共查询到20条相似文献,搜索用时 0 毫秒
1.
考虑由两个代理引起的重新排序问题,其中每个代理都在公共的加工资源下完成各自的不可中断加工的工件.每个代理要求在仅依赖工件的完工时间时最小化某一个特定的目标函数.考虑在原始工件的完工时间限制下的两个代理的单机最小化最大延误时间的重新排序问题.证明了该问题能在多项式时间或者拟多项式时间内解决. 相似文献
2.
研究具有禁用区间的单机最小化加权完工时间和排序问题.在该问题中,有一些禁用区间已经固定在机器上,工件将被安排在其余自由区间内进行加工且不能与禁用区间重叠.在文献中已经证明,该问题是强NP-困难的,并且在P不等于NP的假设下,该问题不存在2~(q(n))-近似算法.其中,n是工件个数,而q(n)是n的任一多项式.但是,其精确最优算法尚属未知.给出了该问题的一个动态规划最优算法.当禁用区间的数目是固定常数时,该算法是拟多项式的. 相似文献
3.
《数学季刊》2014,(2)
It is known that the problem of minimizing total weighted completion time on a series-batching machine is NP-hard. We consider a series-batching bicriteria scheduling problem of minimizing makespan and total weighted completion time with equal length job simultaneously. A batching machine can handle up to b jobs in a batch, where b is called the batch capacity of the machine. We study the unbounded model with b ≥ n, where n denotes the number of jobs. A dynamic programming algorithm is proposed to solve the unbounded model, which can find all Pareto optimal schedules in O(n3) time. 相似文献
4.
有两个代理A和B, 每个代理都各自有一个工件集. 同一个代理的工件可以在同一批中加工, 而且每一个代理都有一个需要最小化的函数. 研究在无界平行分批处理机上同时最小化代理A的最大费用和代理B的最大完工时间问题, 并给出一个算法, 它可在多项式时间内找到关于这个问题的所有Pareto最优点. 相似文献
5.
Baker和Nuttle提出了下述单可变资源排序问题:扎个工件利用某个单资源进行加工使得工件的完工时间的某个函数达到最小,而资源的可利用率是随着时间而变化的.当最小化的目标函数是工件的加权完工时间和时,Baker和Nuttle猜测该问题是NP-困难的.最近,Yuan、Cheng和Ng证明该问题在一般意义下是NP-困难的,但是问题的精确复杂性仍然是悬而未决的.本文我们证明了该问题是强NP-困难的. 相似文献
6.
Baker和Nuttle提出了下述单可变资源排序问题:$n$个工件利用某个单资源进行加工使得工件的完工时间的某个函数达到最小,而资源的可利用率是随着时间而变化的.当最小化的目标函数是工件的加权完工时间和时,Baker和Nuttle猜测该问题是NP-困难的.最近,Yuan、Cheng 和 Ng 证明该问题在一般意义下是NP-困难的,但是问题的精确复杂性仍然是悬而未决的.本文我们证明了该问题是强NP-困难的. 相似文献
7.
8.
In the rescheduling on a single machine, a set of the original jobs has already been scheduled, in order to make a given objective function is optimal. The decision maker needs to insert the new jobs into the existing schedule without excessively disrupting it. A batching machine is a machine that can handle up to some jobs simultaneously. In this paper,we consider the total completion time under a limit on the sequence disruptions for parallel batching based on rescheduling. For the parallel batching problem based on rescheduling, we research the properties of feasible schedules and optimal schedules on the total completion time under a limit on the maximum time disruptions or total time disruptions, in which the jobs are sequenced in SPT order, and give out the pseudo-polynomial time algorithms on the number of jobs and the processing time of jobs by applying the dynamic programming method. 相似文献
9.
10.
11.
极小化加权总完工时间的分批排序问题 总被引:11,自引:0,他引:11
本文讨论了分批排序中极小化加权总完工时间的两个问题.就所有工件的加工时间都相等这一特殊情况,分别给出两个算法,并证明了算法的最优性. 相似文献
12.
资源有限的加权总完工时间单机排序问题 总被引:1,自引:0,他引:1
本讨论资源有限的加权总工时间单机排序问题,对现在仍为OPEN问题1|pj=bj-ajuj,∑uj≤U|∑wjCj给出了一个有关最优解中最优资源分配的重要性质,并利用该性质分别给出了三种情况bj=b,wj=w,aj=a;bj=b,wj=w,uj=u;aj=a,wj=w,uj=u的最优算法。 相似文献
13.
14.
15.
王吉波 《数学的实践与认识》2005,35(8):89-93
讨论了2台机器调整时间可分离的FlowShop排序问题,目标函数为极小化加权完工时间和.给出了对于一种特殊情况,问题存在多项式最优算法的充分条件.接着又给出了求解该问题的一个分枝定界法. 相似文献
16.
17.
考虑了当每分一批均产生固定费用、批容量有界且为固定值b、加工不允许中断抢先.所有工件在零时刻到达时的单机平行分批排序问题.目标是最小化总完工时间与分批费用之和.利用动态规划方法给出了多项式时间算法,时间界为O(n~(b(b-1))). 相似文献
18.
考虑工件可自由下线最小化总完工时间的有界平行分批排序问题. 在该问题中, 一台平行批机器可以同时处理 b 个工件作为一个平行批, 这里b 是批容量, 一个批的加工时间等于分配给这个批的工件的最大加工时间. 关于可自由下线工件, 每一个工件的完工时间等于包含这个工件的批的开工时间与工件的加工时间的和. 也就是, 如果一个批B 有一个开工时间S, 那么包含在批B 中的每一个工件J_j 的开工时间定义为S, 而它的完工时间定义为S+p_j, 这里p_j 是工件J_j 的加工时间. 对此问题, 首先研究最优排序的一些性质. 然后, 基于这些性质, 给出一个运行时间为O(n^{b (b-1)})的动态规划算法. 相似文献
19.