首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Two-machine flowshop scheduling to minimize the number of tardy jobs
Authors:J N D Gupta  A M A Hariri
Institution:1.Ball State University,USA;2.King Abdul Aziz University,Saudi Arabia
Abstract:We consider the two-machine flowshop problem with the objective of minimizing the total number of tardy jobs. Since this problem is known to be strongly NP-hard, algorithms are described for four polynomially solvable special cases. In addition, several heuristic algorithms are developed to find optimal or near optimal schedules. Results of computational tests in solving problems up to 60 jobs are reported and directions for future research are provided.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号