首页 | 本学科首页   官方微博 | 高级检索  
     检索      

大型公共建筑工程质量保险纯费率厘定研究——基于GLM及GAM的实证比较分析
引用本文:盛金喜,李慧民,段品生,郭海东.大型公共建筑工程质量保险纯费率厘定研究——基于GLM及GAM的实证比较分析[J].浙江大学学报(理学版),2020,47(5):642-650.
作者姓名:盛金喜  李慧民  段品生  郭海东
作者单位:西安建筑科技大学 土木工程学院,陕西 西安 710055
基金项目:住房和城乡建设部科技项目(ZLAQ(2015)?ZL?1;ZLAQ(2017)?ZL?4;ZLAQ(2018)?ZL?5).
摘    要:为准确地厘定大型公共建筑工程质量的保险纯费率,通过文献分析及调研,对影响大型公共建筑工程质量的因素进行了研究,提炼出11项保险费率因子。以46栋竣工于1993—2016年的大型公共建筑为工程数据集,在频率-强度法基础上,基于Poisson、Negative Binomial、Gamma、Inverse Gauss等分布的假设,利用广义线性模型及广义可加模型建立了8个工程质量保险纯费率厘定模型,通过比较选择最优模型,并对模型进行了验证。结果表明,所建模型可用于大型公共建筑工程质量保险纯费率厘定。

关 键 词:工程质量  费率厘定  广义线性模型(GLM)  广义可加模型(GAM)  大型公共建筑  
收稿时间:2019-09-08

Research on the pure premium rate making of quality insurance for large-cale public buildings:Empirical comparative analysis based on GLM and GAM
SHENG Jinxi,LI Huimin,DUAN Pinsheng,GUO Haidong.Research on the pure premium rate making of quality insurance for large-cale public buildings:Empirical comparative analysis based on GLM and GAM[J].Journal of Zhejiang University(Sciences Edition),2020,47(5):642-650.
Authors:SHENG Jinxi  LI Huimin  DUAN Pinsheng  GUO Haidong
Institution:School of Civil Engineering, Xi'an University of Architecture and Technology, Xi'an 710055, China
Abstract:In order to improve the accuracy of pure premium rate making of quality insurance for large-scale public building on the basis of literature analysis, this paper studies the influencing factors of quality loss of large-scale public building projects, and extracts 11 insurance premium rate factors. Based on the frequency-severity method and the distribution assumptions of Poisson distribution, Negative Binomial distribution, Gamma distribution and Inverse Gauss distribution, 8 quality insurance pure premium rate-making models are established by using generalized linear model and generalized additive model on the basis of 46 large-scale public buildings data sets completed in 1993—2016 in China, then the best model is selected and its rationality is verified. The results show that the model is suitable for the pure premium rate making of quality insurance for large-scale public building projects.
Keywords:large-scale public building  quality problem  rate-making  generalized additive model  generalized linear model  
点击此处可从《浙江大学学报(理学版)》浏览原始摘要信息
点击此处可从《浙江大学学报(理学版)》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号