首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Scheduling unit processing time jobs on an <Emphasis Type="Italic">m</Emphasis>-machine flow-shop
Authors:G Mosheiov
Institution:1.The Hebrew University,Jerusalem,Israel
Abstract:The sequential production of identical jobs and the flow-shop machine setting are extremely common in real-life applications. We study a scheduling problem that combines these two elements: jobs of identical processing time, with job-dependent weights, and a given common due date processed on an m-machine flow-shop. The (just-in-time) objective is to minimize the maximum earliness/tardiness cost. We introduce a polynomial time solution in both cases of (i) a non-restrictive (ie, sufficiently large) due date, and (ii) a restrictive due date (which restricts the number of early jobs).
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号