首页 | 本学科首页   官方微博 | 高级检索  
     检索      

有两种故障状态的两部件串联系统的预防维修策略
引用本文:高俏俏.有两种故障状态的两部件串联系统的预防维修策略[J].运筹与管理,2021,30(3):117-122.
作者姓名:高俏俏
作者单位:山西大学 经济与管理学院, 山西 太原 030006
基金项目:山西省高等学校哲学社会科学研究项目(2019W020)。
摘    要:本文研究的是由两个部件串联组成且有两种故障状态的系统的预防维修策略, 当系统的工作时间达到T时进行预防维修, 预防维修使部件恢复到上一次故障维修后的状态。每个部件发生故障都有两种状态, 可维修和不可维修。当部件的故障为可维修故障时, 修理工对其进行故障维修, 且每次故障维修后的工作时间形成随机递减的几何过程, 每次故障后的维修时间形成随机递增的几何过程。当部件发生N次可维修故障或一次不可维修故障时进行更换。以部件进行预防维修的间隔和更换前的可维修故障次数N组成的二维策略(T, N) 为策略, 利用更新过程和几何过程理论求出了系统经长期运行单位时间内期望费用的表达式, 并给出了具体例子和数值分析。

关 键 词:更新过程  几何过程  故障维修  预防维修  期望费用  
收稿时间:2018-11-28

The Preventive Maintenance Policy for a Two-component Series System with Two Types of Failures
GAO Qiao-qiao.The Preventive Maintenance Policy for a Two-component Series System with Two Types of Failures[J].Operations Research and Management Science,2021,30(3):117-122.
Authors:GAO Qiao-qiao
Institution:College of Economic Management, Shanxi University, Taiyuan 030006, China
Abstract:In this paper,we study the preventive maintenance policy for a two-component series system with two types of failures.When the working time of the system reaches,the system will be preventively repaired,and the preventive maintenance will restore every component to the state which is the same as the last failure repair.The system has two types of failures,one is repairable,the other is unrepairable.When the repairable failure occurs,the system will be repaired by the repairman,the successive survival times of the component will form a stochastically decreasing geometric process and the consecutive repair times after component failures will form a stochastically increasing geometric process.The system will be replaced by a new and identical one at the time following theth repairable failure or once unrepairable failure.We look for a bivariate policy,whoseis the time interval of two consecutive preventive maintenance,is the repairable failure time of the component before replacement.By using the renewal process theory and geometric process theory,the explicit expression of the long-run expected cost per unit time is derived.Finally,a numerical example is given.
Keywords:renewal process  geometric process  failure repair  preventive maintenance  expected cost
本文献已被 CNKI 维普 等数据库收录!
点击此处可从《运筹与管理》浏览原始摘要信息
点击此处可从《运筹与管理》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号