首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于关键链改进搜索的遗传算法求解分布式多项目调度
引用本文:张静文,刘婉君,李琦.基于关键链改进搜索的遗传算法求解分布式多项目调度[J].运筹与管理,2021,30(3):123-129.
作者姓名:张静文  刘婉君  李琦
作者单位:西北工业大学 管理学院, 陕西 西安 710072
基金项目:国家自然科学基金资助项目(71971173,71572148);中央高校基本科研业务费项目(3102019JC02);陕西省自然科学基金项目(2020JM-146);西北工业大学研究生创新基金资助项目(ZZ2019038,CX2020026)。
摘    要:针对基于多代理系统求解分布式多项目调度问题的不足, 开发了一种适应性的遗传算法ccm_GA。ccm_GA的独特性体现为两点:第一, 修正的串行调度过程分两个阶段分别消除全局资源和本地资源冲突; 第二, 在满足两类资源约束的调度方案中, 识别出关键链并改变关键活动在活动序列编码中的位置以增加解的多样性从而提高搜索效率。设计并实施大规模数值实验测试算法性能, 与现有文献中的六种算法作对比, 结果表明:ccm_GA在50%的算例集上获得的测试指标都好于六种算法, 且对于资源约束越紧的算例集, ccm_GA的求解效果越好。

关 键 词:分布式多项目调度  全局资源  本地资源  修正串行调度  关键链  
收稿时间:2019-02-12

An Adapted Genetic Algorithm Based on the Critical Chain with Improving Search to Solve the Decentralized Resource-constrained Multi-project Scheduling Problem
ZHANG Jing-wen,LIU Wan-jun,LI Qi.An Adapted Genetic Algorithm Based on the Critical Chain with Improving Search to Solve the Decentralized Resource-constrained Multi-project Scheduling Problem[J].Operations Research and Management Science,2021,30(3):123-129.
Authors:ZHANG Jing-wen  LIU Wan-jun  LI Qi
Institution:School of Management, Northwestern Polytechnical University, Xi’an 710072, China
Abstract:Aimed at the deficiency of solving decentralized multi-project scheduling problem based on multi-agent system,an adapted genetic algorithm ccm_GA is developed.The uniqueness of the ccm_GA is reflected in two aspects.First,the amended serial scheduling process eliminatesboth global and local resource conflicts in two stages.Second,in scheduling schemes that satisfy two types of resource constraints,the critical chain is identified and the position of the critical activity in the activity sequence coding is changed to increase the diversity of the solution so as to improve the search efficiency.Numerical experiments are designed and carried out to test the performance of the algorithm,and the results are compared with the six algorithms in the existing literature.The results show that:ccm_GA has better test indexes than the other six algorithms in 50%of the example sets.And the tighter the resource constraints are,the better the solution results of ccm_GA are.
Keywords:decentralized multi-project scheduling  global resources  local resources  amended serial scheduling  critical chain
本文献已被 CNKI 维普 等数据库收录!
点击此处可从《运筹与管理》浏览原始摘要信息
点击此处可从《运筹与管理》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号