“聚龙一号”装置同步性实验研究
引用本文:计策, 丰树平, 夏明鹤, 等. “聚龙一号”装置同步性实验研究[J]. 强激光与粒子束, 2016, 28: 015021. doi: 10.11884/HPLPB201628.015021
作者姓名:计策  丰树平  夏明鹤  傅贞  李勇  姚斌  王玉娟
作者单位:1.中国工程物理研究院 流体物理研究所, 脉冲功率科学与技术重点实验室, 四川 绵阳 621 900
摘    要:分析了聚龙一号装置同步控制时序及Marx发生器、主开关、自击穿水开关工作状态对装置同步性的影响,Marx发生器的同步性影响装置的能量传输效率,主开关和自击穿水开关的同步性共同决定装置的同步性。实现装置精确同步的关键,即每台激光器经过左右分光后同时触发2个主开关导通,12台激光器可以独立调整精确的出光时间,用下方的主开关比上方的提前20 ns导通的方式来修正传输线长度上的差异,将自击穿水开关的电极间隙设置为合适的距离来控制其导通时间。实验结果表明,Marx发生器同步性抖动为11 ns,主开关和自击穿水开关上下分组的平均同步性抖动分别为4 ns和10 ns,聚龙一号装置的同步性抖动为6 ns。在同一负载参数下,磁绝缘传输线和负载电流具有较好的重复性。

关 键 词:聚龙一号   主开关   自击穿水开关   同步性   抖动
收稿时间:2015-09-23
修稿时间:2015-10-24

PTS experimental study on synchronization
Ji Ce, Feng Shuping, Xia Minghe, et al. PTS experimental study on synchronization[J]. High Power Laser and Particle Beams, 2016, 28: 015021. doi: 10.11884/HPLPB201628.015021
Authors:Ji Ce  Feng Shuping  Xia Minghe  Fu Zhen  Li Yong  Yao Bin  Wang Yujua
Affiliation:1. Key Laboratory of Pulsed Power,Institute of Fluid Physics,CAEP,P.O.Box 919-108,Mianyang 621900,China
Abstract:The time sequence control of the Marx generators, laser-triggered gas switches(LTS), self-break water switches (WS) which affects the PTS synchronization was studied. Synchronization of Marx generators affects energy efficiency of transmission process and PTS synchronization is mainly determined by LTS and SW. The key to achieve precise synchronization of the PTS is to independently and precisely adjust the trigger time of the 12 lasers, each laser is split into two beams used to trigger two laser triggered gas switches (LTGS). The LTGSs in the upper layer of PTS are triggered 20 ns later than the LTGSs in the lower layer to compensate the transmission time difference caused by length different between the transmission lines in the upper layer and the lower layer. The gap distances of the electrodes of the self-breaking water switches are set to suitable values to adjust the switching time. Experiments show that the synchronization jitters of the Marx generators, the main switches, the water switches, and the tri-plate transmission lines are 11, 4, 10 and 6 ns respectively. The 24 modules were well synchronized for the experimental shots. Currents of magnetically insulated transmission line (MITL) and load showed good repeatability with similar load.
Keywords:Primary Test Stand  laser-triggered gas switch  self-breaking water switch  synchronization  jitter