首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Planning performance based contracts considering reliability and uncertain system usage
Authors:T Jin  P Wang
Institution:1.Texas State University,TX,USA;2.Hamilton Sundstrand Power Systems,CA,USA
Abstract:This paper investigates a novel quantitative approach for planning and contracting performance-based logistics in the presence of uncertain system usage. Our efforts focus on an integrated service delivery environment where the manufacturer develops capital-intensive systems and also provides after-sales support. We propose an analytical model to characterize system operational availability by comprehending five performance drivers: inherent failure rate, usage rate, spare parts inventory, repair time, and the fleet size. This analytical insight into the system performance allows the service supplier to minimize the total cost across system design, production, maintenance, and repair. Two contracting schemes are investigated under cost minimization and profit maximization schemes. For the first time in literature, reliability design and service parts logistics are seamlessly integrated into one decision support model for improving operational availability while lowering the lifecycle cost. Numerical examples are provided to demonstrate the applicability and the effectiveness of the proposed decision support tool.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号