首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Minimizing makespan and throughput times at Aalsmeer flower auction
Authors:R de Koster  M Yu
Institution:1.RSM Erasmus University,The Netherlands
Abstract:At Bloemenveiling Aalsmeer (VBA), about 19 million flowers have to be distributed daily to customers in a building of 1 million?m2 within a few hours. With the increasing daily number of customer orders, the congestion in the main distribution area increases. As a consequence, the makespan exceeds the available time, and flowers arrive too late at the customers. This paper investigates the concept of zoning in the distribution process, where distributors work in teams for a fixed group of customers in a specific zone of the distribution area. Customers are assigned to zones to balance workload. We show by simulation that this way of organizing the distribution process reduces congestion and leads to considerable improvements in both makespan and transaction lead time.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号