首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 125 毫秒
1.
The problem of scheduling n jobs with known process times on m identical parallel machines with an objective of minimizing weighted flow time is NP-hard. However, when job weights are identical, it is well known that the problem is easily solved using the shortest processing time rule. In this paper, we show that a generalization of the shortest processing time rule minimizes weighted flow time in a class of problems where job weights are not identical.  相似文献   

2.
The multi-transshipment problem is NP-hard already for two commodities over bipartite networks. Nonetheless, using our recent theory of n-fold integer programming and extensions developed herein, we are able to establish the polynomial time solvability of the problem in two broad situations. First, for any fixed number of commodities and number of suppliers, we solve the problem over bipartite networks with variable number of consumers in polynomial time. This is very natural in operations research applications where few facilities serve many customers. Second, for every fixed network, we solve the problem with variable number of commodities in polynomial time.  相似文献   

3.
A t-spanner of an undirected, unweighted graph G is a spanning subgraph of G with the added property that for every pair of vertices in G, the distance between them in is at most t times the distance between them in G. We are interested in finding a sparsest t-spanner, i.e., a t-spanner with the minimum number of edges. In the general setting, this problem is known to be NP-hard for all t2. For t5, the problem remains NP-hard for planar graphs, whereas for t{2,3,4}, the complexity of this problem on planar graphs is still unknown. In this paper we present a polynomial time approximation scheme for the problem of finding a sparsest 2-spanner of a 4-connected planar triangulation.  相似文献   

4.
The maximum weight independent set problem for a general graph is NP-hard. But for some special classes of graphs, polynomial time algorithms do exist for solving it. Based on the divide-and-conquer strategy, Pawagi has presented anO(|V|log|V|) time algorithm for solving this problem on a tree. In this paper, we propose anO(|V|) time algorithm to improve Pawagi's result. The proposed algorithm is based on the dynamic programming strategy and is time optimal within a constant factor.  相似文献   

5.
In this paper we study multiprocessor and open shop scheduling problems from several points of view. We explore a tight dependence of the polynomial solvability/intractability on the number of allowed preemptions. For an exhaustive interrelation, we address the geometry of problems by means of a novel graphical representation. We use the so-called preemption and machine-dependency graphs for preemptive multiprocessor and shop scheduling problems, respectively. In a natural manner, we call a scheduling problem acyclic if the corresponding graph is acyclic. There is a substantial interrelation between the structure of these graphs and the complexity of the problems. Acyclic scheduling problems are quite restrictive; at the same time, many of them still remain NP-hard. We believe that an exhaustive study of acyclic scheduling problems can lead to a better understanding and give a better insight of general scheduling problems. We show that not only acyclic but also a special non-acyclic version of periodic job-shop scheduling can be solved in polynomial (linear) time. In that version, the corresponding machine dependency graph is allowed to have a special type of the so-called parti-colored cycles. We show that trivial extensions of this problem become NP-hard. Then we suggest a linear-time algorithm for the acyclic open-shop problem in which at most m−2 preemptions are allowed, where m is the number of machines. This result is also tight, as we show that if we allow one less preemption, then this strongly restricted version of the classical open-shop scheduling problem becomes NP-hard. In general, we show that very simple acyclic shop scheduling problems are NP-hard. As an example, any flow-shop problem with a single job with three operations and the rest of the jobs with a single non-zero length operation is NP-hard. We suggest linear-time approximation algorithm with the worst-case performance of ( , respectively) for acyclic job-shop (open-shop, respectively), where (‖ℳ‖, respectively) is the maximal job length (machine load, respectively). We show that no algorithm for scheduling acyclic job-shop can guarantee a better worst-case performance than . We consider two special cases of the acyclic job-shop with the so-called short jobs and short operations (restricting the maximal job and operation length) and solve them optimally in linear time. We show that scheduling m identical processors with at most m−2 preemptions is NP-hard, whereas a venerable early linear-time algorithm by McNaughton yields m−1 preemptions. Another multiprocessor scheduling problem we consider is that of scheduling m unrelated processors with an additional restriction that the processing time of any job on any machine is no more than the optimal schedule makespan C max *. We show that the (2m−3)-preemptive version of this problem is polynomially solvable, whereas the (2m−4)-preemptive version becomes NP-hard. For general unrelated processors, we guarantee near-optimal (2m−3)-preemptive schedules. The makespan of such a schedule is no more than either the corresponding non-preemptive schedule makespan or max {C max *,p max }, where C max * is the optimal (preemptive) schedule makespan and p max  is the maximal job processing time. E.V. Shchepin was partially supported by the program “Algebraical and combinatorial methods of mathematical cybernetics” of the Russian Academy of Sciences. N. Vakhania was partially supported by CONACyT grant No. 48433.  相似文献   

6.
In an article Cheng (2009) [3] published recently in this journal, it was shown that when k≥3, the problem of deciding whether the distinguishing chromatic number of a graph is at most k is NP-hard. We consider the problem when k=2. In regards to the issue of solvability in polynomial time, we show that the problem is at least as hard as graph automorphism, but no harder than graph isomorphism.  相似文献   

7.
The stable set problem is to find in a simple graph a maximum subset of pairwise non-adjacent vertices. The problem is known to be NP-hard in general and can be solved in polynomial time on some special classes, like cographs or claw-free graphs. Usually, efficient algorithms assume membership of a given graph in a special class. Robust algorithms apply to any graph G and either solve the problem for G or find in it special forbidden configurations. In the present paper we describe several efficient robust algorithms, extending some known results.  相似文献   

8.
In this paper we discuss the complexity and approximability of the minimum corridor connection problem where, given a rectilinear decomposition of a rectilinear polygon into “rooms”, one has to find the minimum length tree along the edges of the decomposition such that every room is incident to a vertex of the tree. We show that the problem is strongly NP-hard and give a subexponential time exact algorithm. For the special case when the room connectivity graph is k-outerplanar the algorithm running time becomes cubic. We develop a polynomial time approximation scheme for the case when all rooms are fat and have nearly the same size. When rooms are fat but are of varying size we give a polynomial time constant factor approximation algorithm.  相似文献   

9.
In this paper, we introduce the problem of computing a minimum edge ranking spanning tree (MERST); i.e., find a spanning tree of a given graph G whose edge ranking is minimum. Although the minimum edge ranking of a given tree can be computed in polynomial time, we show that problem MERST is NP-hard. Furthermore, we present an approximation algorithm for MERST, which realizes its worst case performance ratio where n is the number of vertices in G and Δ* is the maximum degree of a spanning tree whose maximum degree is minimum. Although the approximation algorithm is a combination of two existing algorithms for the restricted spanning tree problem and for the minimum edge ranking problem of trees, the analysis is based on novel properties of the edge ranking of trees.  相似文献   

10.
In this paper, we analyse the single machine maximum lateness minimization scheduling problem with the processing time based aging effect, where the processing time of each job is described by a non-decreasing function dependent on the sum of the normal processing times of preceded jobs. The computational complexity of this problem was not determined. However, we show it is strongly NP-hard by proving the strong NP-hardness of the single machine maximum completion time minimization problem with this aging model and job deadlines. Furthermore, we determine the boundary between polynomially solvable and NP-hard cases.  相似文献   

11.
In this paper we use Monte Carlo Techniques to deal with a real world delivery problem of a food company in Valencia (Spain). The problem is modeled as a set of 11 instances of the well known Vehicle Routing Problem, VRP, with additional time constraints. Given that VRP is a NP-hard problem, a heuristic algorithm, based on Monte Carlo techniques, is implemented. The solution proposed by this heuristic algorithm reaches distance and money savings of about 20% and 5% respectively. This work has been partially supported by thePlan de Incentivo a la Investigación/98 of the Universidad Politécnica de Valencia, under the project “Técnicas Monte Carlo aplicadas a Problemas de Rutas de Vehículos”.  相似文献   

12.
We study the maximum weighted independent-set problem on interval graphs with uncertainty on the vertex weights. We use the absolute robustness criterion and the min–max regret criterion to evaluate solutions. For a discrete scenario set, we find that the problem is NP-hard for each of the robustness criteria; we also provide pseudo-polynomial time algorithms when there is a constant number of scenarios and show that the problem is strongly NP-hard when the set of scenarios is unbounded. When the scenario set is a Cartesian product, we prove that the problem is equivalent to a maximum weighted independent-set problem on the same interval graph but without uncertainty for the first objective function and that the scenario set can be reduced for the second objective function.  相似文献   

13.
In this paper we study the problem of scheduling n jobs on a single machine with availability constraints. The objective is to minimize total weighted job completion times. We show that the problem is NP-hard in the strong sense. Then we consider two intractable special cases, namely, proportional weight case, and single availability constraint case. We propose two heuristics for these cases and analyze their worst-case error bounds.  相似文献   

14.
Method of augmenting graphs is a general approach to solve the maximum independent set problem. As the problem is generally NP-hard, no polynomial time algorithms are available to implement the method. However, when restricted to particular classes of graphs, the approach may lead to efficient solutions. A famous example of this type is the maximum matching algorithm: it finds a maximum matching in a graph G, which is equivalent to finding a maximum independent set in the line graph of G. In the particular case of line graphs, the method reduces to finding augmenting (alternating) chains. Recent investigations of more general classes of graphs revealed many more types of augmenting graphs. In the present paper we study the problem of finding augmenting graphs different from chains. To simplify this problem, we introduce the notion of a redundant set. This allows us to reduce the problem to finding some basic augmenting graphs. As a result, we obtain a polynomial time solution to the maximum independent set problem in a class of graphs which extends several previously studied classes including the line graphs.  相似文献   

15.
Quadratic programming with one negative eigenvalue is NP-hard   总被引:2,自引:0,他引:2  
We show that the problem of minimizing a concave quadratic function with one concave direction is NP-hard. This result can be interpreted as an attempt to understand exactly what makes nonconvex quadratic programming problems hard. Sahni in 1974 [8] showed that quadratic programming with a negative definite quadratic term (n negative eigenvalues) is NP-hard, whereas Kozlov, Tarasov and Haijan [2] showed in 1979 that the ellipsoid algorithm solves the convex quadratic problem (no negative eigenvalues) in polynomial time. This report shows that even one negative eigenvalue makes the problem NP-hard.This author's work supported by the Applied Mathematical Sciences Program (KC-04-02) of the Office of Energy Research of the U.S. Department of Energy under grant DE-FG02-86ER25013. A000 and in part by the National Science Foundation, the Air Force Office of Scientific Research, and the Office of Naval Research, through NSF grant DMS 8920550.  相似文献   

16.
Parallel machine scheduling problems with a single server   总被引:3,自引:0,他引:3  
In this paper, we consider the problem of scheduling jobs on parallel machines with setup times. The setup has to be performed by a single server. The objective is to minimize the schedule length (makespan), as well as the forced idle time. The makespan problem is known to be NP-hard even for the case of two identical parallel machines. This paper presents a pseudopolynomial algorithm for the case of two machines when all setup times are equal to one. We also show that the more general problem with an arbitrary number of machines is unary NP-hard and analyze some list scheduling heuristics for this problem. The problem of minimizing the forced idle time is known to be unary NP-hard for the case of two machines and arbitrary setup and processing times. We prove unary NP-hardness of this problem even for the case of constant setup times. Moreover, some polynomially solvable cases are given.  相似文献   

17.
Although the single machine scheduling problem to minimize the total weighted completion times with the sum-of-processing time based learning or aging effects have been known for a decade, it is still an open question whether these problems are strongly NP-hard. We resolve this issue and prove them to be strongly NP-hard with the learning effect as well as with the aging effect. Furthermore, we construct an exact parallel branch and bound algorithm for the problem with general sum-of-processing time based models, which can solve optimally moderate problem instances in reasonable time.  相似文献   

18.
In this paper, we consider a task allocation model that consists of assigning a set of m unmanned aerial vehicles (UAVs) to a set of n tasks in an optimal way. The optimality is quantified by target scores. The mission is to maximize the target score while satisfying capacity constraints of both the UAVs and the tasks. This problem is known to be NP-hard. Existing algorithms are not suitable for the large scale setting. Scalability and robustness are recognized as two main issues. We deal with these issues by two optimization approaches. The first approach is the Cross-Entropy (CE) method, a generic and practical tool of stochastic optimization for solving NP-hard problem. The second one is Branch and Bound algorithm, an efficient classical tool of global deterministic optimization. The numerical results show the efficiency of our approaches, in particular the CE method for very large scale setting.  相似文献   

19.
On scheduling an unbounded batch machine   总被引:1,自引:0,他引:1  
A batch machine is a machine that can process up to c jobs simultaneously as a batch, and the processing time of the batch is equal to the longest processing time of the jobs assigned to it. In this paper, we deal with the complexity of scheduling an unbounded batch machine, i.e., c=+∞. We prove that minimizing total tardiness is binary NP-hard, which has been an open problem in the literature. Also, we establish the pseudopolynomial solvability of the unbounded batch machine scheduling problem with job release dates and any regular objective. This is distinct from the bounded batch machine and the classical single machine scheduling problems, most of which with different release dates are unary NP-hard. Combined with the existing results, this paper provides a nearly complete mapping of the complexity of scheduling an unbounded batch machine.  相似文献   

20.
The problem of managing an Agile Earth Observing Satellite consists of selecting and scheduling a subset of photographs among a set of candidate ones that satisfy imperative constraints and maximize a gain function. We propose a tabu search algorithm to solve this NP-hard problem. This one is formulated as a constrained optimization problem and involves stereoscopic and time window visibility constraints; and a convex evaluation function that increases its hardness. To obtain a wide-ranging and an efficient exploration of the search space, we sample it by consistent and saturated configurations. Our algorithm is also hybridized with a systematic search that uses partial enumerations. To increase the solution quality, we introduce and solve a secondary problem; the minimization of the sum of the transition durations between the acquisitions. Upper bounds are also calculated by a dynamic programming algorithm on a relaxed problem. The obtained results show the efficiency of our approach.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号