Correction of vertical displacement of extracted beam during commissioning tests of the DC-110 cyclotron
Authors:B N Gigal  I A Ivanenko  N Yu Kazarinov  I V Kalagin  V I Mironov  E V Samsonov
Institution:1. Flerov Laboratory of Nuclear Reaction, Joint Institute for Nuclear Research, Dubna, 141980, Russia
Abstract:The specialized DC-110 heavy ion cyclotron has been developed and created at the Laboratory of Nuclear Reactions of the Joint Institute for Nuclear Research for the BETA research and production complex in Dubna (Russia), which allows producing intense accelerated Ar, Kr, and Xe ion beams with a fixed energy of 2.5 MeV/nucleon. Commissioning works on the cyclotron complex, during which the design parameters were obtained, were carried out at the end of 2012. During commissioning of the accelerator, vertical displacement of the beam was found at the final acceleration radii and during its extraction. It is shown that the main cause of this displacement was the occurrence of a radial component of the magnetic field in the median plane of the magnet caused by asymmetry of the magnetic circuit. Vertical beam displacement was corrected by creating asymmetry of the current in the main electromagnet winding of the DC-110 cyclotron.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号