首页 | 本学科首页   官方微博 | 高级检索  
     检索      

Arc Power Limit and Distribution on the Large Negative Ion Source Based on JT-60 NNBI
作者姓名:LEIGuangjiu  N.Umeda  M.Kawai  T.Yamamoto  M.Kuriyama  T.Ohga  N.Ebisawa  T.Yamazaki  M.Kusaka  K.Kikuchi  S.Hikida  K.Usui  M.Kazawa  S.Numazawa  K.Mogaki  A.Honda  F.Satoh  S.Norio  K.Ooshima
作者单位:[1]NakaFusionResearchEstablishment,JapanAtomicEnergyResearchInstitute,Naka-gun,Ibraraki-ken311-0193,Japan [3]不详,JapanAtomicEnergyResearchInstitute,Naka-gun,Ibraraki-ken311-0193,Japan
摘    要:The target of the large negative ion source based on neutral beam injection (N-NBI) is to produce neutral beam current of 22 A and beam power of 10 MW at 500 keV with duration time of 10 s. Since it was successfully operated in 1996, the 5.3 MW neutral beam power at 380 keV with duration time of 3 s has been achieved. In recent years improving and enhancing the beam power are going on. Several reasons such as plasma non-uniformity, higher beam density at the upper region in the beam profile,

关 键 词:能量限制  能量分配  负离子  中性电子束  等离子体
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号