首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
The paper deals with the assignment of a single server to two retrial queues. Each customer reapplies for service after an exponentially distributed amount of time. The server operates at customer dependent exponential rates. There are holding costs and costs during service per customer and per unit of time. We provide conditions on which it is optimal to allocate the server to queue 1 or 2 in order to minimize the expected total costs until the system is cleared.  相似文献   

2.
We show that the greedy highest density first (HDF) algorithm is (1+ε)-speed O(1)-competitive for the problem of minimizing the ?p norms of weighted flow time on m identical machines. Similar results for minimizing unweighted flow provide insight into the power of migration.  相似文献   

3.
We consider a queueing model wherein the resource is shared by two different classes of customers, primary (existing) and secondary (new), under a service level based pricing contract. This contract between secondary class customers and resource manager specifies unit admission price and quality of service (QoS) offered. We assume that the secondary customers’ Poisson arrival rate depends linearly on unit price and service level offered while the server uses a delay dependent priority queue management scheme. We analyze the joint problem of optimal pricing and operation of the resource with the inclusion of secondary class customers, while continuing to offer a pre-specified QoS to primary class customers. Our analysis leads to an algorithm that finds, in closed form expressions, the optimal points of the resulting non-convex constrained optimization problem. We also study in detail the structure and the non-linear nature of these optimal pricing and operating decisions.  相似文献   

4.
Parallel machine scheduling problems with a single server   总被引:3,自引:0,他引:3  
In this paper, we consider the problem of scheduling jobs on parallel machines with setup times. The setup has to be performed by a single server. The objective is to minimize the schedule length (makespan), as well as the forced idle time. The makespan problem is known to be NP-hard even for the case of two identical parallel machines. This paper presents a pseudopolynomial algorithm for the case of two machines when all setup times are equal to one. We also show that the more general problem with an arbitrary number of machines is unary NP-hard and analyze some list scheduling heuristics for this problem. The problem of minimizing the forced idle time is known to be unary NP-hard for the case of two machines and arbitrary setup and processing times. We prove unary NP-hardness of this problem even for the case of constant setup times. Moreover, some polynomially solvable cases are given.  相似文献   

5.
In this paper we study the scheduling of a given set of jobs on several identical parallel machines tended by a common server. Each job must be processed on one of the machines. Prior to processing, the server has to set up the relevant machine. The objective is to schedule the jobs so as to minimize the total weighted job completion times. We provide an approximation algorithm to tackle this intractable problem and analyze the worst-case performance of the algorithm for the general, as well as a special, case of the problem.  相似文献   

6.
We consider anM 2/G 2/1 type queueing system which serves two types of calls. In the case of blocking the first type customers can be queued whereas the second type customers must leave the service area but return after some random period of time to try their luck again. This model is a natural generalization of the classicM 2/G 2/1 priority queue with the head-of-theline priority discipline and the classicM/G/1 retrial queue. We carry out an extensive analysis of the system, including existence of the stationary regime, embedded Markov chain, stochastic decomposition, limit theorems under high and low rates of retrials and heavy traffic analysis.Visiting from: Department of Probability, Mechanics and Mathematics, Moscow State University, Moscow 119899, Russia.  相似文献   

7.
We consider a call center with two classes of impatient customers: premium and regular classes. Modeling our call center as a multiclass GI/GI/s+MGI/GI/s+M queue, we focus on developing scheduling policies that satisfy a target ratio constraint on the abandonment probabilities of premium customers to regular ones. The problem is inspired by a real call center application in which we want to reach some predefined preference between customer classes for any workload condition. The motivation for this constraint comes from the difficulty of predicting in a quite satisfying way the workload. In such a case, the traditional routing problem formulation with differentiated service levels for different customer classes would be useless. For this new problem formulation, we propose two families of online scheduling policies: queue joining and call selection policies. The principle of our policies is that we adjust their routing rules by dynamically changing their parameters. We then evaluate the performance of these policies through a numerical study. The policies are characterized by simplicity and ease of implementation.  相似文献   

8.
Many models for customers impatience in queueing systems have been studied in the past; the source of impatience has always been taken to be either a long wait already experienced at a queue, or a long wait anticipated by a customer upon arrival. In this paper we consider systems with servers vacations where customers’ impatience is due to an absentee of servers upon arrival. Such a model, representing frequent behavior by waiting customers in service systems, has never been treated before in the literature. We present a comprehensive analysis of the single-server, M/M/1 and M/G/1 queues, as well as of the multi-server M/M/c queue, for both the multiple and the single-vacation cases, and obtain various closed-form results. In particular, we show that the proportion of customer abandonments under the single-vacation regime is smaller than that under the multiple-vacation discipline. This work was supported by the Euro-Ngi network of excellence.  相似文献   

9.
We consider an integrated sequencing and scheduling problem arising at filling lines in dairy industry. Even when a processing sequence is decided, still a scheduling problem has to be solved for the sequence. This incorporates typical side constraints as they occur also in other sequencing problems in practice. Previously, we proposed a framework for general sequencing and scheduling problems: A genetic algorithm is utilized for the sequencing, incorporating a problem specific algorithm for the fixed-sequence scheduling. In this paper, we investigate how this approach performs for filling lines. Based on insights into structural properties of the problem, we propose different scheduling algorithms. In cooperation with Sachsenmilch GmbH, the algorithm was implemented for their bottleneck filling line, and evaluated in an extensive computational study. For the real data from production, our algorithm computes almost optimal solutions. However, as a surprising result, our simple greedy algorithms outperform the more elaborate ones in many aspects, showing interesting directions for future research.  相似文献   

10.
A stochastic branch-and-bound technique for the solution of stochastic single-machine-tardiness problems with job weights is presented. The technique relies on partitioning the solution space and estimating lower and upper bounds by sampling. For the lower bound estimation, two different types of sampling (“within” and “without” the minimization) are combined. Convergence to the optimal solution (with probability one) can be demonstrated. The approach is generalizable to other discrete stochastic optimization problems. In computational experiments with the single-machine-tardiness problem, the technique worked well for problem instances with a relatively small number of jobs; due to the enormous complexity of the problem, only approximate solutions can be expected for a larger number of jobs. Furthermore, a general precedence rule for the single-machine scheduling of jobs with uncertain processing times has been derived, essentially saying that “safe” jobs are to be scheduled before “unsafe” jobs.  相似文献   

11.
12.
The pricing problem where a company sells a certain kind of product to a continuum of customers is considered. It is formulated as a stochastic Stackelberg game with nonnested information structure. The inducible region concept, recently developed for deterministic Stackelberg games, is extended to treat the stochastic pricing problem. Necessary and sufficient conditions for a pricing scheme to be optimal are derived, and the pricing problem is solved by first delineating its inducible region, and then solving a constrained optimal control problem.The research work reported here as supported in part by the National Science Foundation under Grant ECS-81-05984, Grant ECS-82-10673, and by the Air Force Office of Scientific Research under AFOSR Grant 80-0098.  相似文献   

13.
In this paper we are concerned with a stochastic optimization approach for determining the optimal job-sequencing in a robot-handler production system, such that the best value of some performance indices which depend on control parameters are obtained. The idea is to reflect the possible control policies of the system in its Stochastic Petri Net model (SPN) and to select a suitable conflict resolution rule whenever the transitions representing the possible actions of the robot are enabled. This rule would depend on a vectorx n of control parameters, and the problem results in finding the values of those parameters which would be in some sense optimal for the system.The objective function is defined as a linear combination of several performance indices that are estimated simultaneously.We propose a combined simulation and optimization approach aimed at solving the conflict situations arising in the system due to simultaneous requests of the robot from jobs in different queues; then we establish a stochastic optimization approach for deriving control policies that govern the flow in the SPN model.The theoretical optimization criteria are presented along with a case study.  相似文献   

14.
In the context of stochastic resource-constrained project scheduling we introduce a novel class of scheduling policies, the linear preselective policies. They combine the benefits of preselective policies and priority policies; two classes that are well known from both deterministic and stochastic scheduling. We study several properties of this new class of policies which indicate its usefulness for computational purposes. Based on a new representation of preselective policies as and/or precedence constraints we derive efficient algorithms for computing earliest job start times and state a necessary and sufficient dominance criterion for preselective policies.  A computational experiment based on 480 instances empirically validates the theoretical findings.  相似文献   

15.
16.
We consider a finite-population queueing system with heterogeneous classes of customers and a single server. For the case of nonpreemptive service, we fully characterize the structure of the server's optimal service policy that minimizes the total average customer waiting costs. We show that the optimal service policy may never serve some classes of customers. For those classes that are served, we show that the optimal service policy is a simple static priority policy. We also derive sufficient conditions that determine the optimal priority sequence.  相似文献   

17.
18.
In some manufacturing situations, station tasks or operations can be shifted or redistributed to adjacent stations. This can be done when these stations have the appropriate equipment, and the workers on that station can perform the shifted work to a reasonable level of competency. This paper addresses such an environment and provides a general framework for applying the shifting or redistribution of tasks methodology to the intermediate storage, no-intermediate storage and no-wait flowshop problems. The outcome of this research is a way in which to utilise more efficiently the general-purpose facilities of this type of production environment. It includes mathematical models, recurrence equations and solution techniques for sequencing and scheduling. From an extensive numerical investigation, the benefits achieved by the application of this methodology are detailed.  相似文献   

19.
The doubly stochastic server is a time-sharing model of slightly greater versatility than any comparable model that has been analysed previously.The stationary distribution of its state is presented along with a necessary and sufficient condition of existence. Moreover, the conditional average response time of a job, given its requested processing time, is derived, and the stochastic law of the output stream is determined. The results are of a simple and useful form.
Zusammenfassung Es wird ein Modell eines einzelnen Bedieners vorgestellt und unter der Annahme einer diskreten Zeitskala untersucht. Die betrachteten Bedienungsdisziplinen enthalten solche, die für den time-sharing Betrieb von Rechenanlagen interessant sind, wie etwa eine round-robin Disziplin.
  相似文献   

20.
Stochastic scheduling problems are considered by using discounted dynamic programming. Both, maximizing pure rewards and minimizing linear holding costs are treated in one common Markov decision problem. A sufficient condition for the optimality of the myopic policy for finite and infinite horizon is given. For the infinite horizon case we show the optimality of an index policy and give a sufficient condition for the index policy to be myopic. Moreover, the relation between the two sufficient conditions is discussed.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号