首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于连续用电量和缴费时间差的客户信用动态评价模型
引用本文:谢宏伟,魏伟,郭崇慧,陈海民,李文杰,陈冲.基于连续用电量和缴费时间差的客户信用动态评价模型[J].运筹与管理,2020,29(1):141-147.
作者姓名:谢宏伟  魏伟  郭崇慧  陈海民  李文杰  陈冲
作者单位:1. 国网内蒙古东部电力有限公司,内蒙古 呼和浩特 010000;2. 大连理工大学 系统工程研究所,辽宁 大连 116024;3. 南瑞集团公司国网电力科学研究院 ,江苏 南京 211106;4. 北京科东电力控制系统有限责任公司,北京 100000
基金项目:国家自然科学基金面上项目(71771034);国家自然科学基金青年科学基金项目(71501023);国家自然科学基金创新群体项目(71421001)
摘    要:加大供电量和提高电费回收效率是供电商增加收益的主要途径,并且用电客户的缴费时间差直接影响着电费回收效率.在用电客户信息较少的情况下,仅仅依赖用电客户的用电量信息和缴费时间差信息,采用扩展的"S型"函数对用电量信息和缴费时间差信息进行整合建模,构建了一个能够度量客户持续用电能力和缴纳电费积极性的客户信用动态评价模型.应用构建的模型对赤峰市宁城县实际用电客户进行信用评价,评价结果与领域专家评价结果具有较高的一致性.

关 键 词:用电量  缴费时间差  客户信用  动态评价模型  信用评价
收稿时间:2016-08-31

Dynamic Rating Model for User Credit Based on Continuous Electricity Consumption and Payment Time Interval
XIE Hong-wei,WEI Wei,GUO Cheng-hui,CHENG Hai-ming,LI Wen-jie,CHENG Chong.Dynamic Rating Model for User Credit Based on Continuous Electricity Consumption and Payment Time Interval[J].Operations Research and Management Science,2020,29(1):141-147.
Authors:XIE Hong-wei  WEI Wei  GUO Cheng-hui  CHENG Hai-ming  LI Wen-jie  CHENG Chong
Institution:1. East Inner Mongolia Electric Power Company Limited, Inner, Hohhot 010020, China;2. Institute of Systems Engineering, Dalian University of Technology, Dalian 116024, China;3. NARI Group Corporation(State Grid Electric Power Research Institute), Nanjing 211106, China;4. Beijing Kedong Power Control System Company Limited, Beijing 100000, China
Abstract:Increasing power supply and improving the tariff recovery efficiency are the major approaches for power suppliers to enlarge their profit. And the payment time interval of electricity customers affects the completion of tariff recovery directly. Only using the information of users' continuous electricity consumption and payment time interval, we build a dynamic credit rating model by integrating both electricity consumption and payment time interval information based on improved “S” function. This model can be used for the dynamic evaluation of the continuous electricity consumption ability and payment positivity of electricity customers. Applying this model to the credit rating of electricity customers in Ningcheng county, Chifeng city, we verify that the credit rating results have high consistency with the results given by domain experts.
Keywords:electricity consumption  payment time interval  user credit  dynamic rating model  credit rating  
本文献已被 CNKI 维普 等数据库收录!
点击此处可从《运筹与管理》浏览原始摘要信息
点击此处可从《运筹与管理》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号