首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
In this paper, we examine crane scheduling for ports. This important component of port operations management is studied when the non-crossing spatial constraint, which is common to crane operations, is considered. We assume that ships can be divided into holds and that cranes can move from hold to hold but jobs are not pre-emptive, so that only one crane can work on one hold or job to complete it. Our objective is to minimize the latest completion time for all jobs. We formulate this problem as an integer programming problem. We provide the proof that this problem is NP-complete and design a branch-and-bound algorithm to obtain optimal solutions. A simulated annealing meta-heuristic with effective neighbourhood search is designed to find good solutions in larger size instances. The elaborate experimental results show that the branch-and-bound algorithm runs much faster than CPLEX and the simulated annealing approach can obtain near optimal solutions for instances of various sizes.  相似文献   

2.
The paper proposes a new exact approach, based on a Branch, Bound, and Remember (BB&R) algorithm that uses the Cyclic Best First Search (CBFS) strategy, for the 1|r i |∑U i scheduling problem, a single machine scheduling problem, where the objective is to find a schedule with the minimum number of tardy jobs. The search space is reduced using new and improved dominance properties and tighter upper bounds, based on a new dynamic programming algorithm. Computational results establish the effectiveness of the BB&R algorithm with CBFS for a broad spectrum of problem instances. In particular, this algorithm was able to solve all problems instances, up to 300 jobs, while existing best known algorithms only solve problems instances up to 200 jobs. Furthermore, the BB&R algorithm with CBFS runs one to two orders of magnitude faster than the current best known algorithm on comparable instances.  相似文献   

3.
We consider the m-machine no-wait flowshop scheduling problem with the objective of minimizing a weighted sum of makespan and total completion time. For the two-machine problem, we develop a dominance relation and embed it within a proposed branch-and-bound algorithm. For the m-machine problem, we propose a heuristic. Computational experiments show that the proposed heuristic outperforms the best existing multi-criteria heuristics and the best single criterion heuristics for makespan and total completion time. The efficiency of the dominance relation and branch-and-bound algorithm is also investigated and shown to be effective.  相似文献   

4.
This article considers the problem of scheduling preemptive open shops to minimize total tardiness. The problem is known to be NP-hard. An efficient constructive heuristic is developed for solving large-sized problems. A branch-and-bound algorithm that incorporates a lower bound scheme based on the solution of an assignment problem as well as various dominance rules are presented for solving medium-sized problems. Computational results for the 2-machine case are reported. The branch-and-bound algorithm can handle problems of up to 30 jobs in size within a reasonable amount of time. The solution obtained by the heuristic has an average deviation of less than 2% from the optimal value, while the initial lower bound has an average deviation of less than 11% from the optimal value. Moreover, the heuristic finds approved optimal solutions for over 65% of the problems actually solved.  相似文献   

5.
In this paper, we consider a permutation flowshop scheduling problem with deteriorating jobs. The objective is to minimize the total tardiness of all jobs. A branch-and-bound algorithm incorporating with a dominance property and a lower bound is developed. Furthermore, two metaheuristic algorithms, the simulated annealing algorithm, and the particle swarm optimization method, are proposed. Finally, computational studies are given.  相似文献   

6.
We study a two-machine flowshop scheduling problem with time-dependent deteriorating jobs, i.e. the processing times of jobs are an increasing function of their starting time. The objective is to minimize the total completion time subject to minimum makespan. We propose a mixed integer programming model, and develop two pairwise interchange algorithms and a branch-and-bound procedure to solve the problem while using several dominance conditions to limit the size of the search tree. Several polynomial-time solvable special cases are discussed. Finally, numerical studies are performed to examine the effectiveness and the efficiency of the proposed algorithms.  相似文献   

7.
In this paper, we consider a three-machine permutation flow-shop scheduling problem where the criterion is to minimize the total completion time without idle times subject to the minimum makespan on the second machine. This problem is NP-hard while each of the objective functions alone can be optimized in polynomial time. We develop a branch-and-bound algorithm with effective branching rules and dominance properties which help to reduce the search space. By our computational experiments, the branch-and-bound algorithm is comparable to a recent mixed integer programming solver and, for some kinds of problem instances, the branch-and-bound algorithm outperforms the solver. On the other hand, the computational result would indicate that the hierarchical scheduling problems are essentially hard in both theoretical and computational points of view.  相似文献   

8.
In many real situations, it is found that if certain maintenance procedures fail to be completed prior to a pre-specified deterioration date, then the jobs will require extra time for successful completion. In this paper, a single-machine total completion time problem with step-deteriorating jobs is considered. A branch-and-bound method incorporated with several dominance properties and a lower bound is developed to derive the optimal solution for this problem. In addition, a weight-combination search algorithm is proposed to search for a near-optimal solution. Computational results indicate that the branch-and-bound algorithm can solve most of the problems with up to 24 jobs in a reasonable amount of time. Moreover, the proposed heuristic algorithm is accurate with mean deviations from the optimum value of less than 0.3%.  相似文献   

9.
In this paper, we consider a two-machine flowshop scheduling problem in which the waiting time of each job between the two machines cannot be greater than a certain time period. For the problem with the objective of minimizing makespan, we identify several dominance properties of the problem and develop a branch-and-bound (B&B) algorithm using the dominance properties. Computational tests are performed on randomly generated test problems for evaluation of performance of the B&B algorithm, and results show that the algorithm can solve problems with up to 150 jobs in a reasonable amount of CPU time.  相似文献   

10.
This paper addresses the NP-hard problem of scheduling N jobs on a single machine with due dates, sequence-dependent setup times and no preemption where the objective is to minimize the maximum tardiness. An algorithm based on branch-and-bound permutation schemes is developed including the implementation of lower and upper bounding procedures, and three dominance rules. Computational experiments demonstrate the effectiveness of the algorithm. In the experiments, the impacts of control parameters to generate test instances on algorithm performance (CPU times) are studied by statistics methods.  相似文献   

11.
The scheduling of maintenance activities has been extensively studied, with most studies focusing on single-machine problems. In real-world applications, however, multiple machines or assembly lines process numerous jobs simultaneously. In this paper, we study a parallel-machine scheduling problem in which the objective is to minimize the total tardiness given that there is a maintenance activity on each machine. We develop a branch-and-bound algorithm to solve the problem with a small problem size. In addition, we propose a hybrid genetic algorithm to obtain the approximate solutions when the number of jobs is large. The performance of the proposed algorithms is evaluated based mainly on computational results.  相似文献   

12.
This paper investigates a single machine serial-batching scheduling problem considering release times, setup time, and group scheduling, with the combined effects of deterioration and truncated job-dependent learning. The objective of the studied problem is to minimize the makespan. Firstly, we analyze the special case where all groups have the same arrival time, and propose the optimal structural properties on jobs sequencing, jobs batching, batches sequencing, and groups sequencing. Next, the corresponding batching rule and algorithm are developed. Based on these properties and the scheduling algorithm, we develop a hybrid VNS–ASHLO algorithm incorporating variable neighborhood search (VNS) and adaptive simplified human learning optimization (ASHLO) algorithms to solve the general case of the studied problem. Computational experiments on randomly generated instances are conducted to compare the proposed VNS–ASHLO with the algorithms of VNS, ASHLO, Simulated Annealing (SA), and Particle Swarm Optimization (PSO). The results based on instances of different scales show the effectiveness and efficiency of the proposed algorithm.  相似文献   

13.
This paper considers the problem of scheduling a given number of jobs on a single machine to minimize the sum of maximum earliness and maximum tardiness when sequence-dependent setup times exist (1∣ST sd ETmax). In this paper, an optimal branch-and-bound algorithm is developed that involves the implementation of lower and upper bounding procedures as well as three dominance rules. For solving problems containing large numbers of jobs, a polynomial time-bounded heuristic algorithm is also proposed. Computational experiments demonstrate the effectiveness of the bounding and dominance rules in achieving optimal solutions in more than 97% of the instances.  相似文献   

14.
研究带有准备时间的单机学习效应模型,其中工件加工时间具有指数时间学习效应,即工件的实际加工时间是已经排好的工件加工时间的指数函数。学习效应模型考虑工件的实际加工时间同时依赖于工件本身的加工时间和已加工工件的累计加工时间,目标函数为最小化总完工时间。这个问题是NP-难的,提出了一个数学规划模型来求解该问题的最优解。通过分析几个优势性质和下界,提出分支定界算法来求解此问题,并设计启发式算法改进分支定界算法的上界值。通过仿真实验验证了分支定界算法在求解质量和时间方面的有效性。  相似文献   

15.
This paper addresses scheduling a set of jobs on a single machine for delivery in batches to one customer or to another machine for further processing. The problem is a natural extension of that of minimising the sum of weighted flow times, considering the possibility of delivering jobs in batches and introducing batch delivery costs. The scheduling objective adopted is that of minimising the sum of weighted flow times and delivery costs. The extended problem arises in the context of coordination between machine scheduling and a distribution system in a supply chain network. Structural properties of the problem are investigated and used to devise a branch-and-bound solution method. For the special case, when the maximum number of batches is fixed, the branch-and-bound scheme provided shows significant improvements over an existing dynamic-programming algorithm.  相似文献   

16.
Deteriorating jobs scheduling problems have been extensively studied in recent years. However, it is assumed that there is a common goal to minimize for all jobs in most of the research. In many management situations, multiple agents compete on the usage of a common processing resource. In this paper, we considered a single-machine scheduling problem with a linear deterioration assumption where the objective is to minimize the total weighted completion time of jobs from the first agent with the restriction that no tardy job is allowed for the second agent. We proposed a branch-and-bound algorithm and three heuristic algorithms to search for the optimal solution and near-optimal solutions, respectively. A computational experiment was conducted to evaluate the performance of the proposed algorithms.  相似文献   

17.
This paper considers the problem of scheduling a given number of jobs on a single machine to minimize total earliness and tardiness when family setup times exist. The paper proposes optimal branch-and-bound algorithms for both the group technology assumption and if the group technology assumption is removed. A heuristic algorithm is proposed to solve larger problems with the group technology assumption removed. The proposed algorithms were empirically evaluated on problems of various sizes and parameters. The paper also explores how the choice of procedure affects total earliness and tardiness if an implementation of lean production methods has resulted in a reduction in setup times. An important finding of these empirical investigations is that scheduling jobs by removing the group technology assumption can significantly reduce total earliness and tardiness.  相似文献   

18.
This paper focuses on the single machine sequencing and common due-date assignment problem for the objective of minimizing the sum of the penalties associated with earliness, tardiness and due-date assignment. Unlike the previous research articles on this class of scheduling problem, we consider sequence-dependent setup times that make the problem much more difficult. To solve the problem, a branch and bound algorithm, which incorporates the method to obtain lower and upper bounds as well as a dominance property to reduce the search space, is suggested that gives the optimal solutions for small-sized instances. Heuristic algorithms are suggested to obtain solutions for large-sized problems within a reasonable computation time. The performances of both the optimal and heuristic algorithms, in computational experiments on randomly generated test instances, are reported.  相似文献   

19.
The problem of scheduling jobs on a single machine subject to given release dates and due dates is considered. A new algorithm of the branch-and-bound type for solving this problem is proposed. The approach used in the paper is fully based on the eliminative properties of a block of jobs and in contradiction to the existing algorithms, it does not require any heuristic method to generate a current solution in a search tree. However, a heuristic may be used in order to obtain a good initial solution. Extensive computational experiments show a high efficiency of the algorithm.  相似文献   

20.
This paper addresses a bi-criteria two-machine flowshop scheduling problem when the learning effect is present. The objective is to find a sequence that minimizes a weighted sum of the total completion time and the maximum tardiness. In this article, a branch-and-bound method, incorporating several dominance properties and a lower bound, is presented to search for the exact solution for small job-size problems. In addition, two heuristic algorithms are proposed to overcome the inefficiency of the branch-and-bound algorithm for large job-size problems. Finally, computational results for this problem are provided to evaluate the performance of the proposed algorithms.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号