首页 | 本学科首页   官方微博 | 高级检索  
     检索      


A constraint programming approach for the resource-constrained project scheduling problem
Authors:Olivier Liess  Philippe Michelon
Institution:(1) Université d’Avignon et des Pays de Vaucluse, Laboratoire d’Informatique d’Avignon, 339 chemin des Meinajariès, Agroparc BP 1228, 84911 Avignon Cedex 9, France;(2) MPCOMP, Universidade Estaduale do Ceará, Av. Paranjana, 1700, Campus do Itaperi, Fortaleza, Ceará, CEP 601740-000, Brazil
Abstract:A “pure” Constraint Programming approach for the Resource-Constrained Project Scheduling Problem (RCPSP) is presented. Our basic idea was to substitute the resource constraints by a set of “sub-constraints” generated as needed. Each of these sub-constraints corresponds to a set of tasks that cannot be executed together without violating one of the resource constraints. A filtering algorithm for these sub-constraints has been developed. When applied to the initial resource constraints together with known filtering algorithms, this new filtering algorithm provides very good numerical results.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号