首页 | 本学科首页   官方微博 | 高级检索  
     检索      


The scheduling of deliveries in a production-distribution system with multiple buyers
Authors:Jiafu Tang  Kai-Leung Yung  Iko Kaku  Jianbo Yang
Institution:(1) Department of Systems Engineering, Key Laboratory of Integrated Automation of Process Industry of MOE, School of Information Science and Engineering, Northeastern University, Shenyang, 110004, People’s Republic of China;(2) Department of Industrial and Systems Engineering, The Hong Kong Polytechnic University, Hung Hom, Kowloon Hong Kong, SAR, People’s Republic of China;(3) Department of Management Science and Engineering, The Akita Prefectural University, Hongjo, Akita, Japan;(4) Decision Sciences and Operations Management Group, Manchester Business School, The University of Manchester, Manchester, M15 6 PB, UK
Abstract:In a real production and distribution business environment with one supplier and multiple heterogeneous buyers, the differences in buyers’ ordering cycles have influence on production arrangements. Consequently, the average inventory level (AIL) at the supplier’s end is affected by both the production policy and the ordering policy, typically by the scheduling of deliveries. Consequently, the average inventory holding cost is most deeply affected. In this paper, it is proposed that the scheduling of deliveries be formulated as a decision problem to determine the time point at which deliveries are made to buyers in order to minimize the supplier’s average inventory. A formulation of the average inventory level (AIL) in a production cycle at the supplier’s end using a lot-for-lot policy is developed. Under the lot-for-lot policy, the scheduling of deliveries (SP) is formulated as a nonlinear programming model used to determine the first delivery point for each buyer with an objective to minimize the sum of the product of the individual demand quantity and the first delivery time for each buyer. Thus, the SP model determines not only the sequence of the first deliveries to individual buyers, but also the time when the deliveries are made. An iterative heuristic procedure (IHP) is developed to solve the SP model assuming a given sequence of buyers. Six sequence rules are considered and evaluated via simulation.
Keywords:Buyer-vendor coordination  Scheduling of deliveries  Heuristics procedure  Lot-for-lot-policy
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号