-dependent and time-dependent learning effects we mean that the actual processing time of a job is not only a function of the total normal processing times of the jobs already processed, but also a function of the job’s scheduled position. We consider the following objective functions: the makespan, the total completion time, the sum of the θθth (θ?0θ?0) power of job completion times, the total lateness, the total weighted completion time, the maximum lateness, the maximum tardiness and the number of tardy jobs. We show that the problems of minimization of the makespan, the total completion time, the sum of the θθth (θ?0θ?0) power of job completion times and the total lateness can be solved by the smallest (normal) processing time first (SPT) rule, respectively. We also show that the total weighted completion time minimization problem, the discounted total weighted completion time minimization problem, the maximum lateness minimization problem, the maximum tardiness minimization problem and the total tardiness minimization problem can be solved in polynomial time under certain conditions.  相似文献   

16.
We consider the problem of scheduling products with components on a single machine, where changeovers incur fixed costs. The objective is to minimize the weighted sum of total flow time and changeover cost. We provide properties of optimal solutions and develop an explicit characterization of optimal sequences, while showing that this characterization has recurrent properties. Our structural results have interesting implications for practitioners, primarily that the structure of optimal sequences is robust to changes in demand.  相似文献   

17.
We consider the problem of scheduling a set of jobs with different release times on parallel machines so as to minimize the makespan of the schedule. The machines have the same processing speed, but each job is compatible with only a subset of those machines. The machines can be linearly ordered such that a higher-indexed machine can process all those jobs that a lower-indexed machine can process. We present an efficient algorithm for this problem with a worst-case performance ratio of 2. We also develop a polynomial time approximation scheme (PTAS) for the problem, as well as a fully polynomial time approximation scheme (FPTAS) for the case in which the number of machines is fixed.  相似文献   

18.
We show that the O(n log n) (where n is the number of jobs) shortest processing time (SPT) sequence is optimal for the single-machine makespan and total completion time minimization problems when learning is expressed as a function of the sum of the processing times of the already processed jobs. We then show that the two-machine flowshop makespan and total completion time minimization problems are solvable by the SPT sequencing rule when the job processing times are ordered and job-position-based learning is in effect. Finally, we show that when the more specialized proportional job processing times are in place, then our flowshop results apply also in the more general sum-of-job-processing-times-based learning environment.  相似文献   

19.
We consider two single machine scheduling problems with resource dependent release times and processing times, in which the release times and processing times are linearly decreasing functions of the amount of resources consumed. The objective is to minimize the total cost of makespan and resource consumption function that is composed of release time reduction and processing time reduction. In the first problem, the cost of reducing a unit release time for each job is common. We show that the problem can be solved in polynomial time. The second problem assumes different reduction costs of job release times. We show that the problem can be reduced polynomially from the partition problem and thus, is NP-complete.  相似文献   

20.
Scheduling research has increasingly taken the concept of deterioration into consideration. In this paper, we study a single machine group scheduling problem with deterioration effect, where the jobs are already put into groups, before any optimization. We assume that the actual processing times of jobs are increasing functions of their starting times, i.e., the job processing times are described by a function which is proportional to a linear function of time. The setup times of groups are assumed to be fixed and known. For some special cases of minimizing the makespan with ready times of the jobs, we show that the problem can be solved in polynomial time for the proposed model. For the general case, a heuristic algorithm is proposed, and the computational experiments show that the performance of the heuristic is fairly accurately in obtaining near-optimal solutions. The results imply that the average percentage error of the proposed heuristic algorithm from optimal solutions is less than 3%.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号