首页 | 本学科首页   官方微博 | 高级检索  
     检索      

双塔联体分幅斜拉桥塔结构模型实验索力测试结果分析
引用本文:刘兆丰,戴显荣,赵人达,杨永清,王晓阳.双塔联体分幅斜拉桥塔结构模型实验索力测试结果分析[J].实验力学,2009,24(6):573-578.
作者姓名:刘兆丰  戴显荣  赵人达  杨永清  王晓阳
作者单位:1. 西南交通大学土木工程学院,四川成都,610031
2. 浙江省交通规范设计研究院,浙江杭州,310006
摘    要:以甬江特大斜拉桥为工程背景,对其整个联塔结构进行室内模型试验研究.针对模型试验中加载斜拉索的布置位置、数量及索力的确定,提出了最少索数的索力优化方法,编制了相应的数值程序.在满足预期目标的前提下,以最少斜拉索数量为原则,确定了试验中斜拉索的优化布置及相应的优化索力及各级加载索力,对优化索力和试验中的测试索力进行比较分析,结果表明索力优化方法可行,两联塔之间索力相互影响较小.

关 键 词:桥梁工程  斜拉桥  模型实验  联塔  索力优化
收稿时间:5/4/2009 12:00:00 AM

Measurement Result Analysis of Cable Forces in Model Experiment for Pylon of Cable-stayed Bridge with Twin-united Pylons and Twin Separate Girders
LIU Zhao-feng,Dai Xian-rong,ZHAO Ren-d,YANG Yong-qing and WANG Xiao-yang.Measurement Result Analysis of Cable Forces in Model Experiment for Pylon of Cable-stayed Bridge with Twin-united Pylons and Twin Separate Girders[J].Journal of Experimental Mechanics,2009,24(6):573-578.
Authors:LIU Zhao-feng  Dai Xian-rong  ZHAO Ren-d  YANG Yong-qing and WANG Xiao-yang
Institution:School of Civil Engineering, Southwest Jiaotong University, Chengdu Sichuan 610031, China;Zhejiang Provincial Institute of Communications Planing, Design and Research, Hangzhou 310006, China;School of Civil Engineering, Southwest Jiaotong University, Chengdu Sichuan 610031, China;School of Civil Engineering, Southwest Jiaotong University, Chengdu Sichuan 610031, China;Zhejiang Provincial Institute of Communications Planing, Design and Research, Hangzhou 310006, China
Abstract:Taking Yongjiang super-large cable-stayed bridge as an example, model experimental study of united twin-pylons was carried out. In order to optimally determine the position of stayed-cables, the number of stayed-cables and cable forces in the experiment, the mathematical programming mode and numerical program for the least cables were established. On the premise of meeting expected targets, the assign position, corresponding cable force and tension force under different load levels were optimally determined according to the principle of minimal cable number. The optimized cable forces and test cable forces were compared and analyzed. Results show that the optimized method is feasible and the interaction of cable forces between united twin-pylons is less.
Keywords:bridge engineering  cable-stayed bridge  model experiment  joint-pylon  cable tension optimization
本文献已被 万方数据 等数据库收录!
点击此处可从《实验力学》浏览原始摘要信息
点击此处可从《实验力学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号