首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Average Cost Optimality for an Unreliable Two-Machine Flowshop with Limited Internal Buffer
Authors:Ernst L Presman  Suresh P Sethi  Hanqin Zhang  Arnab Bisi
Institution:(1) Central Economics and Mathematics Institute, The Russian Academy of Sciences, Moscow, Russia;(2) School of Management, The University of Texas at Dallas, Box 830688, Richardson, TX 75083-0688, USA;(3) Institute of Applied Mathematics Academia Sinica, Beijing, 100080, P.R. China
Abstract:We consider a production planning problem in a two-machine flowshop subject to breakdown and repair of machines and subject to nonnegativity and upper bound constraints on work-in-process. The objective is to choose machine production rates over time to minimize the long-run average inventory/backlog and production costs. For sufficiently large upper bound on the work-in-process, the problem is formulated as a stochastic dynamic program. We then establish a verification theorem and a partial characterization of the optimal control policy if it exists.
Keywords:production planning  stochastic dynamic programming  optimal control  long-run average cost
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号