首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
井彩霞  张磊  刘烨 《运筹与管理》2014,23(4):133-138
考虑需要安装时间的平行多功能机排序问题。在该模型中,每个工件对应机器集合的一个子集,其只能在这个子集中的任一台机器上加工,称这个子集为该工件的加工集合;工件分组,同组工件具有相同的加工时间和加工集合,不同组中的工件在同一台机器上连续加工需要安装时间,目标函数为极小化最大完工时间。对该问题NP-难的一般情况设计启发式算法:首先按照特定的规则将所有工件组都整组地安排到各台机器上,然后通过在各机器间转移工件不断改进当前最大完工时间。通过与下界的比较检验算法的性能,大量的计算实验表明,算法是实用而有效的。  相似文献   

2.
In this paper, we consider a machine scheduling problem where jobs should be completed at times as close as possible to their respective due dates, and hence both earliness and tardiness should be penalized. Specifically, we consider the problem with a set of independent jobs to be processed on several identical parallel machines. All the jobs have a given common due window. If a job is completed within the due window, then there is no penalty. Otherwise, there is either a job-dependent earliness penalty or a job-dependent tardiness penalty depending on whether the job is completed before or after the due window. The objective is to find an optimal schedule with minimum total earliness–tardiness penalty. The problem is known to be NP-hard. We propose a branch and bound algorithm for finding an optimal schedule of the problem. The algorithm is based on the column generation approach in which the problem is first formulated as a set partitioning type formulation and then in each branch and bound iteration the linear relaxation of this formulation is solved by the standard column generation procedure. Our computational experiments show that this algorithm is capable of solving problems with up to 40 jobs and any number of machines within a reasonable computational time.  相似文献   

3.
We consider the problem of scheduling a set of jobs with different release times on parallel machines so as to minimize the makespan of the schedule. The machines have the same processing speed, but each job is compatible with only a subset of those machines. The machines can be linearly ordered such that a higher-indexed machine can process all those jobs that a lower-indexed machine can process. We present an efficient algorithm for this problem with a worst-case performance ratio of 2. We also develop a polynomial time approximation scheme (PTAS) for the problem, as well as a fully polynomial time approximation scheme (FPTAS) for the case in which the number of machines is fixed.  相似文献   

4.
带服务器的三台平行机排序问题的复杂性和近似算法   总被引:1,自引:0,他引:1  
讨论带有两具服务器的三台机的平行机排序问题,在这个问题的实例中,每一个工件都有一个时间长度 安装操作必须要由服务器来完成,每一个服务器在同一时刻只能安装一个工件,用三段式描述表示此问题即为P3,S2/si=1/Cmax,证明了此问题为NP-C的,分别给出了在在线和离线条件下的近似算法,并且估计了算法的最坏情况界。  相似文献   

5.
Problems of scheduling nonpreemptable jobs which require simultaneously a machine from a set of parallel, identical machines and a continuous, renewable resource are considered. For each job there are known: its processing speed as a continuous, concave function of a continuous resource allotted at a time and its processing demand. The optimization criterion is the schedule length. The problem can be decomposed into two interrelated subproblems: (i) to sequence jobs on machines, and (ii) to find an optimal (continuous) resource allocation among jobs already sequenced. Problem (ii) can be formulated as a convex programming problem with linear constraints and solved using proper solvers. Thus, the problem remains to generate a set of all feasible sequences of jobs on machines (this guarantees finding an optimal schedule in the general case). However, the cardinality of this set grows exponentially with the number of jobs. Thus, we propose to use heuristic search methods defined on the space of feasible sequences. Three metaheuristics: tabu search (TS), simulated annealing (SA) and genetic algorithm (GA) have been implemented and compared computationally with a random sampling technique. The computational experiment has been carried out on an SGI PowerChallenge XL computer with 12 RISC R8000 processors. Some directions for further research have been pointed out.  相似文献   

6.
提出需要安装时间的多功能机排序问题,一般情况下,这是NP-困难的;主要研究只有两台机器时一些特殊情况下的计算复杂性.根据加工集合为机器全集的工件组数的不同,分别给出多项式时间算法和分枝定界算法.对各工件组的工件数和加工时间都相等的情况,给出一个多项式时间的最优算法-奇偶算法,从而证明此问题是多项式时间可解的.  相似文献   

7.
Discrete–continuous problems of scheduling nonpreemptable jobs on parallel machines are considered. The problems arise e.g. when jobs are assigned to multiple parallel processors driven by a common electric, hydraulic or pneumatic power source. Existing models have assumed job processing rates as a function of the number of jobs currently being processed, or equivalently the number of machines currently in operation. In this paper a more general model is proposed in which processing rates of a job assigned to a machine depend on the amount of a continuous, i.e. continuously divisible resource (e.g. power) allotted to this job at a time. Thus the problem consists of two interrelated subproblems: (i) to sequence jobs on machines, and (ii) to allocate the continuous resource among jobs already sequenced. We provide a comprehensive analysis of the problem. This includes properties of optimal schedules, efficiently (in particular analytically) solvable cases, formulations of the possibly simplest mathematical programming problems for finding optimal schedules in the general case, heuristics and the worst-case analysis. Although our objective function in this paper is to minimize makespan of a set of independent jobs, the presented methodology can be applied to other criteria, precedence-related jobs, and many resource types (apart from, or instead of machines).  相似文献   

8.
We consider a scheduling problem with two identical parallel machines and n jobs. For each job we are given its release date when job becomes available for processing. All jobs have equal processing times. Preemptions are allowed. There are precedence constraints between jobs which are given by a (di)graph consisting of a set of outtrees and a number of isolated vertices. The objective is to find a schedule minimizing mean flow time. We suggest an O(n2) algorithm to solve this problem.The suggested algorithm also can be used to solve the related two-machine open shop problem with integer release dates, unit processing times and analogous precedence constraints.  相似文献   

9.
Under consideration is some optimization problem of data transmission in a hierarchical acyclic network. This problem is a special case of the makespan minimization problem with multiprocessor jobs on dedicated machines.We study computational complexity of the subproblems with a specific set of job types, where the type of a job is a subset of the machines required by the job.  相似文献   

10.
This paper develops a branch and bound algorithm for the two-stage assembly scheduling problem. In this problem, there are m machines at the first stage, each of which produces a component of a job. When all m components are available, a single assembly machine at the second stage completes the job. The objective is to schedule the jobs on the machines so that the maximum completion time, or makespan, is minimized. A lower bound based on solving an artificial two-machine flow shop problem is derived. Also, several dominance theorems are established and incorporated into the branch and bound algorithm. Computational experience with the algorithm is reported for problems with up to 8000 jobs and 10 first-stage machines.  相似文献   

11.
This paper studies a non-preemptive infinite-horizon scheduling problem with a single server and a fixed set of recurring jobs. Each job is characterized by two given positive numbers: job duration and maximum allowable time between the job completion and its next start. We show that for a feasible problem there exists a periodic schedule. We also provide necessary conditions for the feasibility, formulate an algorithm based on dynamic programming, and, since this problem is NP-hard, formulate and study heuristic algorithms. In particular, by applying the theory of Markov Decision Process, we establish natural necessary conditions for feasibility and develop heuristics, called frequency based algorithms, that outperform standard scheduling heuristics.  相似文献   

12.
This paper investigates a distributionally robust scheduling problem on identical parallel machines, where job processing times are stochastic without any exact distributional form. Based on a distributional set specified by the support and estimated moments information, we present a min-max distributionally robust model, which minimizes the worst-case expected total flow time out of all probability distributions in this set. Our model doesn’t require exact probability distributions which are the basis for many stochastic programming models, and utilizes more information compared to the interval-based robust optimization models. Although this problem originates from the manufacturing environment, it can be applied to many other fields when the machines and jobs are endowed with different meanings. By optimizing the inner maximization subproblem, the min-max formulation is reduced to an integer second-order cone program. We propose an exact algorithm to solve this problem via exploring all the solutions that satisfy the necessary optimality conditions. Computational experiments demonstrate the high efficiency of this algorithm since problem instances with 100 jobs are optimized in a few seconds. In addition, simulation results convincingly show that the proposed distributionally robust model can hedge against the bias of estimated moments and enhance the robustness of production systems.  相似文献   

13.
本文研究工件有到达时间且可拒绝下的同类平行机排序问题。在该问题中, 给定一个待加工工件集, 每个工件在到达之后, 可以被选择安排到$m$台同类平行机器中的某一台机器上进行加工, 也可以被选择拒绝加工, 但需支付一定的拒绝惩罚费用。目标函数是最小化接受工件集的最大完工时间与拒绝工件集的总拒绝费用之和。当$m$为固定常数时, 设计了一个伪多项式时间动态规划精确算法; 当$m$为任意输入时, 设计了一个近似算法, 当接受工件个数大于$(m-1)$时, 该算法近似比为3, 当接受工件个数小于$(m-1)$时, 该算法近似比为$(2+\rho)$, 其中$\rho$为机器加工速度最大值和最小值的比值。最后通过算例演示了算法的运行。  相似文献   

14.
本文研究工件有到达时间且可拒绝下的同类平行机排序问题。在该问题中, 给定一个待加工工件集, 每个工件在到达之后, 可以被选择安排到$m$台同类平行机器中的某一台机器上进行加工, 也可以被选择拒绝加工, 但需支付一定的拒绝惩罚费用。目标函数是最小化接受工件集的最大完工时间与拒绝工件集的总拒绝费用之和。当$m$为固定常数时, 设计了一个伪多项式时间动态规划精确算法; 当$m$为任意输入时, 设计了一个近似算法, 当接受工件个数大于$(m-1)$时, 该算法近似比为3, 当接受工件个数小于$(m-1)$时, 该算法近似比为$(2+\rho)$, 其中$\rho$为机器加工速度最大值和最小值的比值。最后通过算例演示了算法的运行。  相似文献   

15.
Parallel machine scheduling problems with a single server   总被引:3,自引:0,他引:3  
In this paper, we consider the problem of scheduling jobs on parallel machines with setup times. The setup has to be performed by a single server. The objective is to minimize the schedule length (makespan), as well as the forced idle time. The makespan problem is known to be NP-hard even for the case of two identical parallel machines. This paper presents a pseudopolynomial algorithm for the case of two machines when all setup times are equal to one. We also show that the more general problem with an arbitrary number of machines is unary NP-hard and analyze some list scheduling heuristics for this problem. The problem of minimizing the forced idle time is known to be unary NP-hard for the case of two machines and arbitrary setup and processing times. We prove unary NP-hardness of this problem even for the case of constant setup times. Moreover, some polynomially solvable cases are given.  相似文献   

16.
We consider a problem of scheduling n independent jobs on m unrelated parallel machines with the objective of minimizing total tardiness. Processing times of a job on different machines may be different on unrelated parallel-machine scheduling problems. We develop several dominance properties and lower bounds for the problem, and suggest a branch and bound algorithm using them. Results of computational experiments show that the suggested algorithm gives optimal solutions for problems with up to five machines and 20 jobs in a reasonable amount of CPU time.  相似文献   

17.
In this paper we consider the problem of scheduling a set of simultaneously available jobs on several parallel and identical machines. The problem is to find the optimal due-date, assuming this to be the same for all jobs. We also seek to sequence the jobs such that some are early and some are late so as to minimize a penalty function. For the single-machine problem, we present a simple proof of the well-known optimality result that the optimal due-date coincides with one of the job completion times. We show that the optimal job sequence for the single-machine problem can be easily determined. We prove that the same optimal due-date result can be generalized to the parallel-machine problem. However, determination of the optimal job sequence for such a problem is much more complex, and we present a simple heuristic to find an approximate solution. On the basis of a limited experiment, we observe that the heuristic is very effective in obtaining near-optimal solutions.  相似文献   

18.
We propose a column generation based exact decomposition algorithm for the problem of scheduling n jobs with an unrestrictively large common due date on m identical parallel machines to minimize total weighted earliness and tardiness. We first formulate the problem as an integer program, then reformulate it, using Dantzig–Wolfe decomposition, as a set partitioning problem with side constraints. Based on this set partitioning formulation, a branch and bound exact solution algorithm is developed for the problem. In the branch and bound tree, each node is the linear relaxation problem of a set partitioning problem with side constraints. This linear relaxation problem is solved by column generation approach where columns represent partial schedules on single machines and are generated by solving two single machine subproblems. Our computational results show that this decomposition algorithm is capable of solving problems with up to 60 jobs in reasonable cpu time.  相似文献   

19.
This paper deals with a problem of determining lot-sizes of jobs in a real-world job shop-scheduling in the presence of uncertainty. The main issue discussed in this paper is lot-sizing of jobs. A fuzzy rule-based system is developed which determines the size of lots using the following premise variables: size of the job, the static slack of the job, workload on the shop floor, and the priority of the job. Both premise and conclusion variables are modelled as linguistic variables represented by using fuzzy sets (apart from the priority of the job which is a crisp value). The determined lots’ sizes are input to a fuzzy multi-objective genetic algorithm for job shop scheduling. Imprecise jobs’ processing times and due dates are modelled by using fuzzy sets. The objectives that are used to measure the quality of the generated schedules are average weighted tardiness of jobs, the number of tardy jobs, the total setup time, the total idle time of machines and the total flow time of jobs. The developed algorithm is analysed on real-world data obtained from a printing company.  相似文献   

20.
研究带批运输的两台同型机排序问题. 在该问题中,工件在两台同型机上加工,完工的工件由一辆容量为z的车运输到客户. 这里假设工件有不同的物理大小,目标是求一个时间表使得所有工件送达客户且车回到机器所在位置的时间最小,给出了一个(14/9+ε)-近似算法  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号