首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
2.
We consider the problem of scheduling a set of dependent jobs on a single machine with the maximum completion time criterion. The processing time of each job is variable and decreases linearly with respect to the starting time of the job. Applying a uniform approach based on the calculation of ratios of expressions that describe total processing times of chains of jobs, we show basic properties of the problem. On the basis of these properties, we prove that if precedence constraints among jobs are in the form of a set of chains, a tree, a forest or a series–parallel digraph, the problem can be solved in O(n log n) time, where n denotes the number of the jobs.  相似文献   

3.
We consider the problem of scheduling unit-length jobs on identical machines subject to precedence constraints. We show that natural scheduling rules fail when the precedence constraints form a collection of stars or a collection of complete bipartite graphs. We prove that the problem is in fact NP-hard on collections of stars when the input is given in a compact encoding, whereas it can be solved in polynomial time with standard adjacency list encoding. On a subclass of collections of stars and on collections of complete bipartite graphs we show that the problem can be solved in polynomial time even when the input is given in compact encoding, in both cases via non-trivial algorithms.  相似文献   

4.
5.
We consider two problems of scheduling a set of independent, non-preemptable and proportionally deteriorating jobs on a single machine. In the first problem, the machine is not continuously available for processing but the number of non-availability periods, the start time and end time of each period are known in advance. In the second problem, the machine is available all the time but for each job a ready time and a deadline are defined. In both problems the criterion of schedule optimality is the maximum completion time. We show that the decision version of the first (the second) problem is NP-complete in the ordinary or in the strong sense, depending on the number of non-availability periods (the number of ready times and deadlines).  相似文献   

6.
This paper studies a single machine scheduling problem simultaneously with deteriorating jobs and learning effects. The objectives are to minimize the makespan and the number of tardy jobs, respectively. Two polynomial time algorithms are proposed to solve these problems optimally.  相似文献   

7.
In this paper a problem of scheduling a single machine under linear deterioration which aims at minimizing the number of tardy jobs is considered. According to our assumption, processing time of each job is dependent on its starting time based on a linear function where all the jobs have the same deterioration rate. It is proved that the problem is NP-hard; hence a branch and bound procedure and a heuristic algorithm with O(n 2) is proposed where the heuristic one is utilized for obtaining the upper bound of the B&B procedure. Computational results for 1,800 sample problems demonstrate that the B&B method can solve problems with 28 jobs quickly and in some other groups larger problems are also solved. Generally, B&B method can optimally solve 85% of the samples which shows high performance of the proposed method. Also it is shown that the average value of the ratio of optimal solution to the heuristic algorithm result with the objective ??(1 ? Ui) is at most 1.11 which is more efficient in comparison to other proposed algorithms in related studies in the literature.  相似文献   

8.
We consider several single machine scheduling problems in which the processing time of a job is a linear function of its starting time and jobs can be rejected by paying penalties. The objectives are to minimize the makespan, the total weighted completion time and the maximum lateness/tardiness plus the total penalty of the rejected jobs. We show that these problems are NP-hard, and design algorithms based on dynamic programming (including pseudo-polynomial time optimal algorithms and fully polynomial time approximation schemes) to solve them.  相似文献   

9.
A set of n nonpreemptive tasks are to be scheduled on m parallel dedicated machines with a regular criterion. Chain precedence constraints among the tasks, deterministic processing times and processing machine of each task are given.  相似文献   

10.
《Applied Mathematical Modelling》2014,38(21-22):5231-5238
In this study we consider unrelated parallel machines scheduling problems with learning effect and deteriorating jobs, in which the actual processing time of a job is a function of joint time-dependent deterioration and position-dependent learning. The objective is to determine the jobs assigned to corresponding each machine and the corresponding optimal schedule to minimize a cost function containing total completion (waiting) time, total absolute differences in completion (waiting) times and total machine load. If the number of machines is a given constant, we show that the problems can be solved in polynomial time under the time-dependent deterioration and position-dependent learning model.  相似文献   

11.
In many real-life applications, job processing times are a function of the waiting time prior to their execution. In the most general setting, each job comprises of a basic processing time, which is independent of its start time, and a start time-dependent deterioration function. Some common examples of deteriorating systems include fire fighting, pollution containment, and medical treatments. To date, research has focused on scheduling models where the basic processing time of jobs is constant. However, job processing times are often controllable through the allocation of a limited non-renewable resource. We study a single-machine setting that combines these two models under the assumptions of general linear deterioration and convex resource functions. We develop a polynomial time solution for minimizing the makespan. For the total flowtime criterion, we compute the optimal resource allocation policy for a given job instance and show that the sequencing problem is at least as hard as the case with non-controllable jobs. We follow by discussing the properties of several special cases.  相似文献   

12.
This paper is concerned with a new model in deterministic scheduling theory, where certain tasks may require more than one processor at a time. This model is motivated by several applications of multimicroprocessor systems and it has received much attention in the last years. In the paper it is assumed that each task can be processed on any processor subset of a given task-dependent size. Tasks are nonpreemptable and there are precedence constraints among them. It is proved that the problem of minimizing schedule length is NP-hard for three processors even if all the tasks have unit processing times and precedence constraints form a set of chains. Thus, it is unlikely to be solvable in polynomial time. On the other hand, two low order polynomial-time algorithms are given for the m processor case if processor requirements of the tasks in each chain are either uniform or monotonically decreasing (increasing).  相似文献   

13.
We present a polynomial algorithm for a family of single-machine scheduling problems with mixed variable job processing times, $k$ -partite job precedence constraints and the maximum cost criterion, provided that job processing times satisfy certain assumptions.  相似文献   

14.
《Discrete Applied Mathematics》2004,134(1-3):141-168
We study the problem of scheduling groups of tasks with precedence constraints on three dedicated processors. Each task requires a specified set of processors. Up to three precedence constraints are considered among groups of tasks requiring the same set of processors. The objective of the problem is to find a nonpreemptive schedule which minimizes the maximum completion time (makespan). This scheduling problem is equivalent to the problem of finding an extension of the constraint graph (i.e. the graph which represents the conflicts between tasks and the precedence constraints) to a comparability graph with minimum (over all the extensions) maximum clique weight. The problem is NP-hard in the strong sense. A normal schedule is such that all the tasks requiring the same set of processors are scheduled consecutively. With a normal schedule the problem reduces to the quotient graph of the constraint graph. In this paper we obtain tight approximation results for the minimum makespan of a normal schedule through tight results on the minimum increase of the maximum clique weight when the (partially oriented) quotient graph is extended to a comparability graph.  相似文献   

15.
16.
This paper is concerned with two-machine no-wait flow shop scheduling problems in which the actual processing time of each job is a proportional function of its starting time and each machine may have non-availability intervals. The objective is to minimize the makespan. We assume that the non-availability intervals are imposed on only one machine. Moreover, the number of non-availability intervals, the start time and end time of each interval are known in advance. We show that the problem with a single non-availability interval is NP-hard in the ordinary sense and the problem with an arbitrary number of non-availability intervals is NP-hard in the strong sense.  相似文献   

17.
Consider a set of jobs where an arbitrary precedence relationship exists among the jobs and a cost is associated with every permutation of the jobs. The objective is to find a minimum-cost permutation which is consistent with the precedence relations. A class of problems is studied which includes the least-cost fault detection problem, the one-machine total weighted completion time problem, and the two-machine maximum flow-time problem.Transformations are developed which systematically reduce the size of the general precedence-constrained problem. This process continues until either the problem is solved or no further reductions are possible. The worst-case effectiveness of these transformations is analyzed in detail. These results generalize the majority of work previously done on efficient sequencing with precedence constraints.  相似文献   

18.
Multi-machine scheduling with deteriorating jobs and scheduled maintenance   总被引:1,自引:0,他引:1  
In this paper, we investigate a multi-machine scheduling problem in which job processing times are increasing functions of their starting times and machines are not always available. Job processing times are assumed to follow simple linear deteriorations. Moreover, each machine is assumed to have a maintenance period which is known in advance. Both the resumable and non-resumable cases are discussed with the objective of minimizing the makespan. A lower bound and a heuristic algorithm are derived for each case. Numerical results are also provided to evaluate the efficiency of the proposed procedures.  相似文献   

19.
In this paper we study the problem of scheduling n deteriorating jobs on m identical parallel machines. Each job's processing time is a nondecreasing function of its start time. The problem is to determine an optimal combination of the due-date and schedule so as to minimize the sum of the due-date, earliness and tardiness penalties. We show that this problem is NP-hard, and we present a heuristic algorithm to find near-optimal solutions for the problem. When the due-date penalty is 0, we present a polynomial time algorithm to solve it.  相似文献   

20.
In this paper, we consider two single-machine rescheduling problems with linear deteriorating jobs under disruption. By a deteriorating jobs, we mean that the actual processing time of the job is an increasing function of its starting time. The two problems correspond to two different increasing linear function. Rescheduling means a set of original jobs has already been scheduled to minimize some classical objective, then a new set of jobs arrives and creates a disruption. We consider the rescheduling problem to minimize the total completion time under a limit of the disruption from the original scheduling. For each problem, we consider two versions. For each version, the polynomial algorithms are proposed, respectively.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号