首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Recursive functions on the plane and FPTASs for production planning and scheduling problems with two facilities
Authors:Sergei Chubanov  Erwin Pesch
Institution:1.Institute of Information Systems at the University of Siegen,Siegen,Germany
Abstract:We consider a production model with two facilities sharing a resource during a time horizon consisting of a number of time periods. Cumulative production levels at the ends of consecutive periods are linked with constraints of a general form. This allows us to give different interpretations related to scheduling and input–output analysis. The model may arise either separately or in the structure of more general production models. In both cases it is reasonable to find an optimal or near-optimal distribution of resources between these two facilities. This helps either to develop a new production plan or to improve an existing one. The problem in question is NP-hard. We show that our approach leads to fully polynomial time approximation schemes (FPTASs).
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号