首页 | 本学科首页   官方微博 | 高级检索  
     

ANL的2Q-LEBT装置的进展报告
引用本文:R.H.Scott,V.N.Asseev,T.V.Kulevoy,P.N.Ostroumov,E.A.Poklonskaya,M.Sengupta,N.E.Vinogradov. ANL的2Q-LEBT装置的进展报告[J]. 中国物理 C, 2007, 31(Z1): 111-114
作者姓名:R.H.Scott  V.N.Asseev  T.V.Kulevoy  P.N.Ostroumov  E.A.Poklonskaya  M.Sengupta  N.E.Vinogradov
作者单位:Physics Division Argonne National Laboratory,Argonne,IL 60439,USA,Physics Division,Argonne National Laboratory,Argonne,IL 60439,USA,ITEP,Moscow,I17259,Russia,Physics Division,Argonne National Laboratory,Argonne,IL 60439,USA,St.Petersburg Electrotechnical University,St.Petersburg,197376,Russia,Physics Division,Argonne National Laboratory,Argonne,IL 60439,USA,Northern Illinois University,De Kalb,IL 60115,USA
基金项目:Supported by the U.S.Department of Energy,Office of Nuclear Physics,under Contract No.W-31-109-ENG-38
摘    要:The concept for a 2 charge state injector for a"RIA type"accelerator has been presented.Progress toward an operational prototype 2Q-LEBT system at Argonne National Laboratory(ANL)is under way. The existing BIE 100 all permanent magnet ECR has been placed on a high voltage platform capable of a combined>100kV with q/m separation at ground level.Remote control of the devices on the platform has been implemented.Other components of the facility are currently being tested.The components of an achromatic bending system are currently being procured.This paper will present recent work at the facility as well as preliminary development of solid materials using the BIE 100.

收稿时间:2007-05-30
修稿时间:2007-04-20

Status of the 2Q-LEBT Facility at ANL
R.H.Scott,V.N.Asseev,T.V.Kulevoy,P.N.stroumov,E.A.Poklonskaya,M.Sengupta,N.E.Vinogradov. Status of the 2Q-LEBT Facility at ANL[J]. High Energy Physics and Nuclear Physics, 2007, 31(Z1): 111-114
Authors:R.H.Scott  V.N.Asseev  T.V.Kulevoy  P.N.stroumov  E.A.Poklonskaya  M.Sengupta  N.E.Vinogradov
Affiliation:R.H.Scott,V.N.Asseev,T.V.Kulevoy,P.N.0stroumov,E.A.Poklonskaya,M.Sengupta,N.E.Vinogradov
Abstract:The concept for a 2 charge state injector for a "RIA type" accelerator has been presented.Progress toward an operational prototype 2Q-LEBT system at Argonne National Laboratory(ANL)is under way.The existing BIE 100 all permanent magnet ECR has been placed on a high voltage platform capable of a combined>100kV with q/m separation at ground level.Remote control of the devices on the platform has been implemented.Other components of the facility are currently being tested.The components of an achromatic bending system are currently being procured.This paper will present recent work at the facility as well as preliminary development of solid materials using the BIE 100.
Keywords:ECR ion source  multi charge LEBT
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《中国物理 C》浏览原始摘要信息
点击此处可从《中国物理 C》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号