首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到13条相似文献,搜索用时 15 毫秒
1.
Line-integrated supermarkets constitute a novel in-house parts logistics concept for feeding mixed-model assembly lines. In this context, supermarkets are decentralized logistics areas located directly in each station. Here, parts are withdrawn from their containers by a dedicated logistics worker and sorted just-in-sequence (JIS) into a JIS-bin. From this bin, assembly workers fetch the parts required by the current workpiece and mount them during the respective production cycle. This paper treats the scheduling of the part supply processes within line-integrated supermarkets. The scheduling problem for refilling the JIS-bins is formalized and a complexity analysis is provided. Furthermore, a heuristic decomposition approach is presented and important managerial aspects are investigated.  相似文献   

2.
Manufacturers in a wide range of industries nowadays face the challenge of providing a rich product variety at a very low cost. This typically requires the implementation of cost efficient, flexible production systems. Often, so called mixed-model assembly lines are employed, where setup operations are reduced to such an extent that various models of a common base product can be manufactured in intermixed sequences. However, the observed diversity of mixed-model lines makes a thorough sequence planning essential for exploiting the benefits of assembly line production. This paper reviews and discusses the three major planning approaches presented in the literature, mixed-model sequencing, car sequencing and level scheduling, and provides a hierarchical classification scheme to systematically record the academic efforts in each field and to deduce future research issues.  相似文献   

3.
With increasing cost competition and product variety, providing an efficient just-in-time (JIT) supply has become one of the greatest challenges in the use of mixed-model assembly line production systems. In the present paper, therefore, we propose a new approach for scheduling JIT part supply from a central storage center. Usually, materials are stored in boxes that are allotted to the consumptive stations of the line by a forklift. For such a real-world problem, a new model, a complexity proof as well as different exact and heuristic solution procedures are provided. Furthermore, a direct comparison with a simple two-bin kanban system is provided. Such a system is currently applied in the real-world industrial process that motivates our research. It becomes obvious that this policy is considerably outperformed according to the resulting inventory- and α-service levels. Moreover, at the interface between logistics and assembly operations, strategic management implications are obtained. Specifically, based on the new approach, it is the first time a statistical analysis is being made as to whether widespread Level Scheduling policies, which are well-known from the Toyota Production System, indeed facilitate material supply. Note that in the literature it is frequently claimed that this causality exists.  相似文献   

4.
Nowadays, mixed-model assembly lines are applied in a wide range of industries to mass-produce customized products to order, e.g., in automobile industry. An important decision problem in this context receiving a lot of attention from researchers and practitioners is the sequencing problem, which decides on the succession of workpieces launched down the line. However, if multiple departments with diverging sequencing objectives are to be passed or unforeseen disturbances like machine breakdowns or material shortages occur, a resequencing of a given production sequence often becomes equally essential. This paper reviews existing research on resequencing in a mixed-model assembly line context. Important problem settings, alternative buffer configurations, and resulting decision problems are described. Finally, future research needs are identified as some relevant real-world resequencing settings have not been dealt with in literature up to now.  相似文献   

5.
Production processes in a wide range of industries rely on modern mixed-model assembly systems, which allow an efficient manufacture of various models of a common base product on the same assembly line. In order to facilitate a just-in-time supply of materials, the literature proposes various sequencing problems under the term “level scheduling”, which all aim at evenly smoothing the part consumption induced by the production sequence over time. Among these approaches, the popular product rate variation (PRV) problem is considered to be an appropriate approximate model, if either (i) all products require approximately the same number and mix of parts or (ii) part usages of all products are (almost completely) distinct. These statements are (iii) further specified by analytical findings, which prove the equivalence of product and material oriented level scheduling under certain conditions. These three prerequisites commonly cited in the literature when justifying the practical relevance of the PRV are evaluated by means of three simple computational experiments and are then discussed with regard to their relevance in practical settings. It is concluded that the PRV is in fact inappropriate for use in today’s real world mixed-model assembly systems.  相似文献   

6.
The generation of leveled production schedules is of high importance for mixed-model assembly lines whose parts and materials are supplied just-in-time by multi-level production processes. The Output Rate Variation problem is the standard mathematical representation of this complex level scheduling problem and has been extensively studied by research thus far. This work identifies novel symmetries in solution sequences of this problem class and shows how these insights can be used to improve exact solution procedures presented in the literature. The effectiveness of the modifications is evaluated by a computational study.  相似文献   

7.
In this paper we examine the various effects that workstations and rework loops with identical parallel processors and stochastic processing times have on the performance of a mixed-model production line. Of particular interest are issues related to sequence scrambling. In many production systems (especially those operating on just-in-time or in-line vehicle sequencing principles), the sequence of orders is selected carefully to optimize line efficiency while taking into account various line balancing and product spacing constraints. However, this sequence is often altered due to stochastic factors during production. This leads to significant economic consequences, due to either the degraded performance of the production line, or the added cost of restoring the sequence (via the use of systems such as mix banks or automated storage and retrieval systems). We develop analytical formulas to quantify both the extent of sequence scrambling caused by a station of the production line, and the effects of this scrambling on downstream performance. We also develop a detailed Markov chain model to analyze related issues regarding line stoppages and throughput. We demonstrate the usefulness of our methods on a range of illustrative numerical examples, and discuss the implications from a managerial point of view.  相似文献   

8.
This paper presents novel approaches for generating sequencing rules for the car sequencing (CS) problem in cases of two and multiple processing times per station. The CS problem decides on the succession of different car models launched down a mixed-model assembly line. It aims to avoid work overloads at the stations of the line by applying so-called sequencing rules, which restrict the maximum occurrence of labor-intensive options in a subsequence of a certain length. Thus to successfully avoid work overloads, suitable sequencing rules are essential. The paper shows that the only existing rule generation approach leads to sequencing rules which misclassify feasible sequences. We present a novel procedure which overcomes this drawback by generating multiple sequencing rules. Then, it is shown how to apply both procedures in case of multiple processing times per station. For both cases analytical and empirical results are derived to compare classification quality.  相似文献   

9.
Two-sided assembly lines are often designed to produce large-sized products, such as automobiles, trucks and buses. In this type of a production line, both left-side and right-side of the line are used in parallel. In all studies on two-sided assembly lines, the task times are assumed to be deterministic. However, in real life applications, especially in manual assembly lines, the tasks may have varying execution times defined as a probability distribution. The task time variation may result from machine breakdowns, loss of motivation, lack of training, non-qualified operators, complex tasks, environment, etc. In this paper, the problem of balancing two-sided assembly lines with stochastic task times (STALBP) is considered. A chance-constrained, piecewise-linear, mixed integer program (CPMIP) is proposed to model and solve the problem. As a solution approach a simulated annealing (SA) algorithm is proposed. To assess the effectiveness of CPMIP and SA algorithm, a set of test problems are solved. Finally, computational results indicating the effectiveness of CPMIP and SA algorithm are reported.  相似文献   

10.
Beam search (BS) is used as a heuristic to solve various combinatorial optimization problems, ranging from scheduling to assembly line balancing. In this paper, we develop a backtracking and an exchange-of-information (EOI) procedure to enhance the traditional beam search method. The backtracking enables us to return to previous solution states in the search process with the expectation of obtaining better solutions. The EOI is used to transfer information accumulated in a beam to other beams to yield improved solutions.  相似文献   

11.
In this paper, we study the problem of synchronized scheduling of assembly and air transportation to achieve accurate delivery with minimized cost in consumer electronics supply chain. This problem was motivated by a major PC manufacturer in consumer electronics industry. The overall problem is decomposed into two sub-problems, which consist of an air transportation allocation problem and an assembly scheduling problem. The air transportation allocation problem is formulated as an integer linear programming problem with the objective of minimizing transportation cost and delivery earliness tardiness penalties. The assembly scheduling problem seeks to determine a schedule ensuring that the orders are completed on time and catch the flights such that the waiting penalties between assembly and transportation is minimized. The problem is formulated as a parallel machine scheduling problem with earliness penalties. The computational complexities of the two sub-problems are investigated. The air transportation allocation problem with split delivery is shown to be solvable. The parallel machine assembly scheduling problem is shown to be NP-complete. Simulated annealing based heuristic algorithms are presented to solve the parallel machine problem.  相似文献   

12.
A second–order exponential time differencing scheme using the method of lines is developed in this article for the numerical solution of the Burgers and the modified Burgers equations. For each case, the resulting nonlinear system is solved explicitly using a modified predictor‐corrector method. The efficiency of the method introduced is tested by comparing experimental results with others selected from the available literature.  相似文献   

13.
We consider production lines consisting of a series of machines separated by finite buffers. The processing time of each machine is deterministic and all the machines have the same processing time. All machines are subject to failures. As is usually the case for production systems we assume that the failures are operation dependent [3,7]. Moreover, we assume that the times to failure and the repair times are exponentially distributed. To analyze such systems, a decomposition method was proposed by Gershwin [13]. The computational efficiency of this method was later significantly improved by the introduction of the socalled DDX algorithm [5,6]. In general, this method provides fairly accurate results. There are, however, cases for which the accuracy of this decomposition method may not be acceptable. This is the case when the reliability parameters (average failure time and average repair time) of the different machines have different orders of magnitude. Such a situation may be encountered in real production lines. In [8], an improvement of Gershwin's original decomposition method has been proposed that in general provides more accurate results in the above mentioned situation. This other method is referred to as the Generalized Exponential (GE) method. The basic difference between the GEmethod and that of Gershwin is that it uses a twomoment approximation instead of a singlemoment approximation of the repair time distributions of the equivalent machines. There are, however, still cases for which the accuracy of the GEmethod is not as good as expected. This is the case, for example, when the buffer sizes are too small in comparison with the average repair time. We present in this paper a new decomposition method that is based on a better approximation of the repair time distributions. This method uses a threemoment approximation of the repair time distributions of the equivalent machines. Numerical results show that the new method is very robust in the sense that it seems to provide accurate results in all situations.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号