首页 | 本学科首页   官方微博 | 高级检索  
     检索      

雅砻江锦屏一级水电站坝址区实测地应力与重大工程地质问题分析
引用本文:谭成轩,张鹏,郑汉淮,孙炜锋,王继明,孙叶.雅砻江锦屏一级水电站坝址区实测地应力与重大工程地质问题分析[J].力学学报,2008,16(2):162-168.
作者姓名:谭成轩  张鹏  郑汉淮  孙炜锋  王继明  孙叶
作者单位:中国地质科学院地质力学研究所 北京 100083; 二滩水电开发有限责任公司 锦屏 615000; 国家电力公司成都勘测设计研究院 成都 610031; 中国地质大学 北京 100083
基金项目:国家自然科学基金项目(No. 50579098)和国土资源部百名人才计划联合资助.
摘    要:本文对雅砻江锦屏一级水电站坝址区Ⅱ1-Ⅱ1及其前后剖面实测地应力进行了系统整理分析。分析结果表明:在相同的水平和垂直埋深条件下左岸坡角应力大小较右岸坡角小,这主要是由边坡岩体结构确定的;左岸导流洞开挖过程中在应力大小较右岸低的情况下出现坍塌工程地质问题也与左岸边坡岩体结构有关,而非岩爆等诱发。另外对左岸岩体深部裂缝在已有研究成果的基础上从应力集中、能量积累角度初步提出了新的边坡变形破坏方式,并从岩体结构和地应力大小方面对锦屏一级水电站工程建设过程中左、右岸应注意的工程地质问题提出了初步建议。

关 键 词:锦屏一级水电站  地应力  重大工程地质问题  岩体结构
收稿时间:2007-05-15
修稿时间:2007-10-12

AN ANALYSIS ON IN-SITU CRUSTAL STRESS MEASUREMENTS AND MAJOR ENGINEERING GEOLOGY ISSUES AT THE DAM SITE AREA OF JINPING FIRST STAGE HYDROPOWER STATION
TAN Chengxuan,ZHANG Peng,ZHEN Hanhuai,SUN Weifeng,WANG Jiming,SUN Ye.AN ANALYSIS ON IN-SITU CRUSTAL STRESS MEASUREMENTS AND MAJOR ENGINEERING GEOLOGY ISSUES AT THE DAM SITE AREA OF JINPING FIRST STAGE HYDROPOWER STATION[J].chinese journal of theoretical and applied mechanics,2008,16(2):162-168.
Authors:TAN Chengxuan  ZHANG Peng  ZHEN Hanhuai  SUN Weifeng  WANG Jiming  SUN Ye
Institution:Institute of Geomechanics, Chinese academy of Geological Sciences, Beijing 100083; Ertan Hydropower Development Ltd. Co., Jinping 615000; Chengdu Institute of Investigation and Design, State Electricity Company, Chengdu 610031; China University of Geosciences, Beijing 100083
Abstract:This paper has systematicly managed and analysized the in-situ crustal stress measurements around the Ⅱ1~Ⅱ1 section at the dam site of Jinping first stage hydropower station. The results show that the geo-stress magnitudes at the right abutment slope foot are bigger than the ones at the left abutment slope foot at nearly same horizontal and vertical burying depths, which is controlled by rock mass constitution, and that the collapse engineering geology problem in the process of left abutment slope water diversion tunnelling at this crustal stress conditions is also related to the left abutment slope rock mass constitution, but not caused by rockbursts and so on. In addition, on the basis of all existed research achievements on deep fractures in the left abutment slope, a new model from geo-stress and strain energy enconcentrations is given to explain the deep fissures, and some suggestions on the possible engineering geology issues from rock mass constitution and geo-stress magnitudes are also given to pay much attention on the both abutment slopes in the hydropower station construction.
Keywords:Jinping first stage hydropower station  Crustal stress  Major engineering geology issues  Rock mass constitution
点击此处可从《力学学报》浏览原始摘要信息
点击此处可从《力学学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号