首页 | 本学科首页   官方微博 | 高级检索  
     


Solving symmetric mixed-model multi-level just-in-time scheduling problems
Authors:Malte Fliedner  Nils Boysen
Affiliation:a Friedrich-Schiller-Universität Jena, Lehrstuhl für Operations Management, Carl-Zeiß-Straße 3, D-07743 Jena, Germany
b Friedrich-Schiller-Universität Jena, Lehrstuhl für Betriebswirtschaftliche Entscheidungsanalyse, Carl-Zeiß-Straße 3, D-07743 Jena, Germany
Abstract:
The generation of leveled production schedules is of high importance for mixed-model assembly lines whose parts and materials are supplied just-in-time by multi-level production processes. The Output Rate Variation problem is the standard mathematical representation of this complex level scheduling problem and has been extensively studied by research thus far. This work identifies novel symmetries in solution sequences of this problem class and shows how these insights can be used to improve exact solution procedures presented in the literature. The effectiveness of the modifications is evaluated by a computational study.
Keywords:Mixed-model assembly lines   Level scheduling   Output Rate Variation problem   Dynamic programming
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号