攀枝花机场北东角滑坡整治措施研究
引用本文:龚志红,李天斌,龚习炜,李亚林.攀枝花机场北东角滑坡整治措施研究[J].力学学报,2007,15(2):237-243.
作者姓名:龚志红  李天斌  龚习炜  李亚林
作者单位:1. 成都理工大学环境与土木工程学院,成都610059; 2. 地质灾害防治与地质环境保护国家专业实验室,成都610059; 3. 攀枝花市保安营机场有限责任公司,攀枝花617000
摘    要:攀枝花机场地形及地质条件复杂,在修建过程中实施了大量的挖填方工程,填方边坡形成的沉降变形和滑坡成为机场主要的工程病害。本文阐述了机场北东角滑坡的基本特征及成因,综合反分析演算和试验结果确定了滑动面的抗剪强度参数,并对滑坡稳定性进行了参数敏感性分析。在滑坡推力计算的基础上,对滑坡整治方案进行对比论证,从而确立了以抗滑桩、预应力锚索框架、削坡减载和地表防排水为主的综合整治措施。

关 键 词:滑坡成因  整治工程  抗滑桩  预应力锚索框架
收稿时间:2006-10-18
修稿时间:2007-01-15

REMEDIATION MEASURES ON THE LANDSLIDE IN FILL SLOPES IN NORTH-EAST PART OF PANZHIHUA AIRPORT
GONG Zhihong,LI Tianbin,GONG Xiwei,LI Yalin.REMEDIATION MEASURES ON THE LANDSLIDE IN FILL SLOPES IN NORTH-EAST PART OF PANZHIHUA AIRPORT[J].chinese journal of theoretical and applied mechanics,2007,15(2):237-243.
Authors:GONG Zhihong  LI Tianbin  GONG Xiwei  LI Yalin
Institution:1. College of Environment and Civil Engineering, Chengdu University of Technology, Chengdu 610059; 2. The National Laboratory of Geological Hazard Prevention and Geological Environment Pretection, Chengdu 610059; 3. The Bao'anying Airport Co. Ltd of Panzhihua, Panzhihua 617000
Abstract:Panzhihua airport was constructed in an area with complicated topographical and geological conditions and therefore involved a large amount of excavation and filling works. At present, the settlement and landslide in filled land and slopes are substantial and cause the many problems for safe and smooth operation of the airport facilities. This paper presents the basic characters and causes of the landslides in the fill slopes. Based on the back-analysis and trial results, the paper ascertains the shear strength parameters at the shear plane of the slope deformation, and analyses the sensitivity that the shear strength parameters can make for the changes of the slope stability. Furthermore, on the basis of the landslide thrust calculation, the paper contrasts and demonstrates each remediation measure, and establishes a comprehensive remediation scheme which includes anti-slide piles, prestressed ground anchors with reinforced concrete beams on the surface, trimming back slopes and provision of surface drainages.
Keywords:Landslide investigation  Fill slope  Remediation measures  Airport