首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Dispatch planning using newsvendor dual problems and occupation times: Application to hydropower
Authors:M Densing
Institution:Energy Economics Group, Paul Scherrer Institute, 5232 Villigen PSI, Switzerland
Abstract:We consider price-driven dispatch planning under price uncertainty: A storable commodity is optimally sold and purchased over time. First, we consider models where the storage level is constrained in expectation. The dual of the corresponding optimization problem is related to the newsvendor problem. Exact solutions of bang-bang type are given. The second methodology is for high-frequency dispatch decisions in multistage stochastic programming models: To overcome the curse of dimensionality, prices are modeled by occupation times at price levels. In a case study, we consider a pumped-storage hydropower plant: Numerical solutions are given, which have similar patterns as for the first, exactly solvable problems.
Keywords:Dispatch planning  Bang-bang control  Newsvendor problem  Occupation time  Multistage stochastic linear programming  Hydropower optimization
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号