首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Performance of the heuristic procedures for constrained projects with progress payments
Authors:C Sepil  N Ortac
Institution:1.Department of Industrial Engineering,Middle East Technical University,Turkey;2.Aselsan Military Electronics,Turkey
Abstract:All large scale resource constrained projects involve cash flows occurring during their life cycle. Several recent studies consider the problem of scheduling projects to maximise the net present value (NPV) of these cash flows. Their basic common assumption is that cash flows are mainly associated with specific events and they occur at event realisation times. An alternative assumption, which can be more realistic, is that cash inflows occur periodically, for example every month, as progress payments. This article considers the problem of maximising NPV given the alternative assumption. Three different heuristic rules are developed. The performance of these heuristic rules is analysed through a full factorial experiment with 108 scheduling conditions. The results indicate that three rules provide near-optimal schedules with respect to NPV maximisation while producing time schedules that do not delay the project completion time extensively.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号