Project selection,scheduling and resource allocation with time dependent returns
Authors:Jiaqiong Chen  Ronald G Askin
Institution:1. FedEx World Headquarters, 3680 Hacks Cross Road, Building H, Second Floor, Memphis, TN 38125, United States;2. Department of Industrial Engineering, Arizona State University, Tempe, AZ 85287-5906, United States
Abstract:In this paper we formulate and analyze the joint problem of project selection and task scheduling. We study the situation where a manager has many alternative projects to pursue such as developing new product platforms or technologies, incremental product upgrades, or continuing education of human resources. Project return is assumed to be a known function of project completion time. Resources are limited and renewable. The objective is to maximize present worth of profit. A general mathematical formulation that can address several versions of the problem is presented. An implicit enumeration procedure is then developed and tested to provide good solutions based on project ordering and a prioritization rule for resource allocation. The algorithm uses an imbedded module for solving the resource-constrained project scheduling problem at each stage. The importance of integrating the impact of resource constraints into the selection of projects is demonstrated.
Keywords:Project management  Project selection  Integer programming  Heuristics  Implicit enumeration
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号